Components

4 Twig Components
12 Render Count
10 ms Render Time
262.0 MiB Memory Usage

Components

Name Metadata Render Count Render Time
ProductState
"App\Twig\Components\ProductState"
components/ProductState.html.twig
5 1.12ms
ProductMostRecent
"App\Twig\Components\ProductMostRecent"
components/ProductMostRecent.html.twig
5 3.59ms
ProductType
"App\Twig\Components\ProductType"
components/ProductType.html.twig
1 0.24ms
ProductCard
"App\Twig\Components\ProductCard"
components/ProductCard.html.twig
1 6.41ms

Render calls

ProductState App\Twig\Components\ProductState 262.0 MiB 0.36 ms
Input props
[
  "product" => App\Entity\Product\Product {#7310
    #id: 11503
    #code: "IEEE00006231"
    #attributes: Doctrine\ORM\PersistentCollection {#7700 …}
    #variants: Doctrine\ORM\PersistentCollection {#7743 …}
    #options: Doctrine\ORM\PersistentCollection {#7915 …}
    #associations: Doctrine\ORM\PersistentCollection {#7899 …}
    #createdAt: DateTime @1751039748 {#7274
      date: 2025-06-27 17:55:48.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1754608621 {#7322
      date: 2025-08-08 01:17:01.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#7921 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#7920
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#7310}
        #id: 41021
        #name: "IEEE 1427:2020"
        #slug: "ieee-1427-2020-ieee00006231-243155"
        #description: """
          Revision Standard - Active.<br />\n
          This guide, covering three-phase ac systems from 1 kV to 800 kV, provides recommended electrical operating, safety clearances, and insulation levels in air-insulated electric supply substations; addresses insulation coordination procedures; provides design procedures for the selection and coordination of the insulation levels within the station as they relate to substation clearances; and addresses how reduced clearances in high-voltage ac substations will allow for compact bus arrangements and substation voltage uprating applications.<br />\n
          \t\t\t\t<br />\n
          This guide, covering three-phase ac systems from 1 kV to 800 kV, provides recommended electrical operating, safety clearances, and insulation levels in air-insulated electric supply substations; addresses insulation coordination procedures; provides design procedures for the selection and coordination of the insulation levels within the station as they relate to substation clearances; and addresses how reduced clearances in highvoltage ac substations will allow for compact bus arrangements and substation voltage uprating applications. This guide addresses insulation coordination procedures, including the choice of insulation levels and arrester specification, in limited detail and only as relevant to clearance requirements. Detailed and expanded coverage of insulation coordination procedures is provided in other ANSI and IEEE guides and standards (see Clause 2). This guide focuses on open-air bus assemblies and configurations and excludes apparatus clearances (i.e., bushing clearances for transformers, and breakers). Detailed coverage of apparatus clearances is provided in other applicable guides and standards.<br />\n
          Proper electrical clearances are necessary for the design, construction, and operation of electric supply substations. This document develops guidelines for the application of recommended electrical clearances and insulation levels in air-insulated substations. The recommended clearances incorporate both design/operating clearances and safety clearances.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for Recommended Electrical Clearances and Insulation Levels in Air Insulated Electrical Power Substations"
        -notes: "Active"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#7533 …}
    #channels: Doctrine\ORM\PersistentCollection {#7627 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7311 …}
    #reviews: Doctrine\ORM\PersistentCollection {#7612 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#7644 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7325 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#7389 …}
    -apiLastModifiedAt: DateTime @1754517600 {#7317
      date: 2025-08-07 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1627250400 {#7292
      date: 2021-07-26 00:00:00.0 Europe/Paris (+02:00)
    }
    -author: ""
    -publishedAt: DateTime @1616108400 {#7318
      date: 2021-03-19 00:00:00.0 Europe/Paris (+01:00)
    }
    -releasedAt: null
    -confirmedAt: null
    -canceledAt: null
    -edition: null
    -coreDocument: "1427"
    -bookCollection: ""
    -pageCount: 51
    -documents: Doctrine\ORM\PersistentCollection {#7464 …}
    -favorites: Doctrine\ORM\PersistentCollection {#7499 …}
  }
  "showFullLabel" => "true"
]
Attributes
[
  "showFullLabel" => "true"
]
Component
App\Twig\Components\ProductState {#93113
  +product: App\Entity\Product\Product {#7310
    #id: 11503
    #code: "IEEE00006231"
    #attributes: Doctrine\ORM\PersistentCollection {#7700 …}
    #variants: Doctrine\ORM\PersistentCollection {#7743 …}
    #options: Doctrine\ORM\PersistentCollection {#7915 …}
    #associations: Doctrine\ORM\PersistentCollection {#7899 …}
    #createdAt: DateTime @1751039748 {#7274
      date: 2025-06-27 17:55:48.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1754608621 {#7322
      date: 2025-08-08 01:17:01.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#7921 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#7920
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#7310}
        #id: 41021
        #name: "IEEE 1427:2020"
        #slug: "ieee-1427-2020-ieee00006231-243155"
        #description: """
          Revision Standard - Active.<br />\n
          This guide, covering three-phase ac systems from 1 kV to 800 kV, provides recommended electrical operating, safety clearances, and insulation levels in air-insulated electric supply substations; addresses insulation coordination procedures; provides design procedures for the selection and coordination of the insulation levels within the station as they relate to substation clearances; and addresses how reduced clearances in high-voltage ac substations will allow for compact bus arrangements and substation voltage uprating applications.<br />\n
          \t\t\t\t<br />\n
          This guide, covering three-phase ac systems from 1 kV to 800 kV, provides recommended electrical operating, safety clearances, and insulation levels in air-insulated electric supply substations; addresses insulation coordination procedures; provides design procedures for the selection and coordination of the insulation levels within the station as they relate to substation clearances; and addresses how reduced clearances in highvoltage ac substations will allow for compact bus arrangements and substation voltage uprating applications. This guide addresses insulation coordination procedures, including the choice of insulation levels and arrester specification, in limited detail and only as relevant to clearance requirements. Detailed and expanded coverage of insulation coordination procedures is provided in other ANSI and IEEE guides and standards (see Clause 2). This guide focuses on open-air bus assemblies and configurations and excludes apparatus clearances (i.e., bushing clearances for transformers, and breakers). Detailed coverage of apparatus clearances is provided in other applicable guides and standards.<br />\n
          Proper electrical clearances are necessary for the design, construction, and operation of electric supply substations. This document develops guidelines for the application of recommended electrical clearances and insulation levels in air-insulated substations. The recommended clearances incorporate both design/operating clearances and safety clearances.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for Recommended Electrical Clearances and Insulation Levels in Air Insulated Electrical Power Substations"
        -notes: "Active"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#7533 …}
    #channels: Doctrine\ORM\PersistentCollection {#7627 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7311 …}
    #reviews: Doctrine\ORM\PersistentCollection {#7612 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#7644 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7325 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#7389 …}
    -apiLastModifiedAt: DateTime @1754517600 {#7317
      date: 2025-08-07 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1627250400 {#7292
      date: 2021-07-26 00:00:00.0 Europe/Paris (+02:00)
    }
    -author: ""
    -publishedAt: DateTime @1616108400 {#7318
      date: 2021-03-19 00:00:00.0 Europe/Paris (+01:00)
    }
    -releasedAt: null
    -confirmedAt: null
    -canceledAt: null
    -edition: null
    -coreDocument: "1427"
    -bookCollection: ""
    -pageCount: 51
    -documents: Doctrine\ORM\PersistentCollection {#7464 …}
    -favorites: Doctrine\ORM\PersistentCollection {#7499 …}
  }
  +appearance: "state-active"
  +labels: [
    "Active"
  ]
  -stateAttributeCode: "state"
  -localeContext: Sylius\Component\Locale\Context\CompositeLocaleContext {#1833 …}
}
ProductType App\Twig\Components\ProductType 262.0 MiB 0.24 ms
Input props
[
  "product" => App\Entity\Product\Product {#7310
    #id: 11503
    #code: "IEEE00006231"
    #attributes: Doctrine\ORM\PersistentCollection {#7700 …}
    #variants: Doctrine\ORM\PersistentCollection {#7743 …}
    #options: Doctrine\ORM\PersistentCollection {#7915 …}
    #associations: Doctrine\ORM\PersistentCollection {#7899 …}
    #createdAt: DateTime @1751039748 {#7274
      date: 2025-06-27 17:55:48.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1754608621 {#7322
      date: 2025-08-08 01:17:01.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#7921 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#7920
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#7310}
        #id: 41021
        #name: "IEEE 1427:2020"
        #slug: "ieee-1427-2020-ieee00006231-243155"
        #description: """
          Revision Standard - Active.<br />\n
          This guide, covering three-phase ac systems from 1 kV to 800 kV, provides recommended electrical operating, safety clearances, and insulation levels in air-insulated electric supply substations; addresses insulation coordination procedures; provides design procedures for the selection and coordination of the insulation levels within the station as they relate to substation clearances; and addresses how reduced clearances in high-voltage ac substations will allow for compact bus arrangements and substation voltage uprating applications.<br />\n
          \t\t\t\t<br />\n
          This guide, covering three-phase ac systems from 1 kV to 800 kV, provides recommended electrical operating, safety clearances, and insulation levels in air-insulated electric supply substations; addresses insulation coordination procedures; provides design procedures for the selection and coordination of the insulation levels within the station as they relate to substation clearances; and addresses how reduced clearances in highvoltage ac substations will allow for compact bus arrangements and substation voltage uprating applications. This guide addresses insulation coordination procedures, including the choice of insulation levels and arrester specification, in limited detail and only as relevant to clearance requirements. Detailed and expanded coverage of insulation coordination procedures is provided in other ANSI and IEEE guides and standards (see Clause 2). This guide focuses on open-air bus assemblies and configurations and excludes apparatus clearances (i.e., bushing clearances for transformers, and breakers). Detailed coverage of apparatus clearances is provided in other applicable guides and standards.<br />\n
          Proper electrical clearances are necessary for the design, construction, and operation of electric supply substations. This document develops guidelines for the application of recommended electrical clearances and insulation levels in air-insulated substations. The recommended clearances incorporate both design/operating clearances and safety clearances.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for Recommended Electrical Clearances and Insulation Levels in Air Insulated Electrical Power Substations"
        -notes: "Active"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#7533 …}
    #channels: Doctrine\ORM\PersistentCollection {#7627 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7311 …}
    #reviews: Doctrine\ORM\PersistentCollection {#7612 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#7644 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7325 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#7389 …}
    -apiLastModifiedAt: DateTime @1754517600 {#7317
      date: 2025-08-07 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1627250400 {#7292
      date: 2021-07-26 00:00:00.0 Europe/Paris (+02:00)
    }
    -author: ""
    -publishedAt: DateTime @1616108400 {#7318
      date: 2021-03-19 00:00:00.0 Europe/Paris (+01:00)
    }
    -releasedAt: null
    -confirmedAt: null
    -canceledAt: null
    -edition: null
    -coreDocument: "1427"
    -bookCollection: ""
    -pageCount: 51
    -documents: Doctrine\ORM\PersistentCollection {#7464 …}
    -favorites: Doctrine\ORM\PersistentCollection {#7499 …}
  }
]
Attributes
[]
Component
App\Twig\Components\ProductType {#93293
  +product: App\Entity\Product\Product {#7310
    #id: 11503
    #code: "IEEE00006231"
    #attributes: Doctrine\ORM\PersistentCollection {#7700 …}
    #variants: Doctrine\ORM\PersistentCollection {#7743 …}
    #options: Doctrine\ORM\PersistentCollection {#7915 …}
    #associations: Doctrine\ORM\PersistentCollection {#7899 …}
    #createdAt: DateTime @1751039748 {#7274
      date: 2025-06-27 17:55:48.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1754608621 {#7322
      date: 2025-08-08 01:17:01.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#7921 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#7920
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#7310}
        #id: 41021
        #name: "IEEE 1427:2020"
        #slug: "ieee-1427-2020-ieee00006231-243155"
        #description: """
          Revision Standard - Active.<br />\n
          This guide, covering three-phase ac systems from 1 kV to 800 kV, provides recommended electrical operating, safety clearances, and insulation levels in air-insulated electric supply substations; addresses insulation coordination procedures; provides design procedures for the selection and coordination of the insulation levels within the station as they relate to substation clearances; and addresses how reduced clearances in high-voltage ac substations will allow for compact bus arrangements and substation voltage uprating applications.<br />\n
          \t\t\t\t<br />\n
          This guide, covering three-phase ac systems from 1 kV to 800 kV, provides recommended electrical operating, safety clearances, and insulation levels in air-insulated electric supply substations; addresses insulation coordination procedures; provides design procedures for the selection and coordination of the insulation levels within the station as they relate to substation clearances; and addresses how reduced clearances in highvoltage ac substations will allow for compact bus arrangements and substation voltage uprating applications. This guide addresses insulation coordination procedures, including the choice of insulation levels and arrester specification, in limited detail and only as relevant to clearance requirements. Detailed and expanded coverage of insulation coordination procedures is provided in other ANSI and IEEE guides and standards (see Clause 2). This guide focuses on open-air bus assemblies and configurations and excludes apparatus clearances (i.e., bushing clearances for transformers, and breakers). Detailed coverage of apparatus clearances is provided in other applicable guides and standards.<br />\n
          Proper electrical clearances are necessary for the design, construction, and operation of electric supply substations. This document develops guidelines for the application of recommended electrical clearances and insulation levels in air-insulated substations. The recommended clearances incorporate both design/operating clearances and safety clearances.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for Recommended Electrical Clearances and Insulation Levels in Air Insulated Electrical Power Substations"
        -notes: "Active"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#7533 …}
    #channels: Doctrine\ORM\PersistentCollection {#7627 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7311 …}
    #reviews: Doctrine\ORM\PersistentCollection {#7612 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#7644 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7325 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#7389 …}
    -apiLastModifiedAt: DateTime @1754517600 {#7317
      date: 2025-08-07 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1627250400 {#7292
      date: 2021-07-26 00:00:00.0 Europe/Paris (+02:00)
    }
    -author: ""
    -publishedAt: DateTime @1616108400 {#7318
      date: 2021-03-19 00:00:00.0 Europe/Paris (+01:00)
    }
    -releasedAt: null
    -confirmedAt: null
    -canceledAt: null
    -edition: null
    -coreDocument: "1427"
    -bookCollection: ""
    -pageCount: 51
    -documents: Doctrine\ORM\PersistentCollection {#7464 …}
    -favorites: Doctrine\ORM\PersistentCollection {#7499 …}
  }
  +label: "Standard"
  -typeAttributeCode: "type"
  -localeContext: Sylius\Component\Locale\Context\CompositeLocaleContext {#1833 …}
}
ProductMostRecent App\Twig\Components\ProductMostRecent 262.0 MiB 0.82 ms
Input props
[
  "product" => App\Entity\Product\Product {#7310
    #id: 11503
    #code: "IEEE00006231"
    #attributes: Doctrine\ORM\PersistentCollection {#7700 …}
    #variants: Doctrine\ORM\PersistentCollection {#7743 …}
    #options: Doctrine\ORM\PersistentCollection {#7915 …}
    #associations: Doctrine\ORM\PersistentCollection {#7899 …}
    #createdAt: DateTime @1751039748 {#7274
      date: 2025-06-27 17:55:48.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1754608621 {#7322
      date: 2025-08-08 01:17:01.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#7921 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#7920
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#7310}
        #id: 41021
        #name: "IEEE 1427:2020"
        #slug: "ieee-1427-2020-ieee00006231-243155"
        #description: """
          Revision Standard - Active.<br />\n
          This guide, covering three-phase ac systems from 1 kV to 800 kV, provides recommended electrical operating, safety clearances, and insulation levels in air-insulated electric supply substations; addresses insulation coordination procedures; provides design procedures for the selection and coordination of the insulation levels within the station as they relate to substation clearances; and addresses how reduced clearances in high-voltage ac substations will allow for compact bus arrangements and substation voltage uprating applications.<br />\n
          \t\t\t\t<br />\n
          This guide, covering three-phase ac systems from 1 kV to 800 kV, provides recommended electrical operating, safety clearances, and insulation levels in air-insulated electric supply substations; addresses insulation coordination procedures; provides design procedures for the selection and coordination of the insulation levels within the station as they relate to substation clearances; and addresses how reduced clearances in highvoltage ac substations will allow for compact bus arrangements and substation voltage uprating applications. This guide addresses insulation coordination procedures, including the choice of insulation levels and arrester specification, in limited detail and only as relevant to clearance requirements. Detailed and expanded coverage of insulation coordination procedures is provided in other ANSI and IEEE guides and standards (see Clause 2). This guide focuses on open-air bus assemblies and configurations and excludes apparatus clearances (i.e., bushing clearances for transformers, and breakers). Detailed coverage of apparatus clearances is provided in other applicable guides and standards.<br />\n
          Proper electrical clearances are necessary for the design, construction, and operation of electric supply substations. This document develops guidelines for the application of recommended electrical clearances and insulation levels in air-insulated substations. The recommended clearances incorporate both design/operating clearances and safety clearances.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for Recommended Electrical Clearances and Insulation Levels in Air Insulated Electrical Power Substations"
        -notes: "Active"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#7533 …}
    #channels: Doctrine\ORM\PersistentCollection {#7627 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7311 …}
    #reviews: Doctrine\ORM\PersistentCollection {#7612 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#7644 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7325 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#7389 …}
    -apiLastModifiedAt: DateTime @1754517600 {#7317
      date: 2025-08-07 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1627250400 {#7292
      date: 2021-07-26 00:00:00.0 Europe/Paris (+02:00)
    }
    -author: ""
    -publishedAt: DateTime @1616108400 {#7318
      date: 2021-03-19 00:00:00.0 Europe/Paris (+01:00)
    }
    -releasedAt: null
    -confirmedAt: null
    -canceledAt: null
    -edition: null
    -coreDocument: "1427"
    -bookCollection: ""
    -pageCount: 51
    -documents: Doctrine\ORM\PersistentCollection {#7464 …}
    -favorites: Doctrine\ORM\PersistentCollection {#7499 …}
  }
]
Attributes
[]
Component
App\Twig\Components\ProductMostRecent {#93368
  +product: App\Entity\Product\Product {#7310
    #id: 11503
    #code: "IEEE00006231"
    #attributes: Doctrine\ORM\PersistentCollection {#7700 …}
    #variants: Doctrine\ORM\PersistentCollection {#7743 …}
    #options: Doctrine\ORM\PersistentCollection {#7915 …}
    #associations: Doctrine\ORM\PersistentCollection {#7899 …}
    #createdAt: DateTime @1751039748 {#7274
      date: 2025-06-27 17:55:48.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1754608621 {#7322
      date: 2025-08-08 01:17:01.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#7921 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#7920
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#7310}
        #id: 41021
        #name: "IEEE 1427:2020"
        #slug: "ieee-1427-2020-ieee00006231-243155"
        #description: """
          Revision Standard - Active.<br />\n
          This guide, covering three-phase ac systems from 1 kV to 800 kV, provides recommended electrical operating, safety clearances, and insulation levels in air-insulated electric supply substations; addresses insulation coordination procedures; provides design procedures for the selection and coordination of the insulation levels within the station as they relate to substation clearances; and addresses how reduced clearances in high-voltage ac substations will allow for compact bus arrangements and substation voltage uprating applications.<br />\n
          \t\t\t\t<br />\n
          This guide, covering three-phase ac systems from 1 kV to 800 kV, provides recommended electrical operating, safety clearances, and insulation levels in air-insulated electric supply substations; addresses insulation coordination procedures; provides design procedures for the selection and coordination of the insulation levels within the station as they relate to substation clearances; and addresses how reduced clearances in highvoltage ac substations will allow for compact bus arrangements and substation voltage uprating applications. This guide addresses insulation coordination procedures, including the choice of insulation levels and arrester specification, in limited detail and only as relevant to clearance requirements. Detailed and expanded coverage of insulation coordination procedures is provided in other ANSI and IEEE guides and standards (see Clause 2). This guide focuses on open-air bus assemblies and configurations and excludes apparatus clearances (i.e., bushing clearances for transformers, and breakers). Detailed coverage of apparatus clearances is provided in other applicable guides and standards.<br />\n
          Proper electrical clearances are necessary for the design, construction, and operation of electric supply substations. This document develops guidelines for the application of recommended electrical clearances and insulation levels in air-insulated substations. The recommended clearances incorporate both design/operating clearances and safety clearances.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for Recommended Electrical Clearances and Insulation Levels in Air Insulated Electrical Power Substations"
        -notes: "Active"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#7533 …}
    #channels: Doctrine\ORM\PersistentCollection {#7627 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7311 …}
    #reviews: Doctrine\ORM\PersistentCollection {#7612 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#7644 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7325 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#7389 …}
    -apiLastModifiedAt: DateTime @1754517600 {#7317
      date: 2025-08-07 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1627250400 {#7292
      date: 2021-07-26 00:00:00.0 Europe/Paris (+02:00)
    }
    -author: ""
    -publishedAt: DateTime @1616108400 {#7318
      date: 2021-03-19 00:00:00.0 Europe/Paris (+01:00)
    }
    -releasedAt: null
    -confirmedAt: null
    -canceledAt: null
    -edition: null
    -coreDocument: "1427"
    -bookCollection: ""
    -pageCount: 51
    -documents: Doctrine\ORM\PersistentCollection {#7464 …}
    -favorites: Doctrine\ORM\PersistentCollection {#7499 …}
  }
  +label: "Most Recent"
  +icon: "check-xs"
  -mostRecentAttributeCode: "most_recent"
  -localeContext: Sylius\Component\Locale\Context\CompositeLocaleContext {#1833 …}
}
ProductState App\Twig\Components\ProductState 262.0 MiB 0.20 ms
Input props
[
  "product" => App\Entity\Product\Product {#100380
    #id: 9354
    #code: "IEEE00002134"
    #attributes: Doctrine\ORM\PersistentCollection {#100361 …}
    #variants: Doctrine\ORM\PersistentCollection {#100358 …}
    #options: Doctrine\ORM\PersistentCollection {#100354 …}
    #associations: Doctrine\ORM\PersistentCollection {#100356 …}
    #createdAt: DateTime @1751038194 {#100387
      date: 2025-06-27 17:29:54.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1754607004 {#100360
      date: 2025-08-08 00:50:04.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#100371 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#100398
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#100380}
        #id: 32425
        #name: "IEEE 1427:2006"
        #slug: "ieee-1427-2006-ieee00002134-241006"
        #description: """
          New IEEE Standard - Superseded.<br />\n
          This guide, covering three-phase ac systems from 1 kV to 800 kV, provides recommended electrical operating and safety clearances and insulation levels in air-insulated electric supply substations; addresses insulation coordination procedures; provides design procedures for the selection and coordination of the insulation levels within the station as they relate to substation clearances; and addresses how reduced clearances in high-voltage ac substations will allow for compact bus arrangements and substation voltage uprating applications.<br />\n
          \t\t\t\t<br />\n
          This guide, covering three-phase ac systems from 1 kV to 800 kV, provides recommended electrical operating and safety clearances and insulation levels in air-insulated electric supply substations; addresses insulation coordination procedures; provides design procedures for the selection and coordination of the insulation levels within the station as they relate to substation clearances; and addresses how reduced clearances in high-voltage ac substations will allow for compact bus arrangements and substation voltage uprating applications. This guide addresses insulation coordination procedures, including the choice of insulation levels and arrester specification, in limited detail and only as relevant to clearance requirements. Detailed and expanded coverage of insulation coordination procedures is provided in other ANSI and IEEE guides and standards (see Clause 2). This guide focuses on open-air bus assemblies and configurations and excludes apparatus clearances (i.e., bushing clearances for transformers, and breakers). Detailed coverage of apparatus clearances is provided in other applicable guides and standards.<br />\n
          Proper electrical clearances are necessary for the design, construction, and operation of electric supply substations. This document develops guidelines for the application of recommended electrical clearances and insulation levels in air-insulated substations. The recommended clearances incorporate both design/operating clearances and safety clearances.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for Recommended Electrical Clearances and Insulation Levels in Air Insulated Electrical Power Substations"
        -notes: "Superseded"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#100369 …}
    #channels: Doctrine\ORM\PersistentCollection {#100363 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7311 …}
    #reviews: Doctrine\ORM\PersistentCollection {#100367 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#100365 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7325 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#100378 …}
    -apiLastModifiedAt: DateTime @1754517600 {#100347
      date: 2025-08-07 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1692136800 {#100386
      date: 2023-08-16 00:00:00.0 Europe/Paris (+02:00)
    }
    -author: ""
    -publishedAt: DateTime @1178229600 {#100385
      date: 2007-05-04 00:00:00.0 Europe/Paris (+02:00)
    }
    -releasedAt: null
    -confirmedAt: null
    -canceledAt: DateTime @1178229600 {#100379
      date: 2007-05-04 00:00:00.0 Europe/Paris (+02:00)
    }
    -edition: null
    -coreDocument: "1427"
    -bookCollection: ""
    -pageCount: 50
    -documents: Doctrine\ORM\PersistentCollection {#100376 …}
    -favorites: Doctrine\ORM\PersistentCollection {#100374 …}
  }
  "showFullLabel" => "true"
]
Attributes
[
  "showFullLabel" => "true"
]
Component
App\Twig\Components\ProductState {#100434
  +product: App\Entity\Product\Product {#100380
    #id: 9354
    #code: "IEEE00002134"
    #attributes: Doctrine\ORM\PersistentCollection {#100361 …}
    #variants: Doctrine\ORM\PersistentCollection {#100358 …}
    #options: Doctrine\ORM\PersistentCollection {#100354 …}
    #associations: Doctrine\ORM\PersistentCollection {#100356 …}
    #createdAt: DateTime @1751038194 {#100387
      date: 2025-06-27 17:29:54.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1754607004 {#100360
      date: 2025-08-08 00:50:04.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#100371 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#100398
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#100380}
        #id: 32425
        #name: "IEEE 1427:2006"
        #slug: "ieee-1427-2006-ieee00002134-241006"
        #description: """
          New IEEE Standard - Superseded.<br />\n
          This guide, covering three-phase ac systems from 1 kV to 800 kV, provides recommended electrical operating and safety clearances and insulation levels in air-insulated electric supply substations; addresses insulation coordination procedures; provides design procedures for the selection and coordination of the insulation levels within the station as they relate to substation clearances; and addresses how reduced clearances in high-voltage ac substations will allow for compact bus arrangements and substation voltage uprating applications.<br />\n
          \t\t\t\t<br />\n
          This guide, covering three-phase ac systems from 1 kV to 800 kV, provides recommended electrical operating and safety clearances and insulation levels in air-insulated electric supply substations; addresses insulation coordination procedures; provides design procedures for the selection and coordination of the insulation levels within the station as they relate to substation clearances; and addresses how reduced clearances in high-voltage ac substations will allow for compact bus arrangements and substation voltage uprating applications. This guide addresses insulation coordination procedures, including the choice of insulation levels and arrester specification, in limited detail and only as relevant to clearance requirements. Detailed and expanded coverage of insulation coordination procedures is provided in other ANSI and IEEE guides and standards (see Clause 2). This guide focuses on open-air bus assemblies and configurations and excludes apparatus clearances (i.e., bushing clearances for transformers, and breakers). Detailed coverage of apparatus clearances is provided in other applicable guides and standards.<br />\n
          Proper electrical clearances are necessary for the design, construction, and operation of electric supply substations. This document develops guidelines for the application of recommended electrical clearances and insulation levels in air-insulated substations. The recommended clearances incorporate both design/operating clearances and safety clearances.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for Recommended Electrical Clearances and Insulation Levels in Air Insulated Electrical Power Substations"
        -notes: "Superseded"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#100369 …}
    #channels: Doctrine\ORM\PersistentCollection {#100363 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7311 …}
    #reviews: Doctrine\ORM\PersistentCollection {#100367 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#100365 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7325 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#100378 …}
    -apiLastModifiedAt: DateTime @1754517600 {#100347
      date: 2025-08-07 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1692136800 {#100386
      date: 2023-08-16 00:00:00.0 Europe/Paris (+02:00)
    }
    -author: ""
    -publishedAt: DateTime @1178229600 {#100385
      date: 2007-05-04 00:00:00.0 Europe/Paris (+02:00)
    }
    -releasedAt: null
    -confirmedAt: null
    -canceledAt: DateTime @1178229600 {#100379
      date: 2007-05-04 00:00:00.0 Europe/Paris (+02:00)
    }
    -edition: null
    -coreDocument: "1427"
    -bookCollection: ""
    -pageCount: 50
    -documents: Doctrine\ORM\PersistentCollection {#100376 …}
    -favorites: Doctrine\ORM\PersistentCollection {#100374 …}
  }
  +appearance: "state-suspended"
  +labels: [
    "Superseded"
  ]
  -stateAttributeCode: "state"
  -localeContext: Sylius\Component\Locale\Context\CompositeLocaleContext {#1833 …}
}
ProductMostRecent App\Twig\Components\ProductMostRecent 262.0 MiB 0.76 ms
Input props
[
  "product" => App\Entity\Product\Product {#100380
    #id: 9354
    #code: "IEEE00002134"
    #attributes: Doctrine\ORM\PersistentCollection {#100361 …}
    #variants: Doctrine\ORM\PersistentCollection {#100358 …}
    #options: Doctrine\ORM\PersistentCollection {#100354 …}
    #associations: Doctrine\ORM\PersistentCollection {#100356 …}
    #createdAt: DateTime @1751038194 {#100387
      date: 2025-06-27 17:29:54.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1754607004 {#100360
      date: 2025-08-08 00:50:04.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#100371 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#100398
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#100380}
        #id: 32425
        #name: "IEEE 1427:2006"
        #slug: "ieee-1427-2006-ieee00002134-241006"
        #description: """
          New IEEE Standard - Superseded.<br />\n
          This guide, covering three-phase ac systems from 1 kV to 800 kV, provides recommended electrical operating and safety clearances and insulation levels in air-insulated electric supply substations; addresses insulation coordination procedures; provides design procedures for the selection and coordination of the insulation levels within the station as they relate to substation clearances; and addresses how reduced clearances in high-voltage ac substations will allow for compact bus arrangements and substation voltage uprating applications.<br />\n
          \t\t\t\t<br />\n
          This guide, covering three-phase ac systems from 1 kV to 800 kV, provides recommended electrical operating and safety clearances and insulation levels in air-insulated electric supply substations; addresses insulation coordination procedures; provides design procedures for the selection and coordination of the insulation levels within the station as they relate to substation clearances; and addresses how reduced clearances in high-voltage ac substations will allow for compact bus arrangements and substation voltage uprating applications. This guide addresses insulation coordination procedures, including the choice of insulation levels and arrester specification, in limited detail and only as relevant to clearance requirements. Detailed and expanded coverage of insulation coordination procedures is provided in other ANSI and IEEE guides and standards (see Clause 2). This guide focuses on open-air bus assemblies and configurations and excludes apparatus clearances (i.e., bushing clearances for transformers, and breakers). Detailed coverage of apparatus clearances is provided in other applicable guides and standards.<br />\n
          Proper electrical clearances are necessary for the design, construction, and operation of electric supply substations. This document develops guidelines for the application of recommended electrical clearances and insulation levels in air-insulated substations. The recommended clearances incorporate both design/operating clearances and safety clearances.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for Recommended Electrical Clearances and Insulation Levels in Air Insulated Electrical Power Substations"
        -notes: "Superseded"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#100369 …}
    #channels: Doctrine\ORM\PersistentCollection {#100363 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7311 …}
    #reviews: Doctrine\ORM\PersistentCollection {#100367 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#100365 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7325 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#100378 …}
    -apiLastModifiedAt: DateTime @1754517600 {#100347
      date: 2025-08-07 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1692136800 {#100386
      date: 2023-08-16 00:00:00.0 Europe/Paris (+02:00)
    }
    -author: ""
    -publishedAt: DateTime @1178229600 {#100385
      date: 2007-05-04 00:00:00.0 Europe/Paris (+02:00)
    }
    -releasedAt: null
    -confirmedAt: null
    -canceledAt: DateTime @1178229600 {#100379
      date: 2007-05-04 00:00:00.0 Europe/Paris (+02:00)
    }
    -edition: null
    -coreDocument: "1427"
    -bookCollection: ""
    -pageCount: 50
    -documents: Doctrine\ORM\PersistentCollection {#100376 …}
    -favorites: Doctrine\ORM\PersistentCollection {#100374 …}
  }
]
Attributes
[]
Component
App\Twig\Components\ProductMostRecent {#100501
  +product: App\Entity\Product\Product {#100380
    #id: 9354
    #code: "IEEE00002134"
    #attributes: Doctrine\ORM\PersistentCollection {#100361 …}
    #variants: Doctrine\ORM\PersistentCollection {#100358 …}
    #options: Doctrine\ORM\PersistentCollection {#100354 …}
    #associations: Doctrine\ORM\PersistentCollection {#100356 …}
    #createdAt: DateTime @1751038194 {#100387
      date: 2025-06-27 17:29:54.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1754607004 {#100360
      date: 2025-08-08 00:50:04.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#100371 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#100398
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#100380}
        #id: 32425
        #name: "IEEE 1427:2006"
        #slug: "ieee-1427-2006-ieee00002134-241006"
        #description: """
          New IEEE Standard - Superseded.<br />\n
          This guide, covering three-phase ac systems from 1 kV to 800 kV, provides recommended electrical operating and safety clearances and insulation levels in air-insulated electric supply substations; addresses insulation coordination procedures; provides design procedures for the selection and coordination of the insulation levels within the station as they relate to substation clearances; and addresses how reduced clearances in high-voltage ac substations will allow for compact bus arrangements and substation voltage uprating applications.<br />\n
          \t\t\t\t<br />\n
          This guide, covering three-phase ac systems from 1 kV to 800 kV, provides recommended electrical operating and safety clearances and insulation levels in air-insulated electric supply substations; addresses insulation coordination procedures; provides design procedures for the selection and coordination of the insulation levels within the station as they relate to substation clearances; and addresses how reduced clearances in high-voltage ac substations will allow for compact bus arrangements and substation voltage uprating applications. This guide addresses insulation coordination procedures, including the choice of insulation levels and arrester specification, in limited detail and only as relevant to clearance requirements. Detailed and expanded coverage of insulation coordination procedures is provided in other ANSI and IEEE guides and standards (see Clause 2). This guide focuses on open-air bus assemblies and configurations and excludes apparatus clearances (i.e., bushing clearances for transformers, and breakers). Detailed coverage of apparatus clearances is provided in other applicable guides and standards.<br />\n
          Proper electrical clearances are necessary for the design, construction, and operation of electric supply substations. This document develops guidelines for the application of recommended electrical clearances and insulation levels in air-insulated substations. The recommended clearances incorporate both design/operating clearances and safety clearances.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for Recommended Electrical Clearances and Insulation Levels in Air Insulated Electrical Power Substations"
        -notes: "Superseded"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#100369 …}
    #channels: Doctrine\ORM\PersistentCollection {#100363 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7311 …}
    #reviews: Doctrine\ORM\PersistentCollection {#100367 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#100365 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7325 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#100378 …}
    -apiLastModifiedAt: DateTime @1754517600 {#100347
      date: 2025-08-07 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1692136800 {#100386
      date: 2023-08-16 00:00:00.0 Europe/Paris (+02:00)
    }
    -author: ""
    -publishedAt: DateTime @1178229600 {#100385
      date: 2007-05-04 00:00:00.0 Europe/Paris (+02:00)
    }
    -releasedAt: null
    -confirmedAt: null
    -canceledAt: DateTime @1178229600 {#100379
      date: 2007-05-04 00:00:00.0 Europe/Paris (+02:00)
    }
    -edition: null
    -coreDocument: "1427"
    -bookCollection: ""
    -pageCount: 50
    -documents: Doctrine\ORM\PersistentCollection {#100376 …}
    -favorites: Doctrine\ORM\PersistentCollection {#100374 …}
  }
  +label: "Historical"
  +icon: "historical"
  -mostRecentAttributeCode: "most_recent"
  -localeContext: Sylius\Component\Locale\Context\CompositeLocaleContext {#1833 …}
}
ProductState App\Twig\Components\ProductState 262.0 MiB 0.20 ms
Input props
[
  "product" => App\Entity\Product\Product {#7310
    #id: 11503
    #code: "IEEE00006231"
    #attributes: Doctrine\ORM\PersistentCollection {#7700 …}
    #variants: Doctrine\ORM\PersistentCollection {#7743 …}
    #options: Doctrine\ORM\PersistentCollection {#7915 …}
    #associations: Doctrine\ORM\PersistentCollection {#7899 …}
    #createdAt: DateTime @1751039748 {#7274
      date: 2025-06-27 17:55:48.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1754608621 {#7322
      date: 2025-08-08 01:17:01.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#7921 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#7920
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#7310}
        #id: 41021
        #name: "IEEE 1427:2020"
        #slug: "ieee-1427-2020-ieee00006231-243155"
        #description: """
          Revision Standard - Active.<br />\n
          This guide, covering three-phase ac systems from 1 kV to 800 kV, provides recommended electrical operating, safety clearances, and insulation levels in air-insulated electric supply substations; addresses insulation coordination procedures; provides design procedures for the selection and coordination of the insulation levels within the station as they relate to substation clearances; and addresses how reduced clearances in high-voltage ac substations will allow for compact bus arrangements and substation voltage uprating applications.<br />\n
          \t\t\t\t<br />\n
          This guide, covering three-phase ac systems from 1 kV to 800 kV, provides recommended electrical operating, safety clearances, and insulation levels in air-insulated electric supply substations; addresses insulation coordination procedures; provides design procedures for the selection and coordination of the insulation levels within the station as they relate to substation clearances; and addresses how reduced clearances in highvoltage ac substations will allow for compact bus arrangements and substation voltage uprating applications. This guide addresses insulation coordination procedures, including the choice of insulation levels and arrester specification, in limited detail and only as relevant to clearance requirements. Detailed and expanded coverage of insulation coordination procedures is provided in other ANSI and IEEE guides and standards (see Clause 2). This guide focuses on open-air bus assemblies and configurations and excludes apparatus clearances (i.e., bushing clearances for transformers, and breakers). Detailed coverage of apparatus clearances is provided in other applicable guides and standards.<br />\n
          Proper electrical clearances are necessary for the design, construction, and operation of electric supply substations. This document develops guidelines for the application of recommended electrical clearances and insulation levels in air-insulated substations. The recommended clearances incorporate both design/operating clearances and safety clearances.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for Recommended Electrical Clearances and Insulation Levels in Air Insulated Electrical Power Substations"
        -notes: "Active"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#7533 …}
    #channels: Doctrine\ORM\PersistentCollection {#7627 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7311 …}
    #reviews: Doctrine\ORM\PersistentCollection {#7612 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#7644 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7325 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#7389 …}
    -apiLastModifiedAt: DateTime @1754517600 {#7317
      date: 2025-08-07 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1627250400 {#7292
      date: 2021-07-26 00:00:00.0 Europe/Paris (+02:00)
    }
    -author: ""
    -publishedAt: DateTime @1616108400 {#7318
      date: 2021-03-19 00:00:00.0 Europe/Paris (+01:00)
    }
    -releasedAt: null
    -confirmedAt: null
    -canceledAt: null
    -edition: null
    -coreDocument: "1427"
    -bookCollection: ""
    -pageCount: 51
    -documents: Doctrine\ORM\PersistentCollection {#7464 …}
    -favorites: Doctrine\ORM\PersistentCollection {#7499 …}
  }
  "showFullLabel" => "true"
]
Attributes
[
  "showFullLabel" => "true"
]
Component
App\Twig\Components\ProductState {#107095
  +product: App\Entity\Product\Product {#7310
    #id: 11503
    #code: "IEEE00006231"
    #attributes: Doctrine\ORM\PersistentCollection {#7700 …}
    #variants: Doctrine\ORM\PersistentCollection {#7743 …}
    #options: Doctrine\ORM\PersistentCollection {#7915 …}
    #associations: Doctrine\ORM\PersistentCollection {#7899 …}
    #createdAt: DateTime @1751039748 {#7274
      date: 2025-06-27 17:55:48.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1754608621 {#7322
      date: 2025-08-08 01:17:01.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#7921 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#7920
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#7310}
        #id: 41021
        #name: "IEEE 1427:2020"
        #slug: "ieee-1427-2020-ieee00006231-243155"
        #description: """
          Revision Standard - Active.<br />\n
          This guide, covering three-phase ac systems from 1 kV to 800 kV, provides recommended electrical operating, safety clearances, and insulation levels in air-insulated electric supply substations; addresses insulation coordination procedures; provides design procedures for the selection and coordination of the insulation levels within the station as they relate to substation clearances; and addresses how reduced clearances in high-voltage ac substations will allow for compact bus arrangements and substation voltage uprating applications.<br />\n
          \t\t\t\t<br />\n
          This guide, covering three-phase ac systems from 1 kV to 800 kV, provides recommended electrical operating, safety clearances, and insulation levels in air-insulated electric supply substations; addresses insulation coordination procedures; provides design procedures for the selection and coordination of the insulation levels within the station as they relate to substation clearances; and addresses how reduced clearances in highvoltage ac substations will allow for compact bus arrangements and substation voltage uprating applications. This guide addresses insulation coordination procedures, including the choice of insulation levels and arrester specification, in limited detail and only as relevant to clearance requirements. Detailed and expanded coverage of insulation coordination procedures is provided in other ANSI and IEEE guides and standards (see Clause 2). This guide focuses on open-air bus assemblies and configurations and excludes apparatus clearances (i.e., bushing clearances for transformers, and breakers). Detailed coverage of apparatus clearances is provided in other applicable guides and standards.<br />\n
          Proper electrical clearances are necessary for the design, construction, and operation of electric supply substations. This document develops guidelines for the application of recommended electrical clearances and insulation levels in air-insulated substations. The recommended clearances incorporate both design/operating clearances and safety clearances.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for Recommended Electrical Clearances and Insulation Levels in Air Insulated Electrical Power Substations"
        -notes: "Active"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#7533 …}
    #channels: Doctrine\ORM\PersistentCollection {#7627 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7311 …}
    #reviews: Doctrine\ORM\PersistentCollection {#7612 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#7644 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7325 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#7389 …}
    -apiLastModifiedAt: DateTime @1754517600 {#7317
      date: 2025-08-07 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1627250400 {#7292
      date: 2021-07-26 00:00:00.0 Europe/Paris (+02:00)
    }
    -author: ""
    -publishedAt: DateTime @1616108400 {#7318
      date: 2021-03-19 00:00:00.0 Europe/Paris (+01:00)
    }
    -releasedAt: null
    -confirmedAt: null
    -canceledAt: null
    -edition: null
    -coreDocument: "1427"
    -bookCollection: ""
    -pageCount: 51
    -documents: Doctrine\ORM\PersistentCollection {#7464 …}
    -favorites: Doctrine\ORM\PersistentCollection {#7499 …}
  }
  +appearance: "state-active"
  +labels: [
    "Active"
  ]
  -stateAttributeCode: "state"
  -localeContext: Sylius\Component\Locale\Context\CompositeLocaleContext {#1833 …}
}
ProductMostRecent App\Twig\Components\ProductMostRecent 262.0 MiB 0.72 ms
Input props
[
  "product" => App\Entity\Product\Product {#7310
    #id: 11503
    #code: "IEEE00006231"
    #attributes: Doctrine\ORM\PersistentCollection {#7700 …}
    #variants: Doctrine\ORM\PersistentCollection {#7743 …}
    #options: Doctrine\ORM\PersistentCollection {#7915 …}
    #associations: Doctrine\ORM\PersistentCollection {#7899 …}
    #createdAt: DateTime @1751039748 {#7274
      date: 2025-06-27 17:55:48.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1754608621 {#7322
      date: 2025-08-08 01:17:01.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#7921 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#7920
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#7310}
        #id: 41021
        #name: "IEEE 1427:2020"
        #slug: "ieee-1427-2020-ieee00006231-243155"
        #description: """
          Revision Standard - Active.<br />\n
          This guide, covering three-phase ac systems from 1 kV to 800 kV, provides recommended electrical operating, safety clearances, and insulation levels in air-insulated electric supply substations; addresses insulation coordination procedures; provides design procedures for the selection and coordination of the insulation levels within the station as they relate to substation clearances; and addresses how reduced clearances in high-voltage ac substations will allow for compact bus arrangements and substation voltage uprating applications.<br />\n
          \t\t\t\t<br />\n
          This guide, covering three-phase ac systems from 1 kV to 800 kV, provides recommended electrical operating, safety clearances, and insulation levels in air-insulated electric supply substations; addresses insulation coordination procedures; provides design procedures for the selection and coordination of the insulation levels within the station as they relate to substation clearances; and addresses how reduced clearances in highvoltage ac substations will allow for compact bus arrangements and substation voltage uprating applications. This guide addresses insulation coordination procedures, including the choice of insulation levels and arrester specification, in limited detail and only as relevant to clearance requirements. Detailed and expanded coverage of insulation coordination procedures is provided in other ANSI and IEEE guides and standards (see Clause 2). This guide focuses on open-air bus assemblies and configurations and excludes apparatus clearances (i.e., bushing clearances for transformers, and breakers). Detailed coverage of apparatus clearances is provided in other applicable guides and standards.<br />\n
          Proper electrical clearances are necessary for the design, construction, and operation of electric supply substations. This document develops guidelines for the application of recommended electrical clearances and insulation levels in air-insulated substations. The recommended clearances incorporate both design/operating clearances and safety clearances.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for Recommended Electrical Clearances and Insulation Levels in Air Insulated Electrical Power Substations"
        -notes: "Active"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#7533 …}
    #channels: Doctrine\ORM\PersistentCollection {#7627 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7311 …}
    #reviews: Doctrine\ORM\PersistentCollection {#7612 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#7644 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7325 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#7389 …}
    -apiLastModifiedAt: DateTime @1754517600 {#7317
      date: 2025-08-07 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1627250400 {#7292
      date: 2021-07-26 00:00:00.0 Europe/Paris (+02:00)
    }
    -author: ""
    -publishedAt: DateTime @1616108400 {#7318
      date: 2021-03-19 00:00:00.0 Europe/Paris (+01:00)
    }
    -releasedAt: null
    -confirmedAt: null
    -canceledAt: null
    -edition: null
    -coreDocument: "1427"
    -bookCollection: ""
    -pageCount: 51
    -documents: Doctrine\ORM\PersistentCollection {#7464 …}
    -favorites: Doctrine\ORM\PersistentCollection {#7499 …}
  }
]
Attributes
[]
Component
App\Twig\Components\ProductMostRecent {#107137
  +product: App\Entity\Product\Product {#7310
    #id: 11503
    #code: "IEEE00006231"
    #attributes: Doctrine\ORM\PersistentCollection {#7700 …}
    #variants: Doctrine\ORM\PersistentCollection {#7743 …}
    #options: Doctrine\ORM\PersistentCollection {#7915 …}
    #associations: Doctrine\ORM\PersistentCollection {#7899 …}
    #createdAt: DateTime @1751039748 {#7274
      date: 2025-06-27 17:55:48.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1754608621 {#7322
      date: 2025-08-08 01:17:01.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#7921 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#7920
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#7310}
        #id: 41021
        #name: "IEEE 1427:2020"
        #slug: "ieee-1427-2020-ieee00006231-243155"
        #description: """
          Revision Standard - Active.<br />\n
          This guide, covering three-phase ac systems from 1 kV to 800 kV, provides recommended electrical operating, safety clearances, and insulation levels in air-insulated electric supply substations; addresses insulation coordination procedures; provides design procedures for the selection and coordination of the insulation levels within the station as they relate to substation clearances; and addresses how reduced clearances in high-voltage ac substations will allow for compact bus arrangements and substation voltage uprating applications.<br />\n
          \t\t\t\t<br />\n
          This guide, covering three-phase ac systems from 1 kV to 800 kV, provides recommended electrical operating, safety clearances, and insulation levels in air-insulated electric supply substations; addresses insulation coordination procedures; provides design procedures for the selection and coordination of the insulation levels within the station as they relate to substation clearances; and addresses how reduced clearances in highvoltage ac substations will allow for compact bus arrangements and substation voltage uprating applications. This guide addresses insulation coordination procedures, including the choice of insulation levels and arrester specification, in limited detail and only as relevant to clearance requirements. Detailed and expanded coverage of insulation coordination procedures is provided in other ANSI and IEEE guides and standards (see Clause 2). This guide focuses on open-air bus assemblies and configurations and excludes apparatus clearances (i.e., bushing clearances for transformers, and breakers). Detailed coverage of apparatus clearances is provided in other applicable guides and standards.<br />\n
          Proper electrical clearances are necessary for the design, construction, and operation of electric supply substations. This document develops guidelines for the application of recommended electrical clearances and insulation levels in air-insulated substations. The recommended clearances incorporate both design/operating clearances and safety clearances.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for Recommended Electrical Clearances and Insulation Levels in Air Insulated Electrical Power Substations"
        -notes: "Active"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#7533 …}
    #channels: Doctrine\ORM\PersistentCollection {#7627 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7311 …}
    #reviews: Doctrine\ORM\PersistentCollection {#7612 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#7644 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7325 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#7389 …}
    -apiLastModifiedAt: DateTime @1754517600 {#7317
      date: 2025-08-07 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1627250400 {#7292
      date: 2021-07-26 00:00:00.0 Europe/Paris (+02:00)
    }
    -author: ""
    -publishedAt: DateTime @1616108400 {#7318
      date: 2021-03-19 00:00:00.0 Europe/Paris (+01:00)
    }
    -releasedAt: null
    -confirmedAt: null
    -canceledAt: null
    -edition: null
    -coreDocument: "1427"
    -bookCollection: ""
    -pageCount: 51
    -documents: Doctrine\ORM\PersistentCollection {#7464 …}
    -favorites: Doctrine\ORM\PersistentCollection {#7499 …}
  }
  +label: "Most Recent"
  +icon: "check-xs"
  -mostRecentAttributeCode: "most_recent"
  -localeContext: Sylius\Component\Locale\Context\CompositeLocaleContext {#1833 …}
}
ProductState App\Twig\Components\ProductState 262.0 MiB 0.17 ms
Input props
[
  "product" => App\Entity\Product\Product {#100380
    #id: 9354
    #code: "IEEE00002134"
    #attributes: Doctrine\ORM\PersistentCollection {#100361 …}
    #variants: Doctrine\ORM\PersistentCollection {#100358 …}
    #options: Doctrine\ORM\PersistentCollection {#100354 …}
    #associations: Doctrine\ORM\PersistentCollection {#100356 …}
    #createdAt: DateTime @1751038194 {#100387
      date: 2025-06-27 17:29:54.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1754607004 {#100360
      date: 2025-08-08 00:50:04.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#100371 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#100398
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#100380}
        #id: 32425
        #name: "IEEE 1427:2006"
        #slug: "ieee-1427-2006-ieee00002134-241006"
        #description: """
          New IEEE Standard - Superseded.<br />\n
          This guide, covering three-phase ac systems from 1 kV to 800 kV, provides recommended electrical operating and safety clearances and insulation levels in air-insulated electric supply substations; addresses insulation coordination procedures; provides design procedures for the selection and coordination of the insulation levels within the station as they relate to substation clearances; and addresses how reduced clearances in high-voltage ac substations will allow for compact bus arrangements and substation voltage uprating applications.<br />\n
          \t\t\t\t<br />\n
          This guide, covering three-phase ac systems from 1 kV to 800 kV, provides recommended electrical operating and safety clearances and insulation levels in air-insulated electric supply substations; addresses insulation coordination procedures; provides design procedures for the selection and coordination of the insulation levels within the station as they relate to substation clearances; and addresses how reduced clearances in high-voltage ac substations will allow for compact bus arrangements and substation voltage uprating applications. This guide addresses insulation coordination procedures, including the choice of insulation levels and arrester specification, in limited detail and only as relevant to clearance requirements. Detailed and expanded coverage of insulation coordination procedures is provided in other ANSI and IEEE guides and standards (see Clause 2). This guide focuses on open-air bus assemblies and configurations and excludes apparatus clearances (i.e., bushing clearances for transformers, and breakers). Detailed coverage of apparatus clearances is provided in other applicable guides and standards.<br />\n
          Proper electrical clearances are necessary for the design, construction, and operation of electric supply substations. This document develops guidelines for the application of recommended electrical clearances and insulation levels in air-insulated substations. The recommended clearances incorporate both design/operating clearances and safety clearances.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for Recommended Electrical Clearances and Insulation Levels in Air Insulated Electrical Power Substations"
        -notes: "Superseded"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#100369 …}
    #channels: Doctrine\ORM\PersistentCollection {#100363 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7311 …}
    #reviews: Doctrine\ORM\PersistentCollection {#100367 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#100365 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7325 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#100378 …}
    -apiLastModifiedAt: DateTime @1754517600 {#100347
      date: 2025-08-07 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1692136800 {#100386
      date: 2023-08-16 00:00:00.0 Europe/Paris (+02:00)
    }
    -author: ""
    -publishedAt: DateTime @1178229600 {#100385
      date: 2007-05-04 00:00:00.0 Europe/Paris (+02:00)
    }
    -releasedAt: null
    -confirmedAt: null
    -canceledAt: DateTime @1178229600 {#100379
      date: 2007-05-04 00:00:00.0 Europe/Paris (+02:00)
    }
    -edition: null
    -coreDocument: "1427"
    -bookCollection: ""
    -pageCount: 50
    -documents: Doctrine\ORM\PersistentCollection {#100376 …}
    -favorites: Doctrine\ORM\PersistentCollection {#100374 …}
  }
  "showFullLabel" => "true"
]
Attributes
[
  "showFullLabel" => "true"
]
Component
App\Twig\Components\ProductState {#107202
  +product: App\Entity\Product\Product {#100380
    #id: 9354
    #code: "IEEE00002134"
    #attributes: Doctrine\ORM\PersistentCollection {#100361 …}
    #variants: Doctrine\ORM\PersistentCollection {#100358 …}
    #options: Doctrine\ORM\PersistentCollection {#100354 …}
    #associations: Doctrine\ORM\PersistentCollection {#100356 …}
    #createdAt: DateTime @1751038194 {#100387
      date: 2025-06-27 17:29:54.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1754607004 {#100360
      date: 2025-08-08 00:50:04.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#100371 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#100398
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#100380}
        #id: 32425
        #name: "IEEE 1427:2006"
        #slug: "ieee-1427-2006-ieee00002134-241006"
        #description: """
          New IEEE Standard - Superseded.<br />\n
          This guide, covering three-phase ac systems from 1 kV to 800 kV, provides recommended electrical operating and safety clearances and insulation levels in air-insulated electric supply substations; addresses insulation coordination procedures; provides design procedures for the selection and coordination of the insulation levels within the station as they relate to substation clearances; and addresses how reduced clearances in high-voltage ac substations will allow for compact bus arrangements and substation voltage uprating applications.<br />\n
          \t\t\t\t<br />\n
          This guide, covering three-phase ac systems from 1 kV to 800 kV, provides recommended electrical operating and safety clearances and insulation levels in air-insulated electric supply substations; addresses insulation coordination procedures; provides design procedures for the selection and coordination of the insulation levels within the station as they relate to substation clearances; and addresses how reduced clearances in high-voltage ac substations will allow for compact bus arrangements and substation voltage uprating applications. This guide addresses insulation coordination procedures, including the choice of insulation levels and arrester specification, in limited detail and only as relevant to clearance requirements. Detailed and expanded coverage of insulation coordination procedures is provided in other ANSI and IEEE guides and standards (see Clause 2). This guide focuses on open-air bus assemblies and configurations and excludes apparatus clearances (i.e., bushing clearances for transformers, and breakers). Detailed coverage of apparatus clearances is provided in other applicable guides and standards.<br />\n
          Proper electrical clearances are necessary for the design, construction, and operation of electric supply substations. This document develops guidelines for the application of recommended electrical clearances and insulation levels in air-insulated substations. The recommended clearances incorporate both design/operating clearances and safety clearances.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for Recommended Electrical Clearances and Insulation Levels in Air Insulated Electrical Power Substations"
        -notes: "Superseded"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#100369 …}
    #channels: Doctrine\ORM\PersistentCollection {#100363 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7311 …}
    #reviews: Doctrine\ORM\PersistentCollection {#100367 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#100365 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7325 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#100378 …}
    -apiLastModifiedAt: DateTime @1754517600 {#100347
      date: 2025-08-07 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1692136800 {#100386
      date: 2023-08-16 00:00:00.0 Europe/Paris (+02:00)
    }
    -author: ""
    -publishedAt: DateTime @1178229600 {#100385
      date: 2007-05-04 00:00:00.0 Europe/Paris (+02:00)
    }
    -releasedAt: null
    -confirmedAt: null
    -canceledAt: DateTime @1178229600 {#100379
      date: 2007-05-04 00:00:00.0 Europe/Paris (+02:00)
    }
    -edition: null
    -coreDocument: "1427"
    -bookCollection: ""
    -pageCount: 50
    -documents: Doctrine\ORM\PersistentCollection {#100376 …}
    -favorites: Doctrine\ORM\PersistentCollection {#100374 …}
  }
  +appearance: "state-suspended"
  +labels: [
    "Superseded"
  ]
  -stateAttributeCode: "state"
  -localeContext: Sylius\Component\Locale\Context\CompositeLocaleContext {#1833 …}
}
ProductMostRecent App\Twig\Components\ProductMostRecent 262.0 MiB 0.61 ms
Input props
[
  "product" => App\Entity\Product\Product {#100380
    #id: 9354
    #code: "IEEE00002134"
    #attributes: Doctrine\ORM\PersistentCollection {#100361 …}
    #variants: Doctrine\ORM\PersistentCollection {#100358 …}
    #options: Doctrine\ORM\PersistentCollection {#100354 …}
    #associations: Doctrine\ORM\PersistentCollection {#100356 …}
    #createdAt: DateTime @1751038194 {#100387
      date: 2025-06-27 17:29:54.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1754607004 {#100360
      date: 2025-08-08 00:50:04.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#100371 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#100398
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#100380}
        #id: 32425
        #name: "IEEE 1427:2006"
        #slug: "ieee-1427-2006-ieee00002134-241006"
        #description: """
          New IEEE Standard - Superseded.<br />\n
          This guide, covering three-phase ac systems from 1 kV to 800 kV, provides recommended electrical operating and safety clearances and insulation levels in air-insulated electric supply substations; addresses insulation coordination procedures; provides design procedures for the selection and coordination of the insulation levels within the station as they relate to substation clearances; and addresses how reduced clearances in high-voltage ac substations will allow for compact bus arrangements and substation voltage uprating applications.<br />\n
          \t\t\t\t<br />\n
          This guide, covering three-phase ac systems from 1 kV to 800 kV, provides recommended electrical operating and safety clearances and insulation levels in air-insulated electric supply substations; addresses insulation coordination procedures; provides design procedures for the selection and coordination of the insulation levels within the station as they relate to substation clearances; and addresses how reduced clearances in high-voltage ac substations will allow for compact bus arrangements and substation voltage uprating applications. This guide addresses insulation coordination procedures, including the choice of insulation levels and arrester specification, in limited detail and only as relevant to clearance requirements. Detailed and expanded coverage of insulation coordination procedures is provided in other ANSI and IEEE guides and standards (see Clause 2). This guide focuses on open-air bus assemblies and configurations and excludes apparatus clearances (i.e., bushing clearances for transformers, and breakers). Detailed coverage of apparatus clearances is provided in other applicable guides and standards.<br />\n
          Proper electrical clearances are necessary for the design, construction, and operation of electric supply substations. This document develops guidelines for the application of recommended electrical clearances and insulation levels in air-insulated substations. The recommended clearances incorporate both design/operating clearances and safety clearances.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for Recommended Electrical Clearances and Insulation Levels in Air Insulated Electrical Power Substations"
        -notes: "Superseded"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#100369 …}
    #channels: Doctrine\ORM\PersistentCollection {#100363 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7311 …}
    #reviews: Doctrine\ORM\PersistentCollection {#100367 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#100365 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7325 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#100378 …}
    -apiLastModifiedAt: DateTime @1754517600 {#100347
      date: 2025-08-07 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1692136800 {#100386
      date: 2023-08-16 00:00:00.0 Europe/Paris (+02:00)
    }
    -author: ""
    -publishedAt: DateTime @1178229600 {#100385
      date: 2007-05-04 00:00:00.0 Europe/Paris (+02:00)
    }
    -releasedAt: null
    -confirmedAt: null
    -canceledAt: DateTime @1178229600 {#100379
      date: 2007-05-04 00:00:00.0 Europe/Paris (+02:00)
    }
    -edition: null
    -coreDocument: "1427"
    -bookCollection: ""
    -pageCount: 50
    -documents: Doctrine\ORM\PersistentCollection {#100376 …}
    -favorites: Doctrine\ORM\PersistentCollection {#100374 …}
  }
]
Attributes
[]
Component
App\Twig\Components\ProductMostRecent {#107229
  +product: App\Entity\Product\Product {#100380
    #id: 9354
    #code: "IEEE00002134"
    #attributes: Doctrine\ORM\PersistentCollection {#100361 …}
    #variants: Doctrine\ORM\PersistentCollection {#100358 …}
    #options: Doctrine\ORM\PersistentCollection {#100354 …}
    #associations: Doctrine\ORM\PersistentCollection {#100356 …}
    #createdAt: DateTime @1751038194 {#100387
      date: 2025-06-27 17:29:54.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1754607004 {#100360
      date: 2025-08-08 00:50:04.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#100371 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#100398
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#100380}
        #id: 32425
        #name: "IEEE 1427:2006"
        #slug: "ieee-1427-2006-ieee00002134-241006"
        #description: """
          New IEEE Standard - Superseded.<br />\n
          This guide, covering three-phase ac systems from 1 kV to 800 kV, provides recommended electrical operating and safety clearances and insulation levels in air-insulated electric supply substations; addresses insulation coordination procedures; provides design procedures for the selection and coordination of the insulation levels within the station as they relate to substation clearances; and addresses how reduced clearances in high-voltage ac substations will allow for compact bus arrangements and substation voltage uprating applications.<br />\n
          \t\t\t\t<br />\n
          This guide, covering three-phase ac systems from 1 kV to 800 kV, provides recommended electrical operating and safety clearances and insulation levels in air-insulated electric supply substations; addresses insulation coordination procedures; provides design procedures for the selection and coordination of the insulation levels within the station as they relate to substation clearances; and addresses how reduced clearances in high-voltage ac substations will allow for compact bus arrangements and substation voltage uprating applications. This guide addresses insulation coordination procedures, including the choice of insulation levels and arrester specification, in limited detail and only as relevant to clearance requirements. Detailed and expanded coverage of insulation coordination procedures is provided in other ANSI and IEEE guides and standards (see Clause 2). This guide focuses on open-air bus assemblies and configurations and excludes apparatus clearances (i.e., bushing clearances for transformers, and breakers). Detailed coverage of apparatus clearances is provided in other applicable guides and standards.<br />\n
          Proper electrical clearances are necessary for the design, construction, and operation of electric supply substations. This document develops guidelines for the application of recommended electrical clearances and insulation levels in air-insulated substations. The recommended clearances incorporate both design/operating clearances and safety clearances.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for Recommended Electrical Clearances and Insulation Levels in Air Insulated Electrical Power Substations"
        -notes: "Superseded"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#100369 …}
    #channels: Doctrine\ORM\PersistentCollection {#100363 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7311 …}
    #reviews: Doctrine\ORM\PersistentCollection {#100367 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#100365 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7325 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#100378 …}
    -apiLastModifiedAt: DateTime @1754517600 {#100347
      date: 2025-08-07 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1692136800 {#100386
      date: 2023-08-16 00:00:00.0 Europe/Paris (+02:00)
    }
    -author: ""
    -publishedAt: DateTime @1178229600 {#100385
      date: 2007-05-04 00:00:00.0 Europe/Paris (+02:00)
    }
    -releasedAt: null
    -confirmedAt: null
    -canceledAt: DateTime @1178229600 {#100379
      date: 2007-05-04 00:00:00.0 Europe/Paris (+02:00)
    }
    -edition: null
    -coreDocument: "1427"
    -bookCollection: ""
    -pageCount: 50
    -documents: Doctrine\ORM\PersistentCollection {#100376 …}
    -favorites: Doctrine\ORM\PersistentCollection {#100374 …}
  }
  +label: "Historical"
  +icon: "historical"
  -mostRecentAttributeCode: "most_recent"
  -localeContext: Sylius\Component\Locale\Context\CompositeLocaleContext {#1833 …}
}
ProductCard App\Twig\Components\ProductCard 262.0 MiB 6.41 ms
Input props
[
  "product" => App\Entity\Product\Product {#128731
    #id: 9290
    #code: "IEEE00001995"
    #attributes: Doctrine\ORM\PersistentCollection {#128711 …}
    #variants: Doctrine\ORM\PersistentCollection {#128709 …}
    #options: Doctrine\ORM\PersistentCollection {#128704 …}
    #associations: Doctrine\ORM\PersistentCollection {#128706 …}
    #createdAt: DateTime @1751038141 {#128702
      date: 2025-06-27 17:29:01.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1753969444 {#128695
      date: 2025-07-31 15:44:04.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#128722 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#128822
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#128731}
        #id: 32169
        #name: "IEEE 1313.2:1999 (R2005)"
        #slug: "ieee-1313-2-1999-r2005-ieee00001995-240942"
        #description: """
          New IEEE Standard - Inactive-Reserved.<br />\n
          The calculation method for selection of phase-to-ground and phase-to-phase insulation withstand voltages for equipment is presented. This guide gives methods for insulation coordination of different air-insulated systems like transmission lines and substations. The methods of analysis are illustrated by practical examples.<br />\n
          \t\t\t\t<br />\n
          The insulation coordination standard and guide apply to three-phase ac systems above 1 kV and are divided into two parts.<br />\n
          IEEE Std 1313.1-1996 (Part 1) specifies the procedure for selection of the withstand voltages [basic lightning impulse insulation level (BIL) and basic switching impulse insulation level (BSL)] for equipment phase-ground and phase-phase insulation systems. It also identifies a list of standard insulation levels. Although he principles of this standard also apply to transmission line insulation systems, the insulation levels may be different from those identified as standard insulation levels.<br />\n
          This guide (Part 2) is an application guide with practical examples, intended to provide guidance in the determination of the withstand voltages and to suggest calculation methods and procedures. The insulation coordination examples for selected equipment are designed to explain the principles of Part 1. The guide is intended for air-insulated ac systems; caution should be exercised in the case of gas-insulated systems (GIS).<br />\n
          It should be recognized that absolute protection of station equipment is theoretically impossible. Even if arresters are located at the terminals of all apparatuses, equipment failures can occur. The probabilistic method, that is, designing for a mean time between failures (MTBF) criterion, is proposed here not only to permit a realistic basis of design, but perhaps more importantly, to form a consistent measure of design based on reliability.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for the Application of Insulation Coordination"
        -notes: "Inactive-Reserved"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#128719 …}
    #channels: Doctrine\ORM\PersistentCollection {#128713 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7311 …}
    #reviews: Doctrine\ORM\PersistentCollection {#128717 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#128715 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7325 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#128728 …}
    -apiLastModifiedAt: DateTime @1743289200 {#128688
      date: 2025-03-30 00:00:00.0 Europe/Paris (+01:00)
    }
    -lastUpdatedAt: DateTime @1581375600 {#128737
      date: 2020-02-11 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @942620400 {#128708
      date: 1999-11-15 00:00:00.0 Europe/Paris (+01:00)
    }
    -releasedAt: null
    -confirmedAt: DateTime @1118268000 {#128689
      date: 2005-06-09 00:00:00.0 Europe/Paris (+02:00)
    }
    -canceledAt: DateTime @1573081200 {#128729
      date: 2019-11-07 00:00:00.0 Europe/Paris (+01:00)
    }
    -edition: null
    -coreDocument: "1313.2"
    -bookCollection: ""
    -pageCount: 68
    -documents: Doctrine\ORM\PersistentCollection {#128726 …}
    -favorites: Doctrine\ORM\PersistentCollection {#128724 …}
  }
  "layout" => "vertical"
  "showPrice" => true
  "showStatusBadges" => true
  "additionalClasses" => "product__teaser--with-grey-border"
  "hasStretchedLink" => true
  "hoverType" => "shadow"
  "linkLabel" => "See more"
]
Attributes
[]
Component
App\Twig\Components\ProductCard {#128768
  +product: App\Entity\Product\Product {#128731
    #id: 9290
    #code: "IEEE00001995"
    #attributes: Doctrine\ORM\PersistentCollection {#128711 …}
    #variants: Doctrine\ORM\PersistentCollection {#128709 …}
    #options: Doctrine\ORM\PersistentCollection {#128704 …}
    #associations: Doctrine\ORM\PersistentCollection {#128706 …}
    #createdAt: DateTime @1751038141 {#128702
      date: 2025-06-27 17:29:01.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1753969444 {#128695
      date: 2025-07-31 15:44:04.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#128722 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#128822
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#128731}
        #id: 32169
        #name: "IEEE 1313.2:1999 (R2005)"
        #slug: "ieee-1313-2-1999-r2005-ieee00001995-240942"
        #description: """
          New IEEE Standard - Inactive-Reserved.<br />\n
          The calculation method for selection of phase-to-ground and phase-to-phase insulation withstand voltages for equipment is presented. This guide gives methods for insulation coordination of different air-insulated systems like transmission lines and substations. The methods of analysis are illustrated by practical examples.<br />\n
          \t\t\t\t<br />\n
          The insulation coordination standard and guide apply to three-phase ac systems above 1 kV and are divided into two parts.<br />\n
          IEEE Std 1313.1-1996 (Part 1) specifies the procedure for selection of the withstand voltages [basic lightning impulse insulation level (BIL) and basic switching impulse insulation level (BSL)] for equipment phase-ground and phase-phase insulation systems. It also identifies a list of standard insulation levels. Although he principles of this standard also apply to transmission line insulation systems, the insulation levels may be different from those identified as standard insulation levels.<br />\n
          This guide (Part 2) is an application guide with practical examples, intended to provide guidance in the determination of the withstand voltages and to suggest calculation methods and procedures. The insulation coordination examples for selected equipment are designed to explain the principles of Part 1. The guide is intended for air-insulated ac systems; caution should be exercised in the case of gas-insulated systems (GIS).<br />\n
          It should be recognized that absolute protection of station equipment is theoretically impossible. Even if arresters are located at the terminals of all apparatuses, equipment failures can occur. The probabilistic method, that is, designing for a mean time between failures (MTBF) criterion, is proposed here not only to permit a realistic basis of design, but perhaps more importantly, to form a consistent measure of design based on reliability.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for the Application of Insulation Coordination"
        -notes: "Inactive-Reserved"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#128719 …}
    #channels: Doctrine\ORM\PersistentCollection {#128713 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7311 …}
    #reviews: Doctrine\ORM\PersistentCollection {#128717 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#128715 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7325 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#128728 …}
    -apiLastModifiedAt: DateTime @1743289200 {#128688
      date: 2025-03-30 00:00:00.0 Europe/Paris (+01:00)
    }
    -lastUpdatedAt: DateTime @1581375600 {#128737
      date: 2020-02-11 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @942620400 {#128708
      date: 1999-11-15 00:00:00.0 Europe/Paris (+01:00)
    }
    -releasedAt: null
    -confirmedAt: DateTime @1118268000 {#128689
      date: 2005-06-09 00:00:00.0 Europe/Paris (+02:00)
    }
    -canceledAt: DateTime @1573081200 {#128729
      date: 2019-11-07 00:00:00.0 Europe/Paris (+01:00)
    }
    -edition: null
    -coreDocument: "1313.2"
    -bookCollection: ""
    -pageCount: 68
    -documents: Doctrine\ORM\PersistentCollection {#128726 …}
    -favorites: Doctrine\ORM\PersistentCollection {#128724 …}
  }
  +layout: "vertical"
  +showPrice: true
  +showStatusBadges: true
  +additionalClasses: "product__teaser--with-grey-border"
  +linkLabel: "See more"
  +imageFilter: "product_thumbnail_teaser"
  +hasStretchedLink: true
  +backgroundColor: "white"
  +hoverType: "shadow"
}
ProductState App\Twig\Components\ProductState 262.0 MiB 0.19 ms
Input props
[
  "product" => App\Entity\Product\Product {#128731
    #id: 9290
    #code: "IEEE00001995"
    #attributes: Doctrine\ORM\PersistentCollection {#128711 …}
    #variants: Doctrine\ORM\PersistentCollection {#128709 …}
    #options: Doctrine\ORM\PersistentCollection {#128704 …}
    #associations: Doctrine\ORM\PersistentCollection {#128706 …}
    #createdAt: DateTime @1751038141 {#128702
      date: 2025-06-27 17:29:01.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1753969444 {#128695
      date: 2025-07-31 15:44:04.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#128722 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#128822
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#128731}
        #id: 32169
        #name: "IEEE 1313.2:1999 (R2005)"
        #slug: "ieee-1313-2-1999-r2005-ieee00001995-240942"
        #description: """
          New IEEE Standard - Inactive-Reserved.<br />\n
          The calculation method for selection of phase-to-ground and phase-to-phase insulation withstand voltages for equipment is presented. This guide gives methods for insulation coordination of different air-insulated systems like transmission lines and substations. The methods of analysis are illustrated by practical examples.<br />\n
          \t\t\t\t<br />\n
          The insulation coordination standard and guide apply to three-phase ac systems above 1 kV and are divided into two parts.<br />\n
          IEEE Std 1313.1-1996 (Part 1) specifies the procedure for selection of the withstand voltages [basic lightning impulse insulation level (BIL) and basic switching impulse insulation level (BSL)] for equipment phase-ground and phase-phase insulation systems. It also identifies a list of standard insulation levels. Although he principles of this standard also apply to transmission line insulation systems, the insulation levels may be different from those identified as standard insulation levels.<br />\n
          This guide (Part 2) is an application guide with practical examples, intended to provide guidance in the determination of the withstand voltages and to suggest calculation methods and procedures. The insulation coordination examples for selected equipment are designed to explain the principles of Part 1. The guide is intended for air-insulated ac systems; caution should be exercised in the case of gas-insulated systems (GIS).<br />\n
          It should be recognized that absolute protection of station equipment is theoretically impossible. Even if arresters are located at the terminals of all apparatuses, equipment failures can occur. The probabilistic method, that is, designing for a mean time between failures (MTBF) criterion, is proposed here not only to permit a realistic basis of design, but perhaps more importantly, to form a consistent measure of design based on reliability.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for the Application of Insulation Coordination"
        -notes: "Inactive-Reserved"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#128719 …}
    #channels: Doctrine\ORM\PersistentCollection {#128713 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7311 …}
    #reviews: Doctrine\ORM\PersistentCollection {#128717 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#128715 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7325 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#128728 …}
    -apiLastModifiedAt: DateTime @1743289200 {#128688
      date: 2025-03-30 00:00:00.0 Europe/Paris (+01:00)
    }
    -lastUpdatedAt: DateTime @1581375600 {#128737
      date: 2020-02-11 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @942620400 {#128708
      date: 1999-11-15 00:00:00.0 Europe/Paris (+01:00)
    }
    -releasedAt: null
    -confirmedAt: DateTime @1118268000 {#128689
      date: 2005-06-09 00:00:00.0 Europe/Paris (+02:00)
    }
    -canceledAt: DateTime @1573081200 {#128729
      date: 2019-11-07 00:00:00.0 Europe/Paris (+01:00)
    }
    -edition: null
    -coreDocument: "1313.2"
    -bookCollection: ""
    -pageCount: 68
    -documents: Doctrine\ORM\PersistentCollection {#128726 …}
    -favorites: Doctrine\ORM\PersistentCollection {#128724 …}
  }
]
Attributes
[
  "showFullLabel" => false
]
Component
App\Twig\Components\ProductState {#128824
  +product: App\Entity\Product\Product {#128731
    #id: 9290
    #code: "IEEE00001995"
    #attributes: Doctrine\ORM\PersistentCollection {#128711 …}
    #variants: Doctrine\ORM\PersistentCollection {#128709 …}
    #options: Doctrine\ORM\PersistentCollection {#128704 …}
    #associations: Doctrine\ORM\PersistentCollection {#128706 …}
    #createdAt: DateTime @1751038141 {#128702
      date: 2025-06-27 17:29:01.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1753969444 {#128695
      date: 2025-07-31 15:44:04.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#128722 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#128822
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#128731}
        #id: 32169
        #name: "IEEE 1313.2:1999 (R2005)"
        #slug: "ieee-1313-2-1999-r2005-ieee00001995-240942"
        #description: """
          New IEEE Standard - Inactive-Reserved.<br />\n
          The calculation method for selection of phase-to-ground and phase-to-phase insulation withstand voltages for equipment is presented. This guide gives methods for insulation coordination of different air-insulated systems like transmission lines and substations. The methods of analysis are illustrated by practical examples.<br />\n
          \t\t\t\t<br />\n
          The insulation coordination standard and guide apply to three-phase ac systems above 1 kV and are divided into two parts.<br />\n
          IEEE Std 1313.1-1996 (Part 1) specifies the procedure for selection of the withstand voltages [basic lightning impulse insulation level (BIL) and basic switching impulse insulation level (BSL)] for equipment phase-ground and phase-phase insulation systems. It also identifies a list of standard insulation levels. Although he principles of this standard also apply to transmission line insulation systems, the insulation levels may be different from those identified as standard insulation levels.<br />\n
          This guide (Part 2) is an application guide with practical examples, intended to provide guidance in the determination of the withstand voltages and to suggest calculation methods and procedures. The insulation coordination examples for selected equipment are designed to explain the principles of Part 1. The guide is intended for air-insulated ac systems; caution should be exercised in the case of gas-insulated systems (GIS).<br />\n
          It should be recognized that absolute protection of station equipment is theoretically impossible. Even if arresters are located at the terminals of all apparatuses, equipment failures can occur. The probabilistic method, that is, designing for a mean time between failures (MTBF) criterion, is proposed here not only to permit a realistic basis of design, but perhaps more importantly, to form a consistent measure of design based on reliability.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for the Application of Insulation Coordination"
        -notes: "Inactive-Reserved"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#128719 …}
    #channels: Doctrine\ORM\PersistentCollection {#128713 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7311 …}
    #reviews: Doctrine\ORM\PersistentCollection {#128717 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#128715 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7325 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#128728 …}
    -apiLastModifiedAt: DateTime @1743289200 {#128688
      date: 2025-03-30 00:00:00.0 Europe/Paris (+01:00)
    }
    -lastUpdatedAt: DateTime @1581375600 {#128737
      date: 2020-02-11 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @942620400 {#128708
      date: 1999-11-15 00:00:00.0 Europe/Paris (+01:00)
    }
    -releasedAt: null
    -confirmedAt: DateTime @1118268000 {#128689
      date: 2005-06-09 00:00:00.0 Europe/Paris (+02:00)
    }
    -canceledAt: DateTime @1573081200 {#128729
      date: 2019-11-07 00:00:00.0 Europe/Paris (+01:00)
    }
    -edition: null
    -coreDocument: "1313.2"
    -bookCollection: ""
    -pageCount: 68
    -documents: Doctrine\ORM\PersistentCollection {#128726 …}
    -favorites: Doctrine\ORM\PersistentCollection {#128724 …}
  }
  +appearance: "state-withdrawn"
  +labels: [
    "Withdrawn"
  ]
  -stateAttributeCode: "state"
  -localeContext: Sylius\Component\Locale\Context\CompositeLocaleContext {#1833 …}
}
ProductMostRecent App\Twig\Components\ProductMostRecent 262.0 MiB 0.69 ms
Input props
[
  "product" => App\Entity\Product\Product {#128731
    #id: 9290
    #code: "IEEE00001995"
    #attributes: Doctrine\ORM\PersistentCollection {#128711 …}
    #variants: Doctrine\ORM\PersistentCollection {#128709 …}
    #options: Doctrine\ORM\PersistentCollection {#128704 …}
    #associations: Doctrine\ORM\PersistentCollection {#128706 …}
    #createdAt: DateTime @1751038141 {#128702
      date: 2025-06-27 17:29:01.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1753969444 {#128695
      date: 2025-07-31 15:44:04.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#128722 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#128822
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#128731}
        #id: 32169
        #name: "IEEE 1313.2:1999 (R2005)"
        #slug: "ieee-1313-2-1999-r2005-ieee00001995-240942"
        #description: """
          New IEEE Standard - Inactive-Reserved.<br />\n
          The calculation method for selection of phase-to-ground and phase-to-phase insulation withstand voltages for equipment is presented. This guide gives methods for insulation coordination of different air-insulated systems like transmission lines and substations. The methods of analysis are illustrated by practical examples.<br />\n
          \t\t\t\t<br />\n
          The insulation coordination standard and guide apply to three-phase ac systems above 1 kV and are divided into two parts.<br />\n
          IEEE Std 1313.1-1996 (Part 1) specifies the procedure for selection of the withstand voltages [basic lightning impulse insulation level (BIL) and basic switching impulse insulation level (BSL)] for equipment phase-ground and phase-phase insulation systems. It also identifies a list of standard insulation levels. Although he principles of this standard also apply to transmission line insulation systems, the insulation levels may be different from those identified as standard insulation levels.<br />\n
          This guide (Part 2) is an application guide with practical examples, intended to provide guidance in the determination of the withstand voltages and to suggest calculation methods and procedures. The insulation coordination examples for selected equipment are designed to explain the principles of Part 1. The guide is intended for air-insulated ac systems; caution should be exercised in the case of gas-insulated systems (GIS).<br />\n
          It should be recognized that absolute protection of station equipment is theoretically impossible. Even if arresters are located at the terminals of all apparatuses, equipment failures can occur. The probabilistic method, that is, designing for a mean time between failures (MTBF) criterion, is proposed here not only to permit a realistic basis of design, but perhaps more importantly, to form a consistent measure of design based on reliability.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for the Application of Insulation Coordination"
        -notes: "Inactive-Reserved"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#128719 …}
    #channels: Doctrine\ORM\PersistentCollection {#128713 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7311 …}
    #reviews: Doctrine\ORM\PersistentCollection {#128717 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#128715 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7325 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#128728 …}
    -apiLastModifiedAt: DateTime @1743289200 {#128688
      date: 2025-03-30 00:00:00.0 Europe/Paris (+01:00)
    }
    -lastUpdatedAt: DateTime @1581375600 {#128737
      date: 2020-02-11 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @942620400 {#128708
      date: 1999-11-15 00:00:00.0 Europe/Paris (+01:00)
    }
    -releasedAt: null
    -confirmedAt: DateTime @1118268000 {#128689
      date: 2005-06-09 00:00:00.0 Europe/Paris (+02:00)
    }
    -canceledAt: DateTime @1573081200 {#128729
      date: 2019-11-07 00:00:00.0 Europe/Paris (+01:00)
    }
    -edition: null
    -coreDocument: "1313.2"
    -bookCollection: ""
    -pageCount: 68
    -documents: Doctrine\ORM\PersistentCollection {#128726 …}
    -favorites: Doctrine\ORM\PersistentCollection {#128724 …}
  }
]
Attributes
[]
Component
App\Twig\Components\ProductMostRecent {#128900
  +product: App\Entity\Product\Product {#128731
    #id: 9290
    #code: "IEEE00001995"
    #attributes: Doctrine\ORM\PersistentCollection {#128711 …}
    #variants: Doctrine\ORM\PersistentCollection {#128709 …}
    #options: Doctrine\ORM\PersistentCollection {#128704 …}
    #associations: Doctrine\ORM\PersistentCollection {#128706 …}
    #createdAt: DateTime @1751038141 {#128702
      date: 2025-06-27 17:29:01.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1753969444 {#128695
      date: 2025-07-31 15:44:04.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#128722 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#128822
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#128731}
        #id: 32169
        #name: "IEEE 1313.2:1999 (R2005)"
        #slug: "ieee-1313-2-1999-r2005-ieee00001995-240942"
        #description: """
          New IEEE Standard - Inactive-Reserved.<br />\n
          The calculation method for selection of phase-to-ground and phase-to-phase insulation withstand voltages for equipment is presented. This guide gives methods for insulation coordination of different air-insulated systems like transmission lines and substations. The methods of analysis are illustrated by practical examples.<br />\n
          \t\t\t\t<br />\n
          The insulation coordination standard and guide apply to three-phase ac systems above 1 kV and are divided into two parts.<br />\n
          IEEE Std 1313.1-1996 (Part 1) specifies the procedure for selection of the withstand voltages [basic lightning impulse insulation level (BIL) and basic switching impulse insulation level (BSL)] for equipment phase-ground and phase-phase insulation systems. It also identifies a list of standard insulation levels. Although he principles of this standard also apply to transmission line insulation systems, the insulation levels may be different from those identified as standard insulation levels.<br />\n
          This guide (Part 2) is an application guide with practical examples, intended to provide guidance in the determination of the withstand voltages and to suggest calculation methods and procedures. The insulation coordination examples for selected equipment are designed to explain the principles of Part 1. The guide is intended for air-insulated ac systems; caution should be exercised in the case of gas-insulated systems (GIS).<br />\n
          It should be recognized that absolute protection of station equipment is theoretically impossible. Even if arresters are located at the terminals of all apparatuses, equipment failures can occur. The probabilistic method, that is, designing for a mean time between failures (MTBF) criterion, is proposed here not only to permit a realistic basis of design, but perhaps more importantly, to form a consistent measure of design based on reliability.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for the Application of Insulation Coordination"
        -notes: "Inactive-Reserved"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#128719 …}
    #channels: Doctrine\ORM\PersistentCollection {#128713 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7311 …}
    #reviews: Doctrine\ORM\PersistentCollection {#128717 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#128715 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7325 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#128728 …}
    -apiLastModifiedAt: DateTime @1743289200 {#128688
      date: 2025-03-30 00:00:00.0 Europe/Paris (+01:00)
    }
    -lastUpdatedAt: DateTime @1581375600 {#128737
      date: 2020-02-11 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @942620400 {#128708
      date: 1999-11-15 00:00:00.0 Europe/Paris (+01:00)
    }
    -releasedAt: null
    -confirmedAt: DateTime @1118268000 {#128689
      date: 2005-06-09 00:00:00.0 Europe/Paris (+02:00)
    }
    -canceledAt: DateTime @1573081200 {#128729
      date: 2019-11-07 00:00:00.0 Europe/Paris (+01:00)
    }
    -edition: null
    -coreDocument: "1313.2"
    -bookCollection: ""
    -pageCount: 68
    -documents: Doctrine\ORM\PersistentCollection {#128726 …}
    -favorites: Doctrine\ORM\PersistentCollection {#128724 …}
  }
  +label: "Most Recent"
  +icon: "check-xs"
  -mostRecentAttributeCode: "most_recent"
  -localeContext: Sylius\Component\Locale\Context\CompositeLocaleContext {#1833 …}
}