Superseded
Standard
Historical
IEEE 336:1977
IEEE Standard Installation, Inspection, and Testing Requirements for Instrumentation and Electric Equipment During the Construction of Nuclear Power Generating Stations
Summary
Revision Standard - Superseded.
This standard sets forth the requirements for installation, inspection, and testing of Class IE electric power, instrumentation, and control equipment and systems during the construction phase of a nuclear power generating station. These requirements are intended to assure that only materials and equipment of acceptable quality are incorporated into the plant, that quality is maintained and quality workmanship prevails throughout the construction process, and that completed installations conform to specified requirements, so as to promote public safety, prevent accidents, and mitigate the consequences of accidents if they occur, and provide a high degree of plant reliability.
This standard sets forth the requirements for installation, inspection, and testing of Class IE electric power, instrumentation, and control equipment and systems during the construction phase of a nuclear power generating station. These requirements are intended to assure that only materials and equipment of acceptable quality are incorporated into the plant, that quality is maintained and quality workmanship prevails throughout the construction process, and that completed installations conform to specified requirements, so as to promote public safety, prevent accidents, and mitigate the consequences of accidents if they occur, and provide a high degree of plant reliability.
Notes
Superseded
Technical characteristics
| Publisher | Institute of Electrical and Electronics Engineers (IEEE) |
| Publication Date | 08/31/1977 |
| Edition | |
| Page Count | 14 |
| EAN | --- |
| ISBN | --- |
| Weight (in grams) | --- |
| Brochures |
|
Amendments replaces
Previous versions
01/04/1985
Superseded
, Confirmed
Historical