GET https://dev.normadoc.fr/products/ieee-c37-123-1996-r2008-ieee00002658-241282

Components

3 Twig Components
13 Render Count
7 ms Render Time
454.0 MiB Memory Usage

Components

Name Metadata Render Count Render Time
ProductState
"App\Twig\Components\ProductState"
components/ProductState.html.twig
6 1.63ms
ProductMostRecent
"App\Twig\Components\ProductMostRecent"
components/ProductMostRecent.html.twig
6 4.79ms
ProductType
"App\Twig\Components\ProductType"
components/ProductType.html.twig
1 0.35ms

Render calls

ProductState App\Twig\Components\ProductState 454.0 MiB 0.52 ms
Input props
[
  "product" => App\Entity\Product\Product {#7311
    #id: 9630
    #code: "IEEE00002658"
    #attributes: Doctrine\ORM\PersistentCollection {#7701 …}
    #variants: Doctrine\ORM\PersistentCollection {#7744 …}
    #options: Doctrine\ORM\PersistentCollection {#7916 …}
    #associations: Doctrine\ORM\PersistentCollection {#7900 …}
    #createdAt: DateTime @1751038423 {#7274
      date: 2025-06-27 17:33:43.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1754607004 {#7322
      date: 2025-08-08 00:50:04.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#7922 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#7921
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#7311}
        #id: 33529
        #name: "IEEE C37.123:1996 (R2008)"
        #slug: "ieee-c37-123-1996-r2008-ieee00002658-241282"
        #description: """
          Revision Standard - Superseded.<br />\n
          Technical requirements for the design, fabrication, testing, and installation of a gas-insulated substation (GIS) are provided. Parameters to be supplied by the purchaser and the technical requirements for the design, fabrication, testing, and installation to be furnished by the manufacturer are discussed. Environmental conditions, general and specific equipment requirements, and a proposal data sheet form are provided to aid the user.<br />\n
          \t\t\t\t<br />\n
          This guide covers the technical requirements for the design, fabrication, testing, installation, and in-service performance of a gas-insulated substation (GIS).<br />\n
          The supplier should furnish all equipment and material necessary to provide the complete GIS as shown on the functional one-line diagram, which may consist of circuit breakers (CB), disconnect switches (DS), maintenance ground switches (MGS), fast-acting ground switches (FGS), voltage transformers (VT), current transformers (CT), SF6-to-air bushings, SF6-to-cable termination, buses, cable termination enclosures, transformer or reactor bushing enclosures, enclosed surge arresters, elbows, bellows, controls, cables for control, protection and metering, density monitors, platforms, special tools, and SF6 gas for initial filling. All equipment and material shall be prefabricated, factory assembled, tested, and shipped in the largest practical assemblies.<br />\n
          Assembled equipment should be capable of withstanding electrical, mechanical, and thermal ratings of the specified system. All joints and connections should be able to withstand the forces of expansion, vibration, contraction, and specified seismic requirements without deformation, malfunction, or leakage. Equipment shall be capable of withstanding the specified outdoor or indoor environment.<br />\n
          Optimized arrangements, shown in annex A, are required to reduce installation time, provide ease of operation, minimize maintenance and repair prices, and facilitate future additions as described in the specifications. The user should identify space or area limitations for the GIS, driveway access, and any overhead clearance restrictions. Final arrangement shall be as mutually agreed to between the user and the supplier.<br />\n
          Field assembly maintenance, cost of operation, and capitalized cost of maintenance during equipment life will be considered in bid evaluations. To elicit a complete and uniform response from each bidder, proposal data is provided in clause 7.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide to Specifications for Gas-Insulated, Electric Power Substation Equipment"
        -notes: "Superseded"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#7534 …}
    #channels: Doctrine\ORM\PersistentCollection {#7628 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7309 …}
    #reviews: Doctrine\ORM\PersistentCollection {#7613 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#7645 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7324 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#7321 …}
    -apiLastModifiedAt: DateTime @1754517600 {#7317
      date: 2025-08-07 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1578006000 {#7292
      date: 2020-01-03 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @849308400 {#7318
      date: 1996-11-30 00:00:00.0 Europe/Paris (+01:00)
    }
    -releasedAt: null
    -confirmedAt: DateTime @1213221600 {#7316
      date: 2008-06-12 00:00:00.0 Europe/Paris (+02:00)
    }
    -canceledAt: null
    -edition: null
    -coreDocument: "C37.123"
    -bookCollection: ""
    -pageCount: 40
    -documents: Doctrine\ORM\PersistentCollection {#7465 …}
    -favorites: Doctrine\ORM\PersistentCollection {#7500 …}
  }
  "showFullLabel" => "true"
]
Attributes
[
  "showFullLabel" => "true"
]
Component
App\Twig\Components\ProductState {#93008
  +product: App\Entity\Product\Product {#7311
    #id: 9630
    #code: "IEEE00002658"
    #attributes: Doctrine\ORM\PersistentCollection {#7701 …}
    #variants: Doctrine\ORM\PersistentCollection {#7744 …}
    #options: Doctrine\ORM\PersistentCollection {#7916 …}
    #associations: Doctrine\ORM\PersistentCollection {#7900 …}
    #createdAt: DateTime @1751038423 {#7274
      date: 2025-06-27 17:33:43.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1754607004 {#7322
      date: 2025-08-08 00:50:04.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#7922 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#7921
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#7311}
        #id: 33529
        #name: "IEEE C37.123:1996 (R2008)"
        #slug: "ieee-c37-123-1996-r2008-ieee00002658-241282"
        #description: """
          Revision Standard - Superseded.<br />\n
          Technical requirements for the design, fabrication, testing, and installation of a gas-insulated substation (GIS) are provided. Parameters to be supplied by the purchaser and the technical requirements for the design, fabrication, testing, and installation to be furnished by the manufacturer are discussed. Environmental conditions, general and specific equipment requirements, and a proposal data sheet form are provided to aid the user.<br />\n
          \t\t\t\t<br />\n
          This guide covers the technical requirements for the design, fabrication, testing, installation, and in-service performance of a gas-insulated substation (GIS).<br />\n
          The supplier should furnish all equipment and material necessary to provide the complete GIS as shown on the functional one-line diagram, which may consist of circuit breakers (CB), disconnect switches (DS), maintenance ground switches (MGS), fast-acting ground switches (FGS), voltage transformers (VT), current transformers (CT), SF6-to-air bushings, SF6-to-cable termination, buses, cable termination enclosures, transformer or reactor bushing enclosures, enclosed surge arresters, elbows, bellows, controls, cables for control, protection and metering, density monitors, platforms, special tools, and SF6 gas for initial filling. All equipment and material shall be prefabricated, factory assembled, tested, and shipped in the largest practical assemblies.<br />\n
          Assembled equipment should be capable of withstanding electrical, mechanical, and thermal ratings of the specified system. All joints and connections should be able to withstand the forces of expansion, vibration, contraction, and specified seismic requirements without deformation, malfunction, or leakage. Equipment shall be capable of withstanding the specified outdoor or indoor environment.<br />\n
          Optimized arrangements, shown in annex A, are required to reduce installation time, provide ease of operation, minimize maintenance and repair prices, and facilitate future additions as described in the specifications. The user should identify space or area limitations for the GIS, driveway access, and any overhead clearance restrictions. Final arrangement shall be as mutually agreed to between the user and the supplier.<br />\n
          Field assembly maintenance, cost of operation, and capitalized cost of maintenance during equipment life will be considered in bid evaluations. To elicit a complete and uniform response from each bidder, proposal data is provided in clause 7.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide to Specifications for Gas-Insulated, Electric Power Substation Equipment"
        -notes: "Superseded"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#7534 …}
    #channels: Doctrine\ORM\PersistentCollection {#7628 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7309 …}
    #reviews: Doctrine\ORM\PersistentCollection {#7613 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#7645 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7324 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#7321 …}
    -apiLastModifiedAt: DateTime @1754517600 {#7317
      date: 2025-08-07 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1578006000 {#7292
      date: 2020-01-03 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @849308400 {#7318
      date: 1996-11-30 00:00:00.0 Europe/Paris (+01:00)
    }
    -releasedAt: null
    -confirmedAt: DateTime @1213221600 {#7316
      date: 2008-06-12 00:00:00.0 Europe/Paris (+02:00)
    }
    -canceledAt: null
    -edition: null
    -coreDocument: "C37.123"
    -bookCollection: ""
    -pageCount: 40
    -documents: Doctrine\ORM\PersistentCollection {#7465 …}
    -favorites: Doctrine\ORM\PersistentCollection {#7500 …}
  }
  +appearance: "state-suspended"
  +labels: [
    "Superseded"
    "Confirmed"
  ]
  -stateAttributeCode: "state"
  -localeContext: Sylius\Component\Locale\Context\CompositeLocaleContext {#1833 …}
}
ProductType App\Twig\Components\ProductType 454.0 MiB 0.35 ms
Input props
[
  "product" => App\Entity\Product\Product {#7311
    #id: 9630
    #code: "IEEE00002658"
    #attributes: Doctrine\ORM\PersistentCollection {#7701 …}
    #variants: Doctrine\ORM\PersistentCollection {#7744 …}
    #options: Doctrine\ORM\PersistentCollection {#7916 …}
    #associations: Doctrine\ORM\PersistentCollection {#7900 …}
    #createdAt: DateTime @1751038423 {#7274
      date: 2025-06-27 17:33:43.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1754607004 {#7322
      date: 2025-08-08 00:50:04.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#7922 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#7921
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#7311}
        #id: 33529
        #name: "IEEE C37.123:1996 (R2008)"
        #slug: "ieee-c37-123-1996-r2008-ieee00002658-241282"
        #description: """
          Revision Standard - Superseded.<br />\n
          Technical requirements for the design, fabrication, testing, and installation of a gas-insulated substation (GIS) are provided. Parameters to be supplied by the purchaser and the technical requirements for the design, fabrication, testing, and installation to be furnished by the manufacturer are discussed. Environmental conditions, general and specific equipment requirements, and a proposal data sheet form are provided to aid the user.<br />\n
          \t\t\t\t<br />\n
          This guide covers the technical requirements for the design, fabrication, testing, installation, and in-service performance of a gas-insulated substation (GIS).<br />\n
          The supplier should furnish all equipment and material necessary to provide the complete GIS as shown on the functional one-line diagram, which may consist of circuit breakers (CB), disconnect switches (DS), maintenance ground switches (MGS), fast-acting ground switches (FGS), voltage transformers (VT), current transformers (CT), SF6-to-air bushings, SF6-to-cable termination, buses, cable termination enclosures, transformer or reactor bushing enclosures, enclosed surge arresters, elbows, bellows, controls, cables for control, protection and metering, density monitors, platforms, special tools, and SF6 gas for initial filling. All equipment and material shall be prefabricated, factory assembled, tested, and shipped in the largest practical assemblies.<br />\n
          Assembled equipment should be capable of withstanding electrical, mechanical, and thermal ratings of the specified system. All joints and connections should be able to withstand the forces of expansion, vibration, contraction, and specified seismic requirements without deformation, malfunction, or leakage. Equipment shall be capable of withstanding the specified outdoor or indoor environment.<br />\n
          Optimized arrangements, shown in annex A, are required to reduce installation time, provide ease of operation, minimize maintenance and repair prices, and facilitate future additions as described in the specifications. The user should identify space or area limitations for the GIS, driveway access, and any overhead clearance restrictions. Final arrangement shall be as mutually agreed to between the user and the supplier.<br />\n
          Field assembly maintenance, cost of operation, and capitalized cost of maintenance during equipment life will be considered in bid evaluations. To elicit a complete and uniform response from each bidder, proposal data is provided in clause 7.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide to Specifications for Gas-Insulated, Electric Power Substation Equipment"
        -notes: "Superseded"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#7534 …}
    #channels: Doctrine\ORM\PersistentCollection {#7628 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7309 …}
    #reviews: Doctrine\ORM\PersistentCollection {#7613 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#7645 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7324 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#7321 …}
    -apiLastModifiedAt: DateTime @1754517600 {#7317
      date: 2025-08-07 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1578006000 {#7292
      date: 2020-01-03 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @849308400 {#7318
      date: 1996-11-30 00:00:00.0 Europe/Paris (+01:00)
    }
    -releasedAt: null
    -confirmedAt: DateTime @1213221600 {#7316
      date: 2008-06-12 00:00:00.0 Europe/Paris (+02:00)
    }
    -canceledAt: null
    -edition: null
    -coreDocument: "C37.123"
    -bookCollection: ""
    -pageCount: 40
    -documents: Doctrine\ORM\PersistentCollection {#7465 …}
    -favorites: Doctrine\ORM\PersistentCollection {#7500 …}
  }
]
Attributes
[]
Component
App\Twig\Components\ProductType {#93201
  +product: App\Entity\Product\Product {#7311
    #id: 9630
    #code: "IEEE00002658"
    #attributes: Doctrine\ORM\PersistentCollection {#7701 …}
    #variants: Doctrine\ORM\PersistentCollection {#7744 …}
    #options: Doctrine\ORM\PersistentCollection {#7916 …}
    #associations: Doctrine\ORM\PersistentCollection {#7900 …}
    #createdAt: DateTime @1751038423 {#7274
      date: 2025-06-27 17:33:43.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1754607004 {#7322
      date: 2025-08-08 00:50:04.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#7922 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#7921
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#7311}
        #id: 33529
        #name: "IEEE C37.123:1996 (R2008)"
        #slug: "ieee-c37-123-1996-r2008-ieee00002658-241282"
        #description: """
          Revision Standard - Superseded.<br />\n
          Technical requirements for the design, fabrication, testing, and installation of a gas-insulated substation (GIS) are provided. Parameters to be supplied by the purchaser and the technical requirements for the design, fabrication, testing, and installation to be furnished by the manufacturer are discussed. Environmental conditions, general and specific equipment requirements, and a proposal data sheet form are provided to aid the user.<br />\n
          \t\t\t\t<br />\n
          This guide covers the technical requirements for the design, fabrication, testing, installation, and in-service performance of a gas-insulated substation (GIS).<br />\n
          The supplier should furnish all equipment and material necessary to provide the complete GIS as shown on the functional one-line diagram, which may consist of circuit breakers (CB), disconnect switches (DS), maintenance ground switches (MGS), fast-acting ground switches (FGS), voltage transformers (VT), current transformers (CT), SF6-to-air bushings, SF6-to-cable termination, buses, cable termination enclosures, transformer or reactor bushing enclosures, enclosed surge arresters, elbows, bellows, controls, cables for control, protection and metering, density monitors, platforms, special tools, and SF6 gas for initial filling. All equipment and material shall be prefabricated, factory assembled, tested, and shipped in the largest practical assemblies.<br />\n
          Assembled equipment should be capable of withstanding electrical, mechanical, and thermal ratings of the specified system. All joints and connections should be able to withstand the forces of expansion, vibration, contraction, and specified seismic requirements without deformation, malfunction, or leakage. Equipment shall be capable of withstanding the specified outdoor or indoor environment.<br />\n
          Optimized arrangements, shown in annex A, are required to reduce installation time, provide ease of operation, minimize maintenance and repair prices, and facilitate future additions as described in the specifications. The user should identify space or area limitations for the GIS, driveway access, and any overhead clearance restrictions. Final arrangement shall be as mutually agreed to between the user and the supplier.<br />\n
          Field assembly maintenance, cost of operation, and capitalized cost of maintenance during equipment life will be considered in bid evaluations. To elicit a complete and uniform response from each bidder, proposal data is provided in clause 7.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide to Specifications for Gas-Insulated, Electric Power Substation Equipment"
        -notes: "Superseded"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#7534 …}
    #channels: Doctrine\ORM\PersistentCollection {#7628 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7309 …}
    #reviews: Doctrine\ORM\PersistentCollection {#7613 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#7645 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7324 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#7321 …}
    -apiLastModifiedAt: DateTime @1754517600 {#7317
      date: 2025-08-07 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1578006000 {#7292
      date: 2020-01-03 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @849308400 {#7318
      date: 1996-11-30 00:00:00.0 Europe/Paris (+01:00)
    }
    -releasedAt: null
    -confirmedAt: DateTime @1213221600 {#7316
      date: 2008-06-12 00:00:00.0 Europe/Paris (+02:00)
    }
    -canceledAt: null
    -edition: null
    -coreDocument: "C37.123"
    -bookCollection: ""
    -pageCount: 40
    -documents: Doctrine\ORM\PersistentCollection {#7465 …}
    -favorites: Doctrine\ORM\PersistentCollection {#7500 …}
  }
  +label: "Standard"
  -typeAttributeCode: "type"
  -localeContext: Sylius\Component\Locale\Context\CompositeLocaleContext {#1833 …}
}
ProductMostRecent App\Twig\Components\ProductMostRecent 454.0 MiB 1.00 ms
Input props
[
  "product" => App\Entity\Product\Product {#7311
    #id: 9630
    #code: "IEEE00002658"
    #attributes: Doctrine\ORM\PersistentCollection {#7701 …}
    #variants: Doctrine\ORM\PersistentCollection {#7744 …}
    #options: Doctrine\ORM\PersistentCollection {#7916 …}
    #associations: Doctrine\ORM\PersistentCollection {#7900 …}
    #createdAt: DateTime @1751038423 {#7274
      date: 2025-06-27 17:33:43.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1754607004 {#7322
      date: 2025-08-08 00:50:04.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#7922 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#7921
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#7311}
        #id: 33529
        #name: "IEEE C37.123:1996 (R2008)"
        #slug: "ieee-c37-123-1996-r2008-ieee00002658-241282"
        #description: """
          Revision Standard - Superseded.<br />\n
          Technical requirements for the design, fabrication, testing, and installation of a gas-insulated substation (GIS) are provided. Parameters to be supplied by the purchaser and the technical requirements for the design, fabrication, testing, and installation to be furnished by the manufacturer are discussed. Environmental conditions, general and specific equipment requirements, and a proposal data sheet form are provided to aid the user.<br />\n
          \t\t\t\t<br />\n
          This guide covers the technical requirements for the design, fabrication, testing, installation, and in-service performance of a gas-insulated substation (GIS).<br />\n
          The supplier should furnish all equipment and material necessary to provide the complete GIS as shown on the functional one-line diagram, which may consist of circuit breakers (CB), disconnect switches (DS), maintenance ground switches (MGS), fast-acting ground switches (FGS), voltage transformers (VT), current transformers (CT), SF6-to-air bushings, SF6-to-cable termination, buses, cable termination enclosures, transformer or reactor bushing enclosures, enclosed surge arresters, elbows, bellows, controls, cables for control, protection and metering, density monitors, platforms, special tools, and SF6 gas for initial filling. All equipment and material shall be prefabricated, factory assembled, tested, and shipped in the largest practical assemblies.<br />\n
          Assembled equipment should be capable of withstanding electrical, mechanical, and thermal ratings of the specified system. All joints and connections should be able to withstand the forces of expansion, vibration, contraction, and specified seismic requirements without deformation, malfunction, or leakage. Equipment shall be capable of withstanding the specified outdoor or indoor environment.<br />\n
          Optimized arrangements, shown in annex A, are required to reduce installation time, provide ease of operation, minimize maintenance and repair prices, and facilitate future additions as described in the specifications. The user should identify space or area limitations for the GIS, driveway access, and any overhead clearance restrictions. Final arrangement shall be as mutually agreed to between the user and the supplier.<br />\n
          Field assembly maintenance, cost of operation, and capitalized cost of maintenance during equipment life will be considered in bid evaluations. To elicit a complete and uniform response from each bidder, proposal data is provided in clause 7.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide to Specifications for Gas-Insulated, Electric Power Substation Equipment"
        -notes: "Superseded"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#7534 …}
    #channels: Doctrine\ORM\PersistentCollection {#7628 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7309 …}
    #reviews: Doctrine\ORM\PersistentCollection {#7613 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#7645 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7324 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#7321 …}
    -apiLastModifiedAt: DateTime @1754517600 {#7317
      date: 2025-08-07 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1578006000 {#7292
      date: 2020-01-03 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @849308400 {#7318
      date: 1996-11-30 00:00:00.0 Europe/Paris (+01:00)
    }
    -releasedAt: null
    -confirmedAt: DateTime @1213221600 {#7316
      date: 2008-06-12 00:00:00.0 Europe/Paris (+02:00)
    }
    -canceledAt: null
    -edition: null
    -coreDocument: "C37.123"
    -bookCollection: ""
    -pageCount: 40
    -documents: Doctrine\ORM\PersistentCollection {#7465 …}
    -favorites: Doctrine\ORM\PersistentCollection {#7500 …}
  }
]
Attributes
[]
Component
App\Twig\Components\ProductMostRecent {#93276
  +product: App\Entity\Product\Product {#7311
    #id: 9630
    #code: "IEEE00002658"
    #attributes: Doctrine\ORM\PersistentCollection {#7701 …}
    #variants: Doctrine\ORM\PersistentCollection {#7744 …}
    #options: Doctrine\ORM\PersistentCollection {#7916 …}
    #associations: Doctrine\ORM\PersistentCollection {#7900 …}
    #createdAt: DateTime @1751038423 {#7274
      date: 2025-06-27 17:33:43.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1754607004 {#7322
      date: 2025-08-08 00:50:04.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#7922 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#7921
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#7311}
        #id: 33529
        #name: "IEEE C37.123:1996 (R2008)"
        #slug: "ieee-c37-123-1996-r2008-ieee00002658-241282"
        #description: """
          Revision Standard - Superseded.<br />\n
          Technical requirements for the design, fabrication, testing, and installation of a gas-insulated substation (GIS) are provided. Parameters to be supplied by the purchaser and the technical requirements for the design, fabrication, testing, and installation to be furnished by the manufacturer are discussed. Environmental conditions, general and specific equipment requirements, and a proposal data sheet form are provided to aid the user.<br />\n
          \t\t\t\t<br />\n
          This guide covers the technical requirements for the design, fabrication, testing, installation, and in-service performance of a gas-insulated substation (GIS).<br />\n
          The supplier should furnish all equipment and material necessary to provide the complete GIS as shown on the functional one-line diagram, which may consist of circuit breakers (CB), disconnect switches (DS), maintenance ground switches (MGS), fast-acting ground switches (FGS), voltage transformers (VT), current transformers (CT), SF6-to-air bushings, SF6-to-cable termination, buses, cable termination enclosures, transformer or reactor bushing enclosures, enclosed surge arresters, elbows, bellows, controls, cables for control, protection and metering, density monitors, platforms, special tools, and SF6 gas for initial filling. All equipment and material shall be prefabricated, factory assembled, tested, and shipped in the largest practical assemblies.<br />\n
          Assembled equipment should be capable of withstanding electrical, mechanical, and thermal ratings of the specified system. All joints and connections should be able to withstand the forces of expansion, vibration, contraction, and specified seismic requirements without deformation, malfunction, or leakage. Equipment shall be capable of withstanding the specified outdoor or indoor environment.<br />\n
          Optimized arrangements, shown in annex A, are required to reduce installation time, provide ease of operation, minimize maintenance and repair prices, and facilitate future additions as described in the specifications. The user should identify space or area limitations for the GIS, driveway access, and any overhead clearance restrictions. Final arrangement shall be as mutually agreed to between the user and the supplier.<br />\n
          Field assembly maintenance, cost of operation, and capitalized cost of maintenance during equipment life will be considered in bid evaluations. To elicit a complete and uniform response from each bidder, proposal data is provided in clause 7.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide to Specifications for Gas-Insulated, Electric Power Substation Equipment"
        -notes: "Superseded"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#7534 …}
    #channels: Doctrine\ORM\PersistentCollection {#7628 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7309 …}
    #reviews: Doctrine\ORM\PersistentCollection {#7613 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#7645 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7324 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#7321 …}
    -apiLastModifiedAt: DateTime @1754517600 {#7317
      date: 2025-08-07 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1578006000 {#7292
      date: 2020-01-03 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @849308400 {#7318
      date: 1996-11-30 00:00:00.0 Europe/Paris (+01:00)
    }
    -releasedAt: null
    -confirmedAt: DateTime @1213221600 {#7316
      date: 2008-06-12 00:00:00.0 Europe/Paris (+02:00)
    }
    -canceledAt: null
    -edition: null
    -coreDocument: "C37.123"
    -bookCollection: ""
    -pageCount: 40
    -documents: Doctrine\ORM\PersistentCollection {#7465 …}
    -favorites: Doctrine\ORM\PersistentCollection {#7500 …}
  }
  +label: "Historical"
  +icon: "historical"
  -mostRecentAttributeCode: "most_recent"
  -localeContext: Sylius\Component\Locale\Context\CompositeLocaleContext {#1833 …}
}
ProductState App\Twig\Components\ProductState 454.0 MiB 0.29 ms
Input props
[
  "product" => App\Entity\Product\Product {#106688
    #id: 9629
    #code: "IEEE00002657"
    #attributes: Doctrine\ORM\PersistentCollection {#106671 …}
    #variants: Doctrine\ORM\PersistentCollection {#106668 …}
    #options: Doctrine\ORM\PersistentCollection {#106664 …}
    #associations: Doctrine\ORM\PersistentCollection {#106666 …}
    #createdAt: DateTime @1751038422 {#106696
      date: 2025-06-27 17:33:42.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1753969444 {#106669
      date: 2025-07-31 15:44:04.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#106682 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#106721
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#106688}
        #id: 33525
        #name: "IEEE C37.123:1991"
        #slug: "ieee-c37-123-1991-ieee00002657-241281"
        #description: """
          New IEEE Standard - Superseded.<br />\n
          IEEE C37.123-1991 covers the technical requirements for the design, fabrication, testing, and installation of a gas-insulated substation (GIS). The guide looks at parameters to be supplied by the purchaser and technical requirements for the design, fabrication, testing, and installation to be furnished by the manufacturer. Environmental conditions, general and specific equipment requirements, and a proposal data sheet form are included to aid the user.<br />\n
          \t\t\t\t<br />\n
          1.1.1 This guide covers the technical requirements for the design, fabrication, testing, and installation of a gas-insulated substation (GIs).<br />\n
          1.1.2 The manufacturer shall furnish all work necessary to provide the complete GIS as shown on the functional one-line diagram, which may consist of circuit breakers (CBI, disconnect switches (DS), maintenance ground switches (MGS), fast-acting ground switches (FGS), voltage transformers (VT), current transformers (CT), SF6-to-air bushings, buses, cable potherad enclosures, transformer or reactor bushing enclosures, enclosed surge arresters, elbows, bellows, controls, and supporting structures in applicable numbers. All equipment and material shall be prefabricated, factory assembled, tested, and shipped in the largest practical assemblies.<br />\n
          1.1.3 The assembled equipment shall be capable of withstanding electrical, mechanical, and thermal ratings of the specified system. All joints and connections shall be able to withstand the forces of expansion, vibration, contraction, and specified seismic requirements without deformation, malfunction, and leakage.<br />\n
          1.1.4 The equipment shall be capable of withstanding the specified outdoor or indoor environment.<br />\n
          1.1.5 Optimized arrangements are required to reduce installation time, provide ease of operations,<br />\n
          minimize maintenance and repair costs, and facilitate future additions as described in the specifications. The proposal shall include recommended spare parts for reduced outage time in case of a fault, and delivery time in case of emergency.<br />\n
          1.1.6 Field assembly costs and maintenance costs will be considered in bid evaluations.<br />\n
          1.1.7 In order to elicit a complete and uniform response from each bidder, Section 4, Proposal Data, is provided.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide to Specifications for Gas-Insulated Substation Equipment"
        -notes: "Superseded"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#106679 …}
    #channels: Doctrine\ORM\PersistentCollection {#106673 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7309 …}
    #reviews: Doctrine\ORM\PersistentCollection {#106677 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#106675 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7324 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#106689 …}
    -apiLastModifiedAt: DateTime @1745013600 {#106656
      date: 2025-04-19 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1578006000 {#106695
      date: 2020-01-03 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @682898400 {#106694
      date: 1991-08-23 00:00:00.0 Europe/Paris (+02:00)
    }
    -releasedAt: null
    -confirmedAt: null
    -canceledAt: null
    -edition: null
    -coreDocument: "C37.123"
    -bookCollection: ""
    -pageCount: 22
    -documents: Doctrine\ORM\PersistentCollection {#106686 …}
    -favorites: Doctrine\ORM\PersistentCollection {#106684 …}
  }
  "showFullLabel" => "true"
]
Attributes
[
  "showFullLabel" => "true"
]
Component
App\Twig\Components\ProductState {#106704
  +product: App\Entity\Product\Product {#106688
    #id: 9629
    #code: "IEEE00002657"
    #attributes: Doctrine\ORM\PersistentCollection {#106671 …}
    #variants: Doctrine\ORM\PersistentCollection {#106668 …}
    #options: Doctrine\ORM\PersistentCollection {#106664 …}
    #associations: Doctrine\ORM\PersistentCollection {#106666 …}
    #createdAt: DateTime @1751038422 {#106696
      date: 2025-06-27 17:33:42.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1753969444 {#106669
      date: 2025-07-31 15:44:04.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#106682 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#106721
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#106688}
        #id: 33525
        #name: "IEEE C37.123:1991"
        #slug: "ieee-c37-123-1991-ieee00002657-241281"
        #description: """
          New IEEE Standard - Superseded.<br />\n
          IEEE C37.123-1991 covers the technical requirements for the design, fabrication, testing, and installation of a gas-insulated substation (GIS). The guide looks at parameters to be supplied by the purchaser and technical requirements for the design, fabrication, testing, and installation to be furnished by the manufacturer. Environmental conditions, general and specific equipment requirements, and a proposal data sheet form are included to aid the user.<br />\n
          \t\t\t\t<br />\n
          1.1.1 This guide covers the technical requirements for the design, fabrication, testing, and installation of a gas-insulated substation (GIs).<br />\n
          1.1.2 The manufacturer shall furnish all work necessary to provide the complete GIS as shown on the functional one-line diagram, which may consist of circuit breakers (CBI, disconnect switches (DS), maintenance ground switches (MGS), fast-acting ground switches (FGS), voltage transformers (VT), current transformers (CT), SF6-to-air bushings, buses, cable potherad enclosures, transformer or reactor bushing enclosures, enclosed surge arresters, elbows, bellows, controls, and supporting structures in applicable numbers. All equipment and material shall be prefabricated, factory assembled, tested, and shipped in the largest practical assemblies.<br />\n
          1.1.3 The assembled equipment shall be capable of withstanding electrical, mechanical, and thermal ratings of the specified system. All joints and connections shall be able to withstand the forces of expansion, vibration, contraction, and specified seismic requirements without deformation, malfunction, and leakage.<br />\n
          1.1.4 The equipment shall be capable of withstanding the specified outdoor or indoor environment.<br />\n
          1.1.5 Optimized arrangements are required to reduce installation time, provide ease of operations,<br />\n
          minimize maintenance and repair costs, and facilitate future additions as described in the specifications. The proposal shall include recommended spare parts for reduced outage time in case of a fault, and delivery time in case of emergency.<br />\n
          1.1.6 Field assembly costs and maintenance costs will be considered in bid evaluations.<br />\n
          1.1.7 In order to elicit a complete and uniform response from each bidder, Section 4, Proposal Data, is provided.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide to Specifications for Gas-Insulated Substation Equipment"
        -notes: "Superseded"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#106679 …}
    #channels: Doctrine\ORM\PersistentCollection {#106673 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7309 …}
    #reviews: Doctrine\ORM\PersistentCollection {#106677 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#106675 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7324 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#106689 …}
    -apiLastModifiedAt: DateTime @1745013600 {#106656
      date: 2025-04-19 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1578006000 {#106695
      date: 2020-01-03 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @682898400 {#106694
      date: 1991-08-23 00:00:00.0 Europe/Paris (+02:00)
    }
    -releasedAt: null
    -confirmedAt: null
    -canceledAt: null
    -edition: null
    -coreDocument: "C37.123"
    -bookCollection: ""
    -pageCount: 22
    -documents: Doctrine\ORM\PersistentCollection {#106686 …}
    -favorites: Doctrine\ORM\PersistentCollection {#106684 …}
  }
  +appearance: "state-suspended"
  +labels: [
    "Superseded"
  ]
  -stateAttributeCode: "state"
  -localeContext: Sylius\Component\Locale\Context\CompositeLocaleContext {#1833 …}
}
ProductMostRecent App\Twig\Components\ProductMostRecent 454.0 MiB 1.01 ms
Input props
[
  "product" => App\Entity\Product\Product {#106688
    #id: 9629
    #code: "IEEE00002657"
    #attributes: Doctrine\ORM\PersistentCollection {#106671 …}
    #variants: Doctrine\ORM\PersistentCollection {#106668 …}
    #options: Doctrine\ORM\PersistentCollection {#106664 …}
    #associations: Doctrine\ORM\PersistentCollection {#106666 …}
    #createdAt: DateTime @1751038422 {#106696
      date: 2025-06-27 17:33:42.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1753969444 {#106669
      date: 2025-07-31 15:44:04.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#106682 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#106721
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#106688}
        #id: 33525
        #name: "IEEE C37.123:1991"
        #slug: "ieee-c37-123-1991-ieee00002657-241281"
        #description: """
          New IEEE Standard - Superseded.<br />\n
          IEEE C37.123-1991 covers the technical requirements for the design, fabrication, testing, and installation of a gas-insulated substation (GIS). The guide looks at parameters to be supplied by the purchaser and technical requirements for the design, fabrication, testing, and installation to be furnished by the manufacturer. Environmental conditions, general and specific equipment requirements, and a proposal data sheet form are included to aid the user.<br />\n
          \t\t\t\t<br />\n
          1.1.1 This guide covers the technical requirements for the design, fabrication, testing, and installation of a gas-insulated substation (GIs).<br />\n
          1.1.2 The manufacturer shall furnish all work necessary to provide the complete GIS as shown on the functional one-line diagram, which may consist of circuit breakers (CBI, disconnect switches (DS), maintenance ground switches (MGS), fast-acting ground switches (FGS), voltage transformers (VT), current transformers (CT), SF6-to-air bushings, buses, cable potherad enclosures, transformer or reactor bushing enclosures, enclosed surge arresters, elbows, bellows, controls, and supporting structures in applicable numbers. All equipment and material shall be prefabricated, factory assembled, tested, and shipped in the largest practical assemblies.<br />\n
          1.1.3 The assembled equipment shall be capable of withstanding electrical, mechanical, and thermal ratings of the specified system. All joints and connections shall be able to withstand the forces of expansion, vibration, contraction, and specified seismic requirements without deformation, malfunction, and leakage.<br />\n
          1.1.4 The equipment shall be capable of withstanding the specified outdoor or indoor environment.<br />\n
          1.1.5 Optimized arrangements are required to reduce installation time, provide ease of operations,<br />\n
          minimize maintenance and repair costs, and facilitate future additions as described in the specifications. The proposal shall include recommended spare parts for reduced outage time in case of a fault, and delivery time in case of emergency.<br />\n
          1.1.6 Field assembly costs and maintenance costs will be considered in bid evaluations.<br />\n
          1.1.7 In order to elicit a complete and uniform response from each bidder, Section 4, Proposal Data, is provided.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide to Specifications for Gas-Insulated Substation Equipment"
        -notes: "Superseded"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#106679 …}
    #channels: Doctrine\ORM\PersistentCollection {#106673 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7309 …}
    #reviews: Doctrine\ORM\PersistentCollection {#106677 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#106675 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7324 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#106689 …}
    -apiLastModifiedAt: DateTime @1745013600 {#106656
      date: 2025-04-19 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1578006000 {#106695
      date: 2020-01-03 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @682898400 {#106694
      date: 1991-08-23 00:00:00.0 Europe/Paris (+02:00)
    }
    -releasedAt: null
    -confirmedAt: null
    -canceledAt: null
    -edition: null
    -coreDocument: "C37.123"
    -bookCollection: ""
    -pageCount: 22
    -documents: Doctrine\ORM\PersistentCollection {#106686 …}
    -favorites: Doctrine\ORM\PersistentCollection {#106684 …}
  }
]
Attributes
[]
Component
App\Twig\Components\ProductMostRecent {#106803
  +product: App\Entity\Product\Product {#106688
    #id: 9629
    #code: "IEEE00002657"
    #attributes: Doctrine\ORM\PersistentCollection {#106671 …}
    #variants: Doctrine\ORM\PersistentCollection {#106668 …}
    #options: Doctrine\ORM\PersistentCollection {#106664 …}
    #associations: Doctrine\ORM\PersistentCollection {#106666 …}
    #createdAt: DateTime @1751038422 {#106696
      date: 2025-06-27 17:33:42.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1753969444 {#106669
      date: 2025-07-31 15:44:04.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#106682 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#106721
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#106688}
        #id: 33525
        #name: "IEEE C37.123:1991"
        #slug: "ieee-c37-123-1991-ieee00002657-241281"
        #description: """
          New IEEE Standard - Superseded.<br />\n
          IEEE C37.123-1991 covers the technical requirements for the design, fabrication, testing, and installation of a gas-insulated substation (GIS). The guide looks at parameters to be supplied by the purchaser and technical requirements for the design, fabrication, testing, and installation to be furnished by the manufacturer. Environmental conditions, general and specific equipment requirements, and a proposal data sheet form are included to aid the user.<br />\n
          \t\t\t\t<br />\n
          1.1.1 This guide covers the technical requirements for the design, fabrication, testing, and installation of a gas-insulated substation (GIs).<br />\n
          1.1.2 The manufacturer shall furnish all work necessary to provide the complete GIS as shown on the functional one-line diagram, which may consist of circuit breakers (CBI, disconnect switches (DS), maintenance ground switches (MGS), fast-acting ground switches (FGS), voltage transformers (VT), current transformers (CT), SF6-to-air bushings, buses, cable potherad enclosures, transformer or reactor bushing enclosures, enclosed surge arresters, elbows, bellows, controls, and supporting structures in applicable numbers. All equipment and material shall be prefabricated, factory assembled, tested, and shipped in the largest practical assemblies.<br />\n
          1.1.3 The assembled equipment shall be capable of withstanding electrical, mechanical, and thermal ratings of the specified system. All joints and connections shall be able to withstand the forces of expansion, vibration, contraction, and specified seismic requirements without deformation, malfunction, and leakage.<br />\n
          1.1.4 The equipment shall be capable of withstanding the specified outdoor or indoor environment.<br />\n
          1.1.5 Optimized arrangements are required to reduce installation time, provide ease of operations,<br />\n
          minimize maintenance and repair costs, and facilitate future additions as described in the specifications. The proposal shall include recommended spare parts for reduced outage time in case of a fault, and delivery time in case of emergency.<br />\n
          1.1.6 Field assembly costs and maintenance costs will be considered in bid evaluations.<br />\n
          1.1.7 In order to elicit a complete and uniform response from each bidder, Section 4, Proposal Data, is provided.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide to Specifications for Gas-Insulated Substation Equipment"
        -notes: "Superseded"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#106679 …}
    #channels: Doctrine\ORM\PersistentCollection {#106673 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7309 …}
    #reviews: Doctrine\ORM\PersistentCollection {#106677 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#106675 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7324 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#106689 …}
    -apiLastModifiedAt: DateTime @1745013600 {#106656
      date: 2025-04-19 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1578006000 {#106695
      date: 2020-01-03 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @682898400 {#106694
      date: 1991-08-23 00:00:00.0 Europe/Paris (+02:00)
    }
    -releasedAt: null
    -confirmedAt: null
    -canceledAt: null
    -edition: null
    -coreDocument: "C37.123"
    -bookCollection: ""
    -pageCount: 22
    -documents: Doctrine\ORM\PersistentCollection {#106686 …}
    -favorites: Doctrine\ORM\PersistentCollection {#106684 …}
  }
  +label: "Historical"
  +icon: "historical"
  -mostRecentAttributeCode: "most_recent"
  -localeContext: Sylius\Component\Locale\Context\CompositeLocaleContext {#1833 …}
}
ProductState App\Twig\Components\ProductState 454.0 MiB 0.23 ms
Input props
[
  "product" => App\Entity\Product\Product {#93699
    #id: 12449
    #code: "IEEE00007711"
    #attributes: Doctrine\ORM\PersistentCollection {#93679 …}
    #variants: Doctrine\ORM\PersistentCollection {#93676 …}
    #options: Doctrine\ORM\PersistentCollection {#93672 …}
    #associations: Doctrine\ORM\PersistentCollection {#93668 …}
    #createdAt: DateTime @1751040439 {#93706
      date: 2025-06-27 18:07:19.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1753970953 {#93685
      date: 2025-07-31 16:09:13.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#93690 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#93731
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#93699}
        #id: 44805
        #name: "IEEE C37.123:2023"
        #slug: "ieee-c37-123-2023-ieee00007711-244103"
        #description: """
          Revision Standard - Active.<br />\n
          The development of specifications for the technical requirements for the design, fabrication, testing, installation, and in-service performance of a high-voltage gas-insulated substation (GIS) are covered in this guide.<br />\n
          \t\t\t\t<br />\n
          This guide is for the development of specifications for the technical requirements for the design, fabrication, testing, installation, and in-service performance of a high-voltage gas-insulated substation (GIS).<br />\n
          This document is issued as a guide for use in compiling procurement specifications for the design, fabrication, testing, installation, and in-service performance of high-voltage GIS equipment. This guide applies specifically to all types of high-voltage GIS equipment rated above 52 kV ac. The imperative mode of the language is illustrative of that used in design and procurement specifications. It does not imply that this document is anything other than advisory in its scope. Specifically, this revision will align the text with IEEE Std C37.122™ and IEEE Std C37.122.1™.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for Specifications for High-Voltage Gas-Insulated Substations Rated 52 kV and Above"
        -notes: "Active"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#93688 …}
    #channels: Doctrine\ORM\PersistentCollection {#93681 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7309 …}
    #reviews: Doctrine\ORM\PersistentCollection {#93686 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#93683 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7324 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#93696 …}
    -apiLastModifiedAt: DateTime @1745013600 {#93669
      date: 2025-04-19 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1744322400 {#93705
      date: 2025-04-11 00:00:00.0 Europe/Paris (+02:00)
    }
    -author: ""
    -publishedAt: DateTime @1713477600 {#93704
      date: 2024-04-19 00:00:00.0 Europe/Paris (+02:00)
    }
    -releasedAt: null
    -confirmedAt: null
    -canceledAt: DateTime @1713477600 {#93698
      date: 2024-04-19 00:00:00.0 Europe/Paris (+02:00)
    }
    -edition: null
    -coreDocument: "C37.123"
    -bookCollection: ""
    -pageCount: 64
    -documents: Doctrine\ORM\PersistentCollection {#93694 …}
    -favorites: Doctrine\ORM\PersistentCollection {#93692 …}
  }
  "showFullLabel" => "true"
]
Attributes
[
  "showFullLabel" => "true"
]
Component
App\Twig\Components\ProductState {#113448
  +product: App\Entity\Product\Product {#93699
    #id: 12449
    #code: "IEEE00007711"
    #attributes: Doctrine\ORM\PersistentCollection {#93679 …}
    #variants: Doctrine\ORM\PersistentCollection {#93676 …}
    #options: Doctrine\ORM\PersistentCollection {#93672 …}
    #associations: Doctrine\ORM\PersistentCollection {#93668 …}
    #createdAt: DateTime @1751040439 {#93706
      date: 2025-06-27 18:07:19.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1753970953 {#93685
      date: 2025-07-31 16:09:13.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#93690 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#93731
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#93699}
        #id: 44805
        #name: "IEEE C37.123:2023"
        #slug: "ieee-c37-123-2023-ieee00007711-244103"
        #description: """
          Revision Standard - Active.<br />\n
          The development of specifications for the technical requirements for the design, fabrication, testing, installation, and in-service performance of a high-voltage gas-insulated substation (GIS) are covered in this guide.<br />\n
          \t\t\t\t<br />\n
          This guide is for the development of specifications for the technical requirements for the design, fabrication, testing, installation, and in-service performance of a high-voltage gas-insulated substation (GIS).<br />\n
          This document is issued as a guide for use in compiling procurement specifications for the design, fabrication, testing, installation, and in-service performance of high-voltage GIS equipment. This guide applies specifically to all types of high-voltage GIS equipment rated above 52 kV ac. The imperative mode of the language is illustrative of that used in design and procurement specifications. It does not imply that this document is anything other than advisory in its scope. Specifically, this revision will align the text with IEEE Std C37.122™ and IEEE Std C37.122.1™.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for Specifications for High-Voltage Gas-Insulated Substations Rated 52 kV and Above"
        -notes: "Active"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#93688 …}
    #channels: Doctrine\ORM\PersistentCollection {#93681 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7309 …}
    #reviews: Doctrine\ORM\PersistentCollection {#93686 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#93683 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7324 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#93696 …}
    -apiLastModifiedAt: DateTime @1745013600 {#93669
      date: 2025-04-19 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1744322400 {#93705
      date: 2025-04-11 00:00:00.0 Europe/Paris (+02:00)
    }
    -author: ""
    -publishedAt: DateTime @1713477600 {#93704
      date: 2024-04-19 00:00:00.0 Europe/Paris (+02:00)
    }
    -releasedAt: null
    -confirmedAt: null
    -canceledAt: DateTime @1713477600 {#93698
      date: 2024-04-19 00:00:00.0 Europe/Paris (+02:00)
    }
    -edition: null
    -coreDocument: "C37.123"
    -bookCollection: ""
    -pageCount: 64
    -documents: Doctrine\ORM\PersistentCollection {#93694 …}
    -favorites: Doctrine\ORM\PersistentCollection {#93692 …}
  }
  +appearance: "state-active"
  +labels: [
    "Active"
  ]
  -stateAttributeCode: "state"
  -localeContext: Sylius\Component\Locale\Context\CompositeLocaleContext {#1833 …}
}
ProductMostRecent App\Twig\Components\ProductMostRecent 454.0 MiB 0.77 ms
Input props
[
  "product" => App\Entity\Product\Product {#93699
    #id: 12449
    #code: "IEEE00007711"
    #attributes: Doctrine\ORM\PersistentCollection {#93679 …}
    #variants: Doctrine\ORM\PersistentCollection {#93676 …}
    #options: Doctrine\ORM\PersistentCollection {#93672 …}
    #associations: Doctrine\ORM\PersistentCollection {#93668 …}
    #createdAt: DateTime @1751040439 {#93706
      date: 2025-06-27 18:07:19.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1753970953 {#93685
      date: 2025-07-31 16:09:13.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#93690 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#93731
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#93699}
        #id: 44805
        #name: "IEEE C37.123:2023"
        #slug: "ieee-c37-123-2023-ieee00007711-244103"
        #description: """
          Revision Standard - Active.<br />\n
          The development of specifications for the technical requirements for the design, fabrication, testing, installation, and in-service performance of a high-voltage gas-insulated substation (GIS) are covered in this guide.<br />\n
          \t\t\t\t<br />\n
          This guide is for the development of specifications for the technical requirements for the design, fabrication, testing, installation, and in-service performance of a high-voltage gas-insulated substation (GIS).<br />\n
          This document is issued as a guide for use in compiling procurement specifications for the design, fabrication, testing, installation, and in-service performance of high-voltage GIS equipment. This guide applies specifically to all types of high-voltage GIS equipment rated above 52 kV ac. The imperative mode of the language is illustrative of that used in design and procurement specifications. It does not imply that this document is anything other than advisory in its scope. Specifically, this revision will align the text with IEEE Std C37.122™ and IEEE Std C37.122.1™.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for Specifications for High-Voltage Gas-Insulated Substations Rated 52 kV and Above"
        -notes: "Active"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#93688 …}
    #channels: Doctrine\ORM\PersistentCollection {#93681 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7309 …}
    #reviews: Doctrine\ORM\PersistentCollection {#93686 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#93683 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7324 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#93696 …}
    -apiLastModifiedAt: DateTime @1745013600 {#93669
      date: 2025-04-19 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1744322400 {#93705
      date: 2025-04-11 00:00:00.0 Europe/Paris (+02:00)
    }
    -author: ""
    -publishedAt: DateTime @1713477600 {#93704
      date: 2024-04-19 00:00:00.0 Europe/Paris (+02:00)
    }
    -releasedAt: null
    -confirmedAt: null
    -canceledAt: DateTime @1713477600 {#93698
      date: 2024-04-19 00:00:00.0 Europe/Paris (+02:00)
    }
    -edition: null
    -coreDocument: "C37.123"
    -bookCollection: ""
    -pageCount: 64
    -documents: Doctrine\ORM\PersistentCollection {#93694 …}
    -favorites: Doctrine\ORM\PersistentCollection {#93692 …}
  }
]
Attributes
[]
Component
App\Twig\Components\ProductMostRecent {#113515
  +product: App\Entity\Product\Product {#93699
    #id: 12449
    #code: "IEEE00007711"
    #attributes: Doctrine\ORM\PersistentCollection {#93679 …}
    #variants: Doctrine\ORM\PersistentCollection {#93676 …}
    #options: Doctrine\ORM\PersistentCollection {#93672 …}
    #associations: Doctrine\ORM\PersistentCollection {#93668 …}
    #createdAt: DateTime @1751040439 {#93706
      date: 2025-06-27 18:07:19.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1753970953 {#93685
      date: 2025-07-31 16:09:13.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#93690 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#93731
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#93699}
        #id: 44805
        #name: "IEEE C37.123:2023"
        #slug: "ieee-c37-123-2023-ieee00007711-244103"
        #description: """
          Revision Standard - Active.<br />\n
          The development of specifications for the technical requirements for the design, fabrication, testing, installation, and in-service performance of a high-voltage gas-insulated substation (GIS) are covered in this guide.<br />\n
          \t\t\t\t<br />\n
          This guide is for the development of specifications for the technical requirements for the design, fabrication, testing, installation, and in-service performance of a high-voltage gas-insulated substation (GIS).<br />\n
          This document is issued as a guide for use in compiling procurement specifications for the design, fabrication, testing, installation, and in-service performance of high-voltage GIS equipment. This guide applies specifically to all types of high-voltage GIS equipment rated above 52 kV ac. The imperative mode of the language is illustrative of that used in design and procurement specifications. It does not imply that this document is anything other than advisory in its scope. Specifically, this revision will align the text with IEEE Std C37.122™ and IEEE Std C37.122.1™.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for Specifications for High-Voltage Gas-Insulated Substations Rated 52 kV and Above"
        -notes: "Active"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#93688 …}
    #channels: Doctrine\ORM\PersistentCollection {#93681 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7309 …}
    #reviews: Doctrine\ORM\PersistentCollection {#93686 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#93683 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7324 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#93696 …}
    -apiLastModifiedAt: DateTime @1745013600 {#93669
      date: 2025-04-19 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1744322400 {#93705
      date: 2025-04-11 00:00:00.0 Europe/Paris (+02:00)
    }
    -author: ""
    -publishedAt: DateTime @1713477600 {#93704
      date: 2024-04-19 00:00:00.0 Europe/Paris (+02:00)
    }
    -releasedAt: null
    -confirmedAt: null
    -canceledAt: DateTime @1713477600 {#93698
      date: 2024-04-19 00:00:00.0 Europe/Paris (+02:00)
    }
    -edition: null
    -coreDocument: "C37.123"
    -bookCollection: ""
    -pageCount: 64
    -documents: Doctrine\ORM\PersistentCollection {#93694 …}
    -favorites: Doctrine\ORM\PersistentCollection {#93692 …}
  }
  +label: "Most Recent"
  +icon: "check-xs"
  -mostRecentAttributeCode: "most_recent"
  -localeContext: Sylius\Component\Locale\Context\CompositeLocaleContext {#1833 …}
}
ProductState App\Twig\Components\ProductState 454.0 MiB 0.22 ms
Input props
[
  "product" => App\Entity\Product\Product {#113363
    #id: 11077
    #code: "IEEE00005546"
    #attributes: Doctrine\ORM\PersistentCollection {#113397 …}
    #variants: Doctrine\ORM\PersistentCollection {#113399 …}
    #options: Doctrine\ORM\PersistentCollection {#113403 …}
    #associations: Doctrine\ORM\PersistentCollection {#113401 …}
    #createdAt: DateTime @1751039464 {#113374
      date: 2025-06-27 17:51:04.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1753969918 {#113372
      date: 2025-07-31 15:51:58.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#113387 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#113586
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#113363}
        #id: 39317
        #name: "IEEE C37.123:2016"
        #slug: "ieee-c37-123-2016-ieee00005546-242729"
        #description: """
          Revision Standard - Superseded.<br />\n
          The development of specifications for the technical requirements for the design, fabrication, testing, installation, and in-service performance of a high-voltage gas-insulated substation (GIS) are covered in this guide.<br />\n
          \t\t\t\t<br />\n
          This guide is for the development of specifications for the technical requirements for the design, fabrication, testing, installation, and in-service performance of a high-voltage gas-insulated substation (GIS).<br />\n
          This document is issued as a guide for use in compiling procurement specifications for the design, fabrication, testing, installation and in-service performance of high-voltage gas-insulated substation equipment. This guide applies specifically to all types of high-voltage gas-insulated substation equipment rated above 52 kVac. The imperative mode of the language is illustrative of that used in design and procurement specifications. It does not imply that this document is anything other than advisory in its scope. Specifically, this revision will align the text with IEEE Std C37.122(TM) and IEEE Std C37.122.1(TM). This guide is not intended to develop a complete specification for a turnkey project. General terms and conditions forming the commercial part of a specification for a particular project are outside the scope of this document.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for Specifications for High-Voltage Gas-Insulated Substations Rated 52 kV and Above"
        -notes: "Superseded"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#113389 …}
    #channels: Doctrine\ORM\PersistentCollection {#113395 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7309 …}
    #reviews: Doctrine\ORM\PersistentCollection {#113391 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#113393 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7324 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#113380 …}
    -apiLastModifiedAt: DateTime @1745013600 {#113370
      date: 2025-04-19 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1712700000 {#113373
      date: 2024-04-10 00:00:00.0 Europe/Paris (+02:00)
    }
    -author: ""
    -publishedAt: DateTime @1464127200 {#113366
      date: 2016-05-25 00:00:00.0 Europe/Paris (+02:00)
    }
    -releasedAt: null
    -confirmedAt: null
    -canceledAt: null
    -edition: null
    -coreDocument: "C37.123"
    -bookCollection: ""
    -pageCount: 60
    -documents: Doctrine\ORM\PersistentCollection {#113383 …}
    -favorites: Doctrine\ORM\PersistentCollection {#113385 …}
  }
  "showFullLabel" => "true"
]
Attributes
[
  "showFullLabel" => "true"
]
Component
App\Twig\Components\ProductState {#113601
  +product: App\Entity\Product\Product {#113363
    #id: 11077
    #code: "IEEE00005546"
    #attributes: Doctrine\ORM\PersistentCollection {#113397 …}
    #variants: Doctrine\ORM\PersistentCollection {#113399 …}
    #options: Doctrine\ORM\PersistentCollection {#113403 …}
    #associations: Doctrine\ORM\PersistentCollection {#113401 …}
    #createdAt: DateTime @1751039464 {#113374
      date: 2025-06-27 17:51:04.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1753969918 {#113372
      date: 2025-07-31 15:51:58.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#113387 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#113586
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#113363}
        #id: 39317
        #name: "IEEE C37.123:2016"
        #slug: "ieee-c37-123-2016-ieee00005546-242729"
        #description: """
          Revision Standard - Superseded.<br />\n
          The development of specifications for the technical requirements for the design, fabrication, testing, installation, and in-service performance of a high-voltage gas-insulated substation (GIS) are covered in this guide.<br />\n
          \t\t\t\t<br />\n
          This guide is for the development of specifications for the technical requirements for the design, fabrication, testing, installation, and in-service performance of a high-voltage gas-insulated substation (GIS).<br />\n
          This document is issued as a guide for use in compiling procurement specifications for the design, fabrication, testing, installation and in-service performance of high-voltage gas-insulated substation equipment. This guide applies specifically to all types of high-voltage gas-insulated substation equipment rated above 52 kVac. The imperative mode of the language is illustrative of that used in design and procurement specifications. It does not imply that this document is anything other than advisory in its scope. Specifically, this revision will align the text with IEEE Std C37.122(TM) and IEEE Std C37.122.1(TM). This guide is not intended to develop a complete specification for a turnkey project. General terms and conditions forming the commercial part of a specification for a particular project are outside the scope of this document.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for Specifications for High-Voltage Gas-Insulated Substations Rated 52 kV and Above"
        -notes: "Superseded"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#113389 …}
    #channels: Doctrine\ORM\PersistentCollection {#113395 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7309 …}
    #reviews: Doctrine\ORM\PersistentCollection {#113391 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#113393 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7324 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#113380 …}
    -apiLastModifiedAt: DateTime @1745013600 {#113370
      date: 2025-04-19 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1712700000 {#113373
      date: 2024-04-10 00:00:00.0 Europe/Paris (+02:00)
    }
    -author: ""
    -publishedAt: DateTime @1464127200 {#113366
      date: 2016-05-25 00:00:00.0 Europe/Paris (+02:00)
    }
    -releasedAt: null
    -confirmedAt: null
    -canceledAt: null
    -edition: null
    -coreDocument: "C37.123"
    -bookCollection: ""
    -pageCount: 60
    -documents: Doctrine\ORM\PersistentCollection {#113383 …}
    -favorites: Doctrine\ORM\PersistentCollection {#113385 …}
  }
  +appearance: "state-suspended"
  +labels: [
    "Superseded"
  ]
  -stateAttributeCode: "state"
  -localeContext: Sylius\Component\Locale\Context\CompositeLocaleContext {#1833 …}
}
ProductMostRecent App\Twig\Components\ProductMostRecent 454.0 MiB 0.75 ms
Input props
[
  "product" => App\Entity\Product\Product {#113363
    #id: 11077
    #code: "IEEE00005546"
    #attributes: Doctrine\ORM\PersistentCollection {#113397 …}
    #variants: Doctrine\ORM\PersistentCollection {#113399 …}
    #options: Doctrine\ORM\PersistentCollection {#113403 …}
    #associations: Doctrine\ORM\PersistentCollection {#113401 …}
    #createdAt: DateTime @1751039464 {#113374
      date: 2025-06-27 17:51:04.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1753969918 {#113372
      date: 2025-07-31 15:51:58.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#113387 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#113586
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#113363}
        #id: 39317
        #name: "IEEE C37.123:2016"
        #slug: "ieee-c37-123-2016-ieee00005546-242729"
        #description: """
          Revision Standard - Superseded.<br />\n
          The development of specifications for the technical requirements for the design, fabrication, testing, installation, and in-service performance of a high-voltage gas-insulated substation (GIS) are covered in this guide.<br />\n
          \t\t\t\t<br />\n
          This guide is for the development of specifications for the technical requirements for the design, fabrication, testing, installation, and in-service performance of a high-voltage gas-insulated substation (GIS).<br />\n
          This document is issued as a guide for use in compiling procurement specifications for the design, fabrication, testing, installation and in-service performance of high-voltage gas-insulated substation equipment. This guide applies specifically to all types of high-voltage gas-insulated substation equipment rated above 52 kVac. The imperative mode of the language is illustrative of that used in design and procurement specifications. It does not imply that this document is anything other than advisory in its scope. Specifically, this revision will align the text with IEEE Std C37.122(TM) and IEEE Std C37.122.1(TM). This guide is not intended to develop a complete specification for a turnkey project. General terms and conditions forming the commercial part of a specification for a particular project are outside the scope of this document.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for Specifications for High-Voltage Gas-Insulated Substations Rated 52 kV and Above"
        -notes: "Superseded"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#113389 …}
    #channels: Doctrine\ORM\PersistentCollection {#113395 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7309 …}
    #reviews: Doctrine\ORM\PersistentCollection {#113391 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#113393 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7324 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#113380 …}
    -apiLastModifiedAt: DateTime @1745013600 {#113370
      date: 2025-04-19 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1712700000 {#113373
      date: 2024-04-10 00:00:00.0 Europe/Paris (+02:00)
    }
    -author: ""
    -publishedAt: DateTime @1464127200 {#113366
      date: 2016-05-25 00:00:00.0 Europe/Paris (+02:00)
    }
    -releasedAt: null
    -confirmedAt: null
    -canceledAt: null
    -edition: null
    -coreDocument: "C37.123"
    -bookCollection: ""
    -pageCount: 60
    -documents: Doctrine\ORM\PersistentCollection {#113383 …}
    -favorites: Doctrine\ORM\PersistentCollection {#113385 …}
  }
]
Attributes
[]
Component
App\Twig\Components\ProductMostRecent {#113653
  +product: App\Entity\Product\Product {#113363
    #id: 11077
    #code: "IEEE00005546"
    #attributes: Doctrine\ORM\PersistentCollection {#113397 …}
    #variants: Doctrine\ORM\PersistentCollection {#113399 …}
    #options: Doctrine\ORM\PersistentCollection {#113403 …}
    #associations: Doctrine\ORM\PersistentCollection {#113401 …}
    #createdAt: DateTime @1751039464 {#113374
      date: 2025-06-27 17:51:04.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1753969918 {#113372
      date: 2025-07-31 15:51:58.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#113387 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#113586
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#113363}
        #id: 39317
        #name: "IEEE C37.123:2016"
        #slug: "ieee-c37-123-2016-ieee00005546-242729"
        #description: """
          Revision Standard - Superseded.<br />\n
          The development of specifications for the technical requirements for the design, fabrication, testing, installation, and in-service performance of a high-voltage gas-insulated substation (GIS) are covered in this guide.<br />\n
          \t\t\t\t<br />\n
          This guide is for the development of specifications for the technical requirements for the design, fabrication, testing, installation, and in-service performance of a high-voltage gas-insulated substation (GIS).<br />\n
          This document is issued as a guide for use in compiling procurement specifications for the design, fabrication, testing, installation and in-service performance of high-voltage gas-insulated substation equipment. This guide applies specifically to all types of high-voltage gas-insulated substation equipment rated above 52 kVac. The imperative mode of the language is illustrative of that used in design and procurement specifications. It does not imply that this document is anything other than advisory in its scope. Specifically, this revision will align the text with IEEE Std C37.122(TM) and IEEE Std C37.122.1(TM). This guide is not intended to develop a complete specification for a turnkey project. General terms and conditions forming the commercial part of a specification for a particular project are outside the scope of this document.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for Specifications for High-Voltage Gas-Insulated Substations Rated 52 kV and Above"
        -notes: "Superseded"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#113389 …}
    #channels: Doctrine\ORM\PersistentCollection {#113395 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7309 …}
    #reviews: Doctrine\ORM\PersistentCollection {#113391 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#113393 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7324 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#113380 …}
    -apiLastModifiedAt: DateTime @1745013600 {#113370
      date: 2025-04-19 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1712700000 {#113373
      date: 2024-04-10 00:00:00.0 Europe/Paris (+02:00)
    }
    -author: ""
    -publishedAt: DateTime @1464127200 {#113366
      date: 2016-05-25 00:00:00.0 Europe/Paris (+02:00)
    }
    -releasedAt: null
    -confirmedAt: null
    -canceledAt: null
    -edition: null
    -coreDocument: "C37.123"
    -bookCollection: ""
    -pageCount: 60
    -documents: Doctrine\ORM\PersistentCollection {#113383 …}
    -favorites: Doctrine\ORM\PersistentCollection {#113385 …}
  }
  +label: "Historical"
  +icon: "historical"
  -mostRecentAttributeCode: "most_recent"
  -localeContext: Sylius\Component\Locale\Context\CompositeLocaleContext {#1833 …}
}
ProductState App\Twig\Components\ProductState 454.0 MiB 0.19 ms
Input props
[
  "product" => App\Entity\Product\Product {#7311
    #id: 9630
    #code: "IEEE00002658"
    #attributes: Doctrine\ORM\PersistentCollection {#7701 …}
    #variants: Doctrine\ORM\PersistentCollection {#7744 …}
    #options: Doctrine\ORM\PersistentCollection {#7916 …}
    #associations: Doctrine\ORM\PersistentCollection {#7900 …}
    #createdAt: DateTime @1751038423 {#7274
      date: 2025-06-27 17:33:43.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1754607004 {#7322
      date: 2025-08-08 00:50:04.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#7922 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#7921
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#7311}
        #id: 33529
        #name: "IEEE C37.123:1996 (R2008)"
        #slug: "ieee-c37-123-1996-r2008-ieee00002658-241282"
        #description: """
          Revision Standard - Superseded.<br />\n
          Technical requirements for the design, fabrication, testing, and installation of a gas-insulated substation (GIS) are provided. Parameters to be supplied by the purchaser and the technical requirements for the design, fabrication, testing, and installation to be furnished by the manufacturer are discussed. Environmental conditions, general and specific equipment requirements, and a proposal data sheet form are provided to aid the user.<br />\n
          \t\t\t\t<br />\n
          This guide covers the technical requirements for the design, fabrication, testing, installation, and in-service performance of a gas-insulated substation (GIS).<br />\n
          The supplier should furnish all equipment and material necessary to provide the complete GIS as shown on the functional one-line diagram, which may consist of circuit breakers (CB), disconnect switches (DS), maintenance ground switches (MGS), fast-acting ground switches (FGS), voltage transformers (VT), current transformers (CT), SF6-to-air bushings, SF6-to-cable termination, buses, cable termination enclosures, transformer or reactor bushing enclosures, enclosed surge arresters, elbows, bellows, controls, cables for control, protection and metering, density monitors, platforms, special tools, and SF6 gas for initial filling. All equipment and material shall be prefabricated, factory assembled, tested, and shipped in the largest practical assemblies.<br />\n
          Assembled equipment should be capable of withstanding electrical, mechanical, and thermal ratings of the specified system. All joints and connections should be able to withstand the forces of expansion, vibration, contraction, and specified seismic requirements without deformation, malfunction, or leakage. Equipment shall be capable of withstanding the specified outdoor or indoor environment.<br />\n
          Optimized arrangements, shown in annex A, are required to reduce installation time, provide ease of operation, minimize maintenance and repair prices, and facilitate future additions as described in the specifications. The user should identify space or area limitations for the GIS, driveway access, and any overhead clearance restrictions. Final arrangement shall be as mutually agreed to between the user and the supplier.<br />\n
          Field assembly maintenance, cost of operation, and capitalized cost of maintenance during equipment life will be considered in bid evaluations. To elicit a complete and uniform response from each bidder, proposal data is provided in clause 7.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide to Specifications for Gas-Insulated, Electric Power Substation Equipment"
        -notes: "Superseded"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#7534 …}
    #channels: Doctrine\ORM\PersistentCollection {#7628 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7309 …}
    #reviews: Doctrine\ORM\PersistentCollection {#7613 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#7645 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7324 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#7321 …}
    -apiLastModifiedAt: DateTime @1754517600 {#7317
      date: 2025-08-07 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1578006000 {#7292
      date: 2020-01-03 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @849308400 {#7318
      date: 1996-11-30 00:00:00.0 Europe/Paris (+01:00)
    }
    -releasedAt: null
    -confirmedAt: DateTime @1213221600 {#7316
      date: 2008-06-12 00:00:00.0 Europe/Paris (+02:00)
    }
    -canceledAt: null
    -edition: null
    -coreDocument: "C37.123"
    -bookCollection: ""
    -pageCount: 40
    -documents: Doctrine\ORM\PersistentCollection {#7465 …}
    -favorites: Doctrine\ORM\PersistentCollection {#7500 …}
  }
  "showFullLabel" => "true"
]
Attributes
[
  "showFullLabel" => "true"
]
Component
App\Twig\Components\ProductState {#113717
  +product: App\Entity\Product\Product {#7311
    #id: 9630
    #code: "IEEE00002658"
    #attributes: Doctrine\ORM\PersistentCollection {#7701 …}
    #variants: Doctrine\ORM\PersistentCollection {#7744 …}
    #options: Doctrine\ORM\PersistentCollection {#7916 …}
    #associations: Doctrine\ORM\PersistentCollection {#7900 …}
    #createdAt: DateTime @1751038423 {#7274
      date: 2025-06-27 17:33:43.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1754607004 {#7322
      date: 2025-08-08 00:50:04.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#7922 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#7921
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#7311}
        #id: 33529
        #name: "IEEE C37.123:1996 (R2008)"
        #slug: "ieee-c37-123-1996-r2008-ieee00002658-241282"
        #description: """
          Revision Standard - Superseded.<br />\n
          Technical requirements for the design, fabrication, testing, and installation of a gas-insulated substation (GIS) are provided. Parameters to be supplied by the purchaser and the technical requirements for the design, fabrication, testing, and installation to be furnished by the manufacturer are discussed. Environmental conditions, general and specific equipment requirements, and a proposal data sheet form are provided to aid the user.<br />\n
          \t\t\t\t<br />\n
          This guide covers the technical requirements for the design, fabrication, testing, installation, and in-service performance of a gas-insulated substation (GIS).<br />\n
          The supplier should furnish all equipment and material necessary to provide the complete GIS as shown on the functional one-line diagram, which may consist of circuit breakers (CB), disconnect switches (DS), maintenance ground switches (MGS), fast-acting ground switches (FGS), voltage transformers (VT), current transformers (CT), SF6-to-air bushings, SF6-to-cable termination, buses, cable termination enclosures, transformer or reactor bushing enclosures, enclosed surge arresters, elbows, bellows, controls, cables for control, protection and metering, density monitors, platforms, special tools, and SF6 gas for initial filling. All equipment and material shall be prefabricated, factory assembled, tested, and shipped in the largest practical assemblies.<br />\n
          Assembled equipment should be capable of withstanding electrical, mechanical, and thermal ratings of the specified system. All joints and connections should be able to withstand the forces of expansion, vibration, contraction, and specified seismic requirements without deformation, malfunction, or leakage. Equipment shall be capable of withstanding the specified outdoor or indoor environment.<br />\n
          Optimized arrangements, shown in annex A, are required to reduce installation time, provide ease of operation, minimize maintenance and repair prices, and facilitate future additions as described in the specifications. The user should identify space or area limitations for the GIS, driveway access, and any overhead clearance restrictions. Final arrangement shall be as mutually agreed to between the user and the supplier.<br />\n
          Field assembly maintenance, cost of operation, and capitalized cost of maintenance during equipment life will be considered in bid evaluations. To elicit a complete and uniform response from each bidder, proposal data is provided in clause 7.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide to Specifications for Gas-Insulated, Electric Power Substation Equipment"
        -notes: "Superseded"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#7534 …}
    #channels: Doctrine\ORM\PersistentCollection {#7628 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7309 …}
    #reviews: Doctrine\ORM\PersistentCollection {#7613 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#7645 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7324 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#7321 …}
    -apiLastModifiedAt: DateTime @1754517600 {#7317
      date: 2025-08-07 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1578006000 {#7292
      date: 2020-01-03 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @849308400 {#7318
      date: 1996-11-30 00:00:00.0 Europe/Paris (+01:00)
    }
    -releasedAt: null
    -confirmedAt: DateTime @1213221600 {#7316
      date: 2008-06-12 00:00:00.0 Europe/Paris (+02:00)
    }
    -canceledAt: null
    -edition: null
    -coreDocument: "C37.123"
    -bookCollection: ""
    -pageCount: 40
    -documents: Doctrine\ORM\PersistentCollection {#7465 …}
    -favorites: Doctrine\ORM\PersistentCollection {#7500 …}
  }
  +appearance: "state-suspended"
  +labels: [
    "Superseded"
    "Confirmed"
  ]
  -stateAttributeCode: "state"
  -localeContext: Sylius\Component\Locale\Context\CompositeLocaleContext {#1833 …}
}
ProductMostRecent App\Twig\Components\ProductMostRecent 454.0 MiB 0.64 ms
Input props
[
  "product" => App\Entity\Product\Product {#7311
    #id: 9630
    #code: "IEEE00002658"
    #attributes: Doctrine\ORM\PersistentCollection {#7701 …}
    #variants: Doctrine\ORM\PersistentCollection {#7744 …}
    #options: Doctrine\ORM\PersistentCollection {#7916 …}
    #associations: Doctrine\ORM\PersistentCollection {#7900 …}
    #createdAt: DateTime @1751038423 {#7274
      date: 2025-06-27 17:33:43.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1754607004 {#7322
      date: 2025-08-08 00:50:04.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#7922 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#7921
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#7311}
        #id: 33529
        #name: "IEEE C37.123:1996 (R2008)"
        #slug: "ieee-c37-123-1996-r2008-ieee00002658-241282"
        #description: """
          Revision Standard - Superseded.<br />\n
          Technical requirements for the design, fabrication, testing, and installation of a gas-insulated substation (GIS) are provided. Parameters to be supplied by the purchaser and the technical requirements for the design, fabrication, testing, and installation to be furnished by the manufacturer are discussed. Environmental conditions, general and specific equipment requirements, and a proposal data sheet form are provided to aid the user.<br />\n
          \t\t\t\t<br />\n
          This guide covers the technical requirements for the design, fabrication, testing, installation, and in-service performance of a gas-insulated substation (GIS).<br />\n
          The supplier should furnish all equipment and material necessary to provide the complete GIS as shown on the functional one-line diagram, which may consist of circuit breakers (CB), disconnect switches (DS), maintenance ground switches (MGS), fast-acting ground switches (FGS), voltage transformers (VT), current transformers (CT), SF6-to-air bushings, SF6-to-cable termination, buses, cable termination enclosures, transformer or reactor bushing enclosures, enclosed surge arresters, elbows, bellows, controls, cables for control, protection and metering, density monitors, platforms, special tools, and SF6 gas for initial filling. All equipment and material shall be prefabricated, factory assembled, tested, and shipped in the largest practical assemblies.<br />\n
          Assembled equipment should be capable of withstanding electrical, mechanical, and thermal ratings of the specified system. All joints and connections should be able to withstand the forces of expansion, vibration, contraction, and specified seismic requirements without deformation, malfunction, or leakage. Equipment shall be capable of withstanding the specified outdoor or indoor environment.<br />\n
          Optimized arrangements, shown in annex A, are required to reduce installation time, provide ease of operation, minimize maintenance and repair prices, and facilitate future additions as described in the specifications. The user should identify space or area limitations for the GIS, driveway access, and any overhead clearance restrictions. Final arrangement shall be as mutually agreed to between the user and the supplier.<br />\n
          Field assembly maintenance, cost of operation, and capitalized cost of maintenance during equipment life will be considered in bid evaluations. To elicit a complete and uniform response from each bidder, proposal data is provided in clause 7.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide to Specifications for Gas-Insulated, Electric Power Substation Equipment"
        -notes: "Superseded"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#7534 …}
    #channels: Doctrine\ORM\PersistentCollection {#7628 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7309 …}
    #reviews: Doctrine\ORM\PersistentCollection {#7613 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#7645 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7324 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#7321 …}
    -apiLastModifiedAt: DateTime @1754517600 {#7317
      date: 2025-08-07 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1578006000 {#7292
      date: 2020-01-03 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @849308400 {#7318
      date: 1996-11-30 00:00:00.0 Europe/Paris (+01:00)
    }
    -releasedAt: null
    -confirmedAt: DateTime @1213221600 {#7316
      date: 2008-06-12 00:00:00.0 Europe/Paris (+02:00)
    }
    -canceledAt: null
    -edition: null
    -coreDocument: "C37.123"
    -bookCollection: ""
    -pageCount: 40
    -documents: Doctrine\ORM\PersistentCollection {#7465 …}
    -favorites: Doctrine\ORM\PersistentCollection {#7500 …}
  }
]
Attributes
[]
Component
App\Twig\Components\ProductMostRecent {#113744
  +product: App\Entity\Product\Product {#7311
    #id: 9630
    #code: "IEEE00002658"
    #attributes: Doctrine\ORM\PersistentCollection {#7701 …}
    #variants: Doctrine\ORM\PersistentCollection {#7744 …}
    #options: Doctrine\ORM\PersistentCollection {#7916 …}
    #associations: Doctrine\ORM\PersistentCollection {#7900 …}
    #createdAt: DateTime @1751038423 {#7274
      date: 2025-06-27 17:33:43.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1754607004 {#7322
      date: 2025-08-08 00:50:04.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#7922 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#7921
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#7311}
        #id: 33529
        #name: "IEEE C37.123:1996 (R2008)"
        #slug: "ieee-c37-123-1996-r2008-ieee00002658-241282"
        #description: """
          Revision Standard - Superseded.<br />\n
          Technical requirements for the design, fabrication, testing, and installation of a gas-insulated substation (GIS) are provided. Parameters to be supplied by the purchaser and the technical requirements for the design, fabrication, testing, and installation to be furnished by the manufacturer are discussed. Environmental conditions, general and specific equipment requirements, and a proposal data sheet form are provided to aid the user.<br />\n
          \t\t\t\t<br />\n
          This guide covers the technical requirements for the design, fabrication, testing, installation, and in-service performance of a gas-insulated substation (GIS).<br />\n
          The supplier should furnish all equipment and material necessary to provide the complete GIS as shown on the functional one-line diagram, which may consist of circuit breakers (CB), disconnect switches (DS), maintenance ground switches (MGS), fast-acting ground switches (FGS), voltage transformers (VT), current transformers (CT), SF6-to-air bushings, SF6-to-cable termination, buses, cable termination enclosures, transformer or reactor bushing enclosures, enclosed surge arresters, elbows, bellows, controls, cables for control, protection and metering, density monitors, platforms, special tools, and SF6 gas for initial filling. All equipment and material shall be prefabricated, factory assembled, tested, and shipped in the largest practical assemblies.<br />\n
          Assembled equipment should be capable of withstanding electrical, mechanical, and thermal ratings of the specified system. All joints and connections should be able to withstand the forces of expansion, vibration, contraction, and specified seismic requirements without deformation, malfunction, or leakage. Equipment shall be capable of withstanding the specified outdoor or indoor environment.<br />\n
          Optimized arrangements, shown in annex A, are required to reduce installation time, provide ease of operation, minimize maintenance and repair prices, and facilitate future additions as described in the specifications. The user should identify space or area limitations for the GIS, driveway access, and any overhead clearance restrictions. Final arrangement shall be as mutually agreed to between the user and the supplier.<br />\n
          Field assembly maintenance, cost of operation, and capitalized cost of maintenance during equipment life will be considered in bid evaluations. To elicit a complete and uniform response from each bidder, proposal data is provided in clause 7.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide to Specifications for Gas-Insulated, Electric Power Substation Equipment"
        -notes: "Superseded"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#7534 …}
    #channels: Doctrine\ORM\PersistentCollection {#7628 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7309 …}
    #reviews: Doctrine\ORM\PersistentCollection {#7613 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#7645 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7324 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#7321 …}
    -apiLastModifiedAt: DateTime @1754517600 {#7317
      date: 2025-08-07 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1578006000 {#7292
      date: 2020-01-03 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @849308400 {#7318
      date: 1996-11-30 00:00:00.0 Europe/Paris (+01:00)
    }
    -releasedAt: null
    -confirmedAt: DateTime @1213221600 {#7316
      date: 2008-06-12 00:00:00.0 Europe/Paris (+02:00)
    }
    -canceledAt: null
    -edition: null
    -coreDocument: "C37.123"
    -bookCollection: ""
    -pageCount: 40
    -documents: Doctrine\ORM\PersistentCollection {#7465 …}
    -favorites: Doctrine\ORM\PersistentCollection {#7500 …}
  }
  +label: "Historical"
  +icon: "historical"
  -mostRecentAttributeCode: "most_recent"
  -localeContext: Sylius\Component\Locale\Context\CompositeLocaleContext {#1833 …}
}
ProductState App\Twig\Components\ProductState 454.0 MiB 0.18 ms
Input props
[
  "product" => App\Entity\Product\Product {#106688
    #id: 9629
    #code: "IEEE00002657"
    #attributes: Doctrine\ORM\PersistentCollection {#106671 …}
    #variants: Doctrine\ORM\PersistentCollection {#106668 …}
    #options: Doctrine\ORM\PersistentCollection {#106664 …}
    #associations: Doctrine\ORM\PersistentCollection {#106666 …}
    #createdAt: DateTime @1751038422 {#106696
      date: 2025-06-27 17:33:42.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1753969444 {#106669
      date: 2025-07-31 15:44:04.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#106682 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#106721
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#106688}
        #id: 33525
        #name: "IEEE C37.123:1991"
        #slug: "ieee-c37-123-1991-ieee00002657-241281"
        #description: """
          New IEEE Standard - Superseded.<br />\n
          IEEE C37.123-1991 covers the technical requirements for the design, fabrication, testing, and installation of a gas-insulated substation (GIS). The guide looks at parameters to be supplied by the purchaser and technical requirements for the design, fabrication, testing, and installation to be furnished by the manufacturer. Environmental conditions, general and specific equipment requirements, and a proposal data sheet form are included to aid the user.<br />\n
          \t\t\t\t<br />\n
          1.1.1 This guide covers the technical requirements for the design, fabrication, testing, and installation of a gas-insulated substation (GIs).<br />\n
          1.1.2 The manufacturer shall furnish all work necessary to provide the complete GIS as shown on the functional one-line diagram, which may consist of circuit breakers (CBI, disconnect switches (DS), maintenance ground switches (MGS), fast-acting ground switches (FGS), voltage transformers (VT), current transformers (CT), SF6-to-air bushings, buses, cable potherad enclosures, transformer or reactor bushing enclosures, enclosed surge arresters, elbows, bellows, controls, and supporting structures in applicable numbers. All equipment and material shall be prefabricated, factory assembled, tested, and shipped in the largest practical assemblies.<br />\n
          1.1.3 The assembled equipment shall be capable of withstanding electrical, mechanical, and thermal ratings of the specified system. All joints and connections shall be able to withstand the forces of expansion, vibration, contraction, and specified seismic requirements without deformation, malfunction, and leakage.<br />\n
          1.1.4 The equipment shall be capable of withstanding the specified outdoor or indoor environment.<br />\n
          1.1.5 Optimized arrangements are required to reduce installation time, provide ease of operations,<br />\n
          minimize maintenance and repair costs, and facilitate future additions as described in the specifications. The proposal shall include recommended spare parts for reduced outage time in case of a fault, and delivery time in case of emergency.<br />\n
          1.1.6 Field assembly costs and maintenance costs will be considered in bid evaluations.<br />\n
          1.1.7 In order to elicit a complete and uniform response from each bidder, Section 4, Proposal Data, is provided.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide to Specifications for Gas-Insulated Substation Equipment"
        -notes: "Superseded"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#106679 …}
    #channels: Doctrine\ORM\PersistentCollection {#106673 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7309 …}
    #reviews: Doctrine\ORM\PersistentCollection {#106677 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#106675 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7324 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#106689 …}
    -apiLastModifiedAt: DateTime @1745013600 {#106656
      date: 2025-04-19 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1578006000 {#106695
      date: 2020-01-03 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @682898400 {#106694
      date: 1991-08-23 00:00:00.0 Europe/Paris (+02:00)
    }
    -releasedAt: null
    -confirmedAt: null
    -canceledAt: null
    -edition: null
    -coreDocument: "C37.123"
    -bookCollection: ""
    -pageCount: 22
    -documents: Doctrine\ORM\PersistentCollection {#106686 …}
    -favorites: Doctrine\ORM\PersistentCollection {#106684 …}
  }
  "showFullLabel" => "true"
]
Attributes
[
  "showFullLabel" => "true"
]
Component
App\Twig\Components\ProductState {#113808
  +product: App\Entity\Product\Product {#106688
    #id: 9629
    #code: "IEEE00002657"
    #attributes: Doctrine\ORM\PersistentCollection {#106671 …}
    #variants: Doctrine\ORM\PersistentCollection {#106668 …}
    #options: Doctrine\ORM\PersistentCollection {#106664 …}
    #associations: Doctrine\ORM\PersistentCollection {#106666 …}
    #createdAt: DateTime @1751038422 {#106696
      date: 2025-06-27 17:33:42.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1753969444 {#106669
      date: 2025-07-31 15:44:04.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#106682 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#106721
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#106688}
        #id: 33525
        #name: "IEEE C37.123:1991"
        #slug: "ieee-c37-123-1991-ieee00002657-241281"
        #description: """
          New IEEE Standard - Superseded.<br />\n
          IEEE C37.123-1991 covers the technical requirements for the design, fabrication, testing, and installation of a gas-insulated substation (GIS). The guide looks at parameters to be supplied by the purchaser and technical requirements for the design, fabrication, testing, and installation to be furnished by the manufacturer. Environmental conditions, general and specific equipment requirements, and a proposal data sheet form are included to aid the user.<br />\n
          \t\t\t\t<br />\n
          1.1.1 This guide covers the technical requirements for the design, fabrication, testing, and installation of a gas-insulated substation (GIs).<br />\n
          1.1.2 The manufacturer shall furnish all work necessary to provide the complete GIS as shown on the functional one-line diagram, which may consist of circuit breakers (CBI, disconnect switches (DS), maintenance ground switches (MGS), fast-acting ground switches (FGS), voltage transformers (VT), current transformers (CT), SF6-to-air bushings, buses, cable potherad enclosures, transformer or reactor bushing enclosures, enclosed surge arresters, elbows, bellows, controls, and supporting structures in applicable numbers. All equipment and material shall be prefabricated, factory assembled, tested, and shipped in the largest practical assemblies.<br />\n
          1.1.3 The assembled equipment shall be capable of withstanding electrical, mechanical, and thermal ratings of the specified system. All joints and connections shall be able to withstand the forces of expansion, vibration, contraction, and specified seismic requirements without deformation, malfunction, and leakage.<br />\n
          1.1.4 The equipment shall be capable of withstanding the specified outdoor or indoor environment.<br />\n
          1.1.5 Optimized arrangements are required to reduce installation time, provide ease of operations,<br />\n
          minimize maintenance and repair costs, and facilitate future additions as described in the specifications. The proposal shall include recommended spare parts for reduced outage time in case of a fault, and delivery time in case of emergency.<br />\n
          1.1.6 Field assembly costs and maintenance costs will be considered in bid evaluations.<br />\n
          1.1.7 In order to elicit a complete and uniform response from each bidder, Section 4, Proposal Data, is provided.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide to Specifications for Gas-Insulated Substation Equipment"
        -notes: "Superseded"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#106679 …}
    #channels: Doctrine\ORM\PersistentCollection {#106673 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7309 …}
    #reviews: Doctrine\ORM\PersistentCollection {#106677 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#106675 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7324 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#106689 …}
    -apiLastModifiedAt: DateTime @1745013600 {#106656
      date: 2025-04-19 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1578006000 {#106695
      date: 2020-01-03 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @682898400 {#106694
      date: 1991-08-23 00:00:00.0 Europe/Paris (+02:00)
    }
    -releasedAt: null
    -confirmedAt: null
    -canceledAt: null
    -edition: null
    -coreDocument: "C37.123"
    -bookCollection: ""
    -pageCount: 22
    -documents: Doctrine\ORM\PersistentCollection {#106686 …}
    -favorites: Doctrine\ORM\PersistentCollection {#106684 …}
  }
  +appearance: "state-suspended"
  +labels: [
    "Superseded"
  ]
  -stateAttributeCode: "state"
  -localeContext: Sylius\Component\Locale\Context\CompositeLocaleContext {#1833 …}
}
ProductMostRecent App\Twig\Components\ProductMostRecent 454.0 MiB 0.62 ms
Input props
[
  "product" => App\Entity\Product\Product {#106688
    #id: 9629
    #code: "IEEE00002657"
    #attributes: Doctrine\ORM\PersistentCollection {#106671 …}
    #variants: Doctrine\ORM\PersistentCollection {#106668 …}
    #options: Doctrine\ORM\PersistentCollection {#106664 …}
    #associations: Doctrine\ORM\PersistentCollection {#106666 …}
    #createdAt: DateTime @1751038422 {#106696
      date: 2025-06-27 17:33:42.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1753969444 {#106669
      date: 2025-07-31 15:44:04.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#106682 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#106721
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#106688}
        #id: 33525
        #name: "IEEE C37.123:1991"
        #slug: "ieee-c37-123-1991-ieee00002657-241281"
        #description: """
          New IEEE Standard - Superseded.<br />\n
          IEEE C37.123-1991 covers the technical requirements for the design, fabrication, testing, and installation of a gas-insulated substation (GIS). The guide looks at parameters to be supplied by the purchaser and technical requirements for the design, fabrication, testing, and installation to be furnished by the manufacturer. Environmental conditions, general and specific equipment requirements, and a proposal data sheet form are included to aid the user.<br />\n
          \t\t\t\t<br />\n
          1.1.1 This guide covers the technical requirements for the design, fabrication, testing, and installation of a gas-insulated substation (GIs).<br />\n
          1.1.2 The manufacturer shall furnish all work necessary to provide the complete GIS as shown on the functional one-line diagram, which may consist of circuit breakers (CBI, disconnect switches (DS), maintenance ground switches (MGS), fast-acting ground switches (FGS), voltage transformers (VT), current transformers (CT), SF6-to-air bushings, buses, cable potherad enclosures, transformer or reactor bushing enclosures, enclosed surge arresters, elbows, bellows, controls, and supporting structures in applicable numbers. All equipment and material shall be prefabricated, factory assembled, tested, and shipped in the largest practical assemblies.<br />\n
          1.1.3 The assembled equipment shall be capable of withstanding electrical, mechanical, and thermal ratings of the specified system. All joints and connections shall be able to withstand the forces of expansion, vibration, contraction, and specified seismic requirements without deformation, malfunction, and leakage.<br />\n
          1.1.4 The equipment shall be capable of withstanding the specified outdoor or indoor environment.<br />\n
          1.1.5 Optimized arrangements are required to reduce installation time, provide ease of operations,<br />\n
          minimize maintenance and repair costs, and facilitate future additions as described in the specifications. The proposal shall include recommended spare parts for reduced outage time in case of a fault, and delivery time in case of emergency.<br />\n
          1.1.6 Field assembly costs and maintenance costs will be considered in bid evaluations.<br />\n
          1.1.7 In order to elicit a complete and uniform response from each bidder, Section 4, Proposal Data, is provided.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide to Specifications for Gas-Insulated Substation Equipment"
        -notes: "Superseded"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#106679 …}
    #channels: Doctrine\ORM\PersistentCollection {#106673 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7309 …}
    #reviews: Doctrine\ORM\PersistentCollection {#106677 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#106675 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7324 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#106689 …}
    -apiLastModifiedAt: DateTime @1745013600 {#106656
      date: 2025-04-19 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1578006000 {#106695
      date: 2020-01-03 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @682898400 {#106694
      date: 1991-08-23 00:00:00.0 Europe/Paris (+02:00)
    }
    -releasedAt: null
    -confirmedAt: null
    -canceledAt: null
    -edition: null
    -coreDocument: "C37.123"
    -bookCollection: ""
    -pageCount: 22
    -documents: Doctrine\ORM\PersistentCollection {#106686 …}
    -favorites: Doctrine\ORM\PersistentCollection {#106684 …}
  }
]
Attributes
[]
Component
App\Twig\Components\ProductMostRecent {#113835
  +product: App\Entity\Product\Product {#106688
    #id: 9629
    #code: "IEEE00002657"
    #attributes: Doctrine\ORM\PersistentCollection {#106671 …}
    #variants: Doctrine\ORM\PersistentCollection {#106668 …}
    #options: Doctrine\ORM\PersistentCollection {#106664 …}
    #associations: Doctrine\ORM\PersistentCollection {#106666 …}
    #createdAt: DateTime @1751038422 {#106696
      date: 2025-06-27 17:33:42.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1753969444 {#106669
      date: 2025-07-31 15:44:04.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#106682 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#106721
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#106688}
        #id: 33525
        #name: "IEEE C37.123:1991"
        #slug: "ieee-c37-123-1991-ieee00002657-241281"
        #description: """
          New IEEE Standard - Superseded.<br />\n
          IEEE C37.123-1991 covers the technical requirements for the design, fabrication, testing, and installation of a gas-insulated substation (GIS). The guide looks at parameters to be supplied by the purchaser and technical requirements for the design, fabrication, testing, and installation to be furnished by the manufacturer. Environmental conditions, general and specific equipment requirements, and a proposal data sheet form are included to aid the user.<br />\n
          \t\t\t\t<br />\n
          1.1.1 This guide covers the technical requirements for the design, fabrication, testing, and installation of a gas-insulated substation (GIs).<br />\n
          1.1.2 The manufacturer shall furnish all work necessary to provide the complete GIS as shown on the functional one-line diagram, which may consist of circuit breakers (CBI, disconnect switches (DS), maintenance ground switches (MGS), fast-acting ground switches (FGS), voltage transformers (VT), current transformers (CT), SF6-to-air bushings, buses, cable potherad enclosures, transformer or reactor bushing enclosures, enclosed surge arresters, elbows, bellows, controls, and supporting structures in applicable numbers. All equipment and material shall be prefabricated, factory assembled, tested, and shipped in the largest practical assemblies.<br />\n
          1.1.3 The assembled equipment shall be capable of withstanding electrical, mechanical, and thermal ratings of the specified system. All joints and connections shall be able to withstand the forces of expansion, vibration, contraction, and specified seismic requirements without deformation, malfunction, and leakage.<br />\n
          1.1.4 The equipment shall be capable of withstanding the specified outdoor or indoor environment.<br />\n
          1.1.5 Optimized arrangements are required to reduce installation time, provide ease of operations,<br />\n
          minimize maintenance and repair costs, and facilitate future additions as described in the specifications. The proposal shall include recommended spare parts for reduced outage time in case of a fault, and delivery time in case of emergency.<br />\n
          1.1.6 Field assembly costs and maintenance costs will be considered in bid evaluations.<br />\n
          1.1.7 In order to elicit a complete and uniform response from each bidder, Section 4, Proposal Data, is provided.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide to Specifications for Gas-Insulated Substation Equipment"
        -notes: "Superseded"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#106679 …}
    #channels: Doctrine\ORM\PersistentCollection {#106673 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7309 …}
    #reviews: Doctrine\ORM\PersistentCollection {#106677 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#106675 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7324 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#106689 …}
    -apiLastModifiedAt: DateTime @1745013600 {#106656
      date: 2025-04-19 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1578006000 {#106695
      date: 2020-01-03 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @682898400 {#106694
      date: 1991-08-23 00:00:00.0 Europe/Paris (+02:00)
    }
    -releasedAt: null
    -confirmedAt: null
    -canceledAt: null
    -edition: null
    -coreDocument: "C37.123"
    -bookCollection: ""
    -pageCount: 22
    -documents: Doctrine\ORM\PersistentCollection {#106686 …}
    -favorites: Doctrine\ORM\PersistentCollection {#106684 …}
  }
  +label: "Historical"
  +icon: "historical"
  -mostRecentAttributeCode: "most_recent"
  -localeContext: Sylius\Component\Locale\Context\CompositeLocaleContext {#1833 …}
}