IEEE Guide for the Rehabilitation of Hydroelectric Power Plants
Summary
Revision Standard - Superseded.
Reaffirmed March 2012. This guide is intended for the hydroelectric power industry to assist hydroelectric power plant owners, operators, and designers in the economic (feasibility) and technical evaluation (electrical aspects) of existing hydroelectric installations for rehabilitation. It addresses conventional hydropower. Portions of this guide are relevant to pumped storage but the unique features of pumped storage are not covered. Feasibility study results may indicate redevelopment of the site. Redevelopment will not be treated in detail in this guide. This guide covers all generating equipment up to and including the main transformer and typical auxiliary equipment.
This guide describes alternatives that hydroelectric power plant owners should consider when undertaking a rehabilitation of the facilities. It is useful in ensuring that potential improvements are not overlooked in the owner's process.
This guide is directed to the practicing engineer in the field of hydroelectric power for the purpose of providing guidance in the decision-making processes and design for rehabilitation of hydroelectric power plants.
Reaffirmed March 2012. This guide is intended for the hydroelectric power industry to assist hydroelectric power plant owners, operators, and designers in the economic (feasibility) and technical evaluation (electrical aspects) of existing hydroelectric installations for rehabilitation. It addresses conventional hydropower. Portions of this guide are relevant to pumped storage but the unique features of pumped storage are not covered. Feasibility study results may indicate redevelopment of the site. Redevelopment will not be treated in detail in this guide. This guide covers all generating equipment up to and including the main transformer and typical auxiliary equipment.
This guide describes alternatives that hydroelectric power plant owners should consider when undertaking a rehabilitation of the facilities. It is useful in ensuring that potential improvements are not overlooked in the owner's process.
This guide is directed to the practicing engineer in the field of hydroelectric power for the purpose of providing guidance in the decision-making processes and design for rehabilitation of hydroelectric power plants.
Notes
Superseded
Technical characteristics
| Publisher | Institute of Electrical and Electronics Engineers (IEEE) |
| Publication Date | 03/22/2006 |
| Confirmation Date | 03/29/2012 |
| Edition | |
| Page Count | 63 |
| EAN | --- |
| ISBN | --- |
| Weight (in grams) | --- |
| Brochures |
|
Amendments replaces
10/02/1992
Superseded
, Confirmed
Historical
Previous versions
26/10/2021
Active
Most Recent
22/03/2006
Superseded
, Confirmed
Historical
10/02/1992
Superseded
, Confirmed
Historical