Superseded
, Confirmed
Standard
Historical
IEEE 741:1997 (R2002)
IEEE Standard Criteria for the Protection of Class 1E Power Systems and Equipment in Nuclear Power Generating Stations
Summary
Revision Standard - Superseded.
Superseded by IEEE Std 741-2007. This standard prescribes criteria that establish protection requirements for Class 1E power systems and equipment. It describes the purpose of and the means for obtaining protection from electrical and mechanical damage, or failures that can occur within a time period that is shorter than that required for operator action. It includes testing and surveillance requirements. It does not include plant physical design requirements to protect against events such as pipe whip, fire, dropped load, etc.
This standard prescribes criteria that establish protection requirements for Class 1E power systems and equipment. It describes the purpose of and the means for obtaining protection from electrical and mechanical damage, or failures that can occur within a time period that is shorter than that required for operator action. It includes testing and surveillance requirements. It does not include plant physical design requirements to protect against events such as pipe whip, fire, dropped load, etc.
Superseded by IEEE Std 741-2007. This standard prescribes criteria that establish protection requirements for Class 1E power systems and equipment. It describes the purpose of and the means for obtaining protection from electrical and mechanical damage, or failures that can occur within a time period that is shorter than that required for operator action. It includes testing and surveillance requirements. It does not include plant physical design requirements to protect against events such as pipe whip, fire, dropped load, etc.
This standard prescribes criteria that establish protection requirements for Class 1E power systems and equipment. It describes the purpose of and the means for obtaining protection from electrical and mechanical damage, or failures that can occur within a time period that is shorter than that required for operator action. It includes testing and surveillance requirements. It does not include plant physical design requirements to protect against events such as pipe whip, fire, dropped load, etc.
Notes
Superseded
Technical characteristics
| Publisher | Institute of Electrical and Electronics Engineers (IEEE) |
| Publication Date | 11/30/1996 |
| Confirmation Date | 06/13/2002 |
| Edition | |
| Page Count | 52 |
| EAN | --- |
| ISBN | --- |
| Weight (in grams) | --- |
| Brochures |
|
Amendments replaces
05/10/1990
Superseded
Historical
Previous versions
01/02/2008
Superseded
Historical
30/11/1996
Superseded
, Confirmed
Historical
05/10/1990
Superseded
Historical
24/02/1986
Superseded
Historical