Superseded Standard
Historical

ASME OM-2017

Operation and Maintenance of Nuclear Power Plants

Summary

Establishes the requirements for preservice and inservice testing and examination of certain components to assess their operational readiness in light-water reactor power plants. It identifies the components subject to test or examination, responsibilities, methods, intervals, parameters to be measured and evaluated, criteria for evaluating the results, corrective action, personnel qualification, and record keeping. These requirements apply to: (a) pumps and valves that are required to perform a specific function in shutting down a reactor to the safe shutdown condition, in maintaining the safe shutdown condition, or in mitigating the consequences of an accident; (b) pressure relief devices that protect systems or portions of systems that perform one or more of these three functions; and (c) dynamic restraints (snubbers) used in systems that perform one or more of these three functions.

Technical characteristics

Publisher American Society of Mechanical Engineers (ASME)
Publication Date 01/01/2017
Release Date 05/31/2017
Edition 2017
Page Count 509
Themes Nuclear
EAN ---
ISBN ---
Weight (in grams) ---
Brochures https://dev.normadoc.fr/media/cache/app_product_document_thumbnail/5a/04/1df0b96b5d40880d9e721a204a28.png https://dev.normadoc.fr/media/cache/app_product_document_thumbnail/60/74/4f82c37a90e1e478537c39111d90.png https://dev.normadoc.fr/media/cache/app_product_document_thumbnail/52/c4/989fd7dd30e78393a1f99c82dcbd.png https://dev.normadoc.fr/media/cache/app_product_document_thumbnail/e3/97/bb3202fe72ca855a3a1e8deabff9.png
No products.

Previous versions

01/01/2015
Superseded
Historical
01/01/2012
Superseded
Historical
01/01/2011
Superseded
Historical
01/01/2006
Superseded
Historical
01/01/2006
Superseded
Historical
01/01/2005
Superseded
Historical
01/01/2005
Superseded
Historical
01/01/2004
Superseded
Historical