GET https://dev.normadoc.fr/_partial/product/IEEE00005006/features

Components

4 Twig Components
15 Render Count
22 ms Render Time
140.0 MiB Memory Usage

Components

Name Metadata Render Count Render Time
ProductState
"App\Twig\Components\ProductState"
components/ProductState.html.twig
6 1.52ms
ProductMostRecent
"App\Twig\Components\ProductMostRecent"
components/ProductMostRecent.html.twig
6 4.86ms
ProductCard
"App\Twig\Components\ProductCard"
components/ProductCard.html.twig
2 17.28ms
ProductType
"App\Twig\Components\ProductType"
components/ProductType.html.twig
1 0.22ms

Render calls

ProductState App\Twig\Components\ProductState 140.0 MiB 0.39 ms
Input props
[
  "product" => App\Entity\Product\Product {#7520
    #id: 10787
    #code: "IEEE00005006"
    #attributes: Doctrine\ORM\PersistentCollection {#8207 …}
    #variants: Doctrine\ORM\PersistentCollection {#8289 …}
    #options: Doctrine\ORM\PersistentCollection {#8628 …}
    #associations: Doctrine\ORM\PersistentCollection {#8585 …}
    #createdAt: DateTime @1751039283 {#7536
      date: 2025-06-27 17:48:03.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1754607611 {#7535
      date: 2025-08-08 01:00:11.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#8627 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#8612
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#7520}
        #id: 38157
        #name: "IEEE 1303:2011"
        #slug: "ieee-1303-2011-ieee00005006-242439"
        #description: """
          Revision Standard - Active.<br />\n
          General guidelines and criteria for the field testing of static var compensators (SVCs), before they are placed in-service, for the purpose of verifying their specified performance are described. The major elements of a commissioning program are identified so that the user can formulate a specific plan that is most suited for his or her own SVC.<br />\n
          \t\t\t\t<br />\n
          This document is a guide for field testing and commissioning of static var compensators (SVCs). As such, the document establishes general guidelines and criteria for field testing to verify the specified performance of SVC systems. Many clauses will be useful for compensator systems using gate turn-off (GTO) thyristor technology (static compensator [STATCOM]) or other semiconductor devices such as insulated gate commutated transistor (IGCT).<br />\n
          This guide does not<br />\n
          a) Cover factory and simulator tests of SVC system components (but it assumes that such tests have been performed beforehand).<br />\n
          b) Discuss the division of responsibility between user and supplier, since this division is usually defined in the contract between buyer and supplier. Most often, however, the practice is for the equipment, subsystem, and commissioning tests to be performed by the supplier, and the acceptance tests to be performed by the buyer or user.<br />\n
          The purpose of this guide is to help users of SVCs carry out a field test program prior to placing an SVC into service. The major elements of a commissioning program are identified so that users can formulate a specific plan that is suited to their own SVC. Such a test program should cover the following:<br />\n
          a) Equipment tests within the SVC system<br />\n
          b) Tests of the various subsystems that comprise the SVC system<br />\n
          c) Commissioning tests for the complete SVC system<br />\n
          d) Acceptance testing of the complete SVC system<br />\n
          It should be recognized that there are many ways in which a particular SVC may be commissioned, and also that it is not the purpose of this guide to endorse a specific procedure to the exclusion of otherre<br />\n
          methods.<br />\n
          Depending on the purpose of the SVC design (transmission type or smaller size used for other purposes) some tests may not be required. In particular, some control system tests may be included in the factory tests. Also, acceptance tests may be integrated into any of the categories listed above.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for Static Var Compensator Field Tests"
        -notes: "Active"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#7943 …}
    #channels: Doctrine\ORM\PersistentCollection {#8104 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7519 …}
    #reviews: Doctrine\ORM\PersistentCollection {#8066 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#8118 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7681 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#7746 …}
    -apiLastModifiedAt: DateTime @1754517600 {#7530
      date: 2025-08-07 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1578006000 {#7496
      date: 2020-01-03 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @1314309600 {#7531
      date: 2011-08-26 00:00:00.0 Europe/Paris (+02:00)
    }
    -releasedAt: null
    -confirmedAt: null
    -canceledAt: null
    -edition: null
    -coreDocument: "1303"
    -bookCollection: ""
    -pageCount: 49
    -documents: Doctrine\ORM\PersistentCollection {#7786 …}
    -favorites: Doctrine\ORM\PersistentCollection {#7928 …}
  }
  "showFullLabel" => "true"
]
Attributes
[
  "showFullLabel" => "true"
]
Component
App\Twig\Components\ProductState {#95108
  +product: App\Entity\Product\Product {#7520
    #id: 10787
    #code: "IEEE00005006"
    #attributes: Doctrine\ORM\PersistentCollection {#8207 …}
    #variants: Doctrine\ORM\PersistentCollection {#8289 …}
    #options: Doctrine\ORM\PersistentCollection {#8628 …}
    #associations: Doctrine\ORM\PersistentCollection {#8585 …}
    #createdAt: DateTime @1751039283 {#7536
      date: 2025-06-27 17:48:03.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1754607611 {#7535
      date: 2025-08-08 01:00:11.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#8627 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#8612
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#7520}
        #id: 38157
        #name: "IEEE 1303:2011"
        #slug: "ieee-1303-2011-ieee00005006-242439"
        #description: """
          Revision Standard - Active.<br />\n
          General guidelines and criteria for the field testing of static var compensators (SVCs), before they are placed in-service, for the purpose of verifying their specified performance are described. The major elements of a commissioning program are identified so that the user can formulate a specific plan that is most suited for his or her own SVC.<br />\n
          \t\t\t\t<br />\n
          This document is a guide for field testing and commissioning of static var compensators (SVCs). As such, the document establishes general guidelines and criteria for field testing to verify the specified performance of SVC systems. Many clauses will be useful for compensator systems using gate turn-off (GTO) thyristor technology (static compensator [STATCOM]) or other semiconductor devices such as insulated gate commutated transistor (IGCT).<br />\n
          This guide does not<br />\n
          a) Cover factory and simulator tests of SVC system components (but it assumes that such tests have been performed beforehand).<br />\n
          b) Discuss the division of responsibility between user and supplier, since this division is usually defined in the contract between buyer and supplier. Most often, however, the practice is for the equipment, subsystem, and commissioning tests to be performed by the supplier, and the acceptance tests to be performed by the buyer or user.<br />\n
          The purpose of this guide is to help users of SVCs carry out a field test program prior to placing an SVC into service. The major elements of a commissioning program are identified so that users can formulate a specific plan that is suited to their own SVC. Such a test program should cover the following:<br />\n
          a) Equipment tests within the SVC system<br />\n
          b) Tests of the various subsystems that comprise the SVC system<br />\n
          c) Commissioning tests for the complete SVC system<br />\n
          d) Acceptance testing of the complete SVC system<br />\n
          It should be recognized that there are many ways in which a particular SVC may be commissioned, and also that it is not the purpose of this guide to endorse a specific procedure to the exclusion of otherre<br />\n
          methods.<br />\n
          Depending on the purpose of the SVC design (transmission type or smaller size used for other purposes) some tests may not be required. In particular, some control system tests may be included in the factory tests. Also, acceptance tests may be integrated into any of the categories listed above.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for Static Var Compensator Field Tests"
        -notes: "Active"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#7943 …}
    #channels: Doctrine\ORM\PersistentCollection {#8104 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7519 …}
    #reviews: Doctrine\ORM\PersistentCollection {#8066 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#8118 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7681 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#7746 …}
    -apiLastModifiedAt: DateTime @1754517600 {#7530
      date: 2025-08-07 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1578006000 {#7496
      date: 2020-01-03 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @1314309600 {#7531
      date: 2011-08-26 00:00:00.0 Europe/Paris (+02:00)
    }
    -releasedAt: null
    -confirmedAt: null
    -canceledAt: null
    -edition: null
    -coreDocument: "1303"
    -bookCollection: ""
    -pageCount: 49
    -documents: Doctrine\ORM\PersistentCollection {#7786 …}
    -favorites: Doctrine\ORM\PersistentCollection {#7928 …}
  }
  +appearance: "state-active"
  +labels: [
    "Active"
  ]
  -stateAttributeCode: "state"
  -localeContext: Sylius\Component\Locale\Context\CompositeLocaleContext {#1833 …}
}
ProductType App\Twig\Components\ProductType 140.0 MiB 0.22 ms
Input props
[
  "product" => App\Entity\Product\Product {#7520
    #id: 10787
    #code: "IEEE00005006"
    #attributes: Doctrine\ORM\PersistentCollection {#8207 …}
    #variants: Doctrine\ORM\PersistentCollection {#8289 …}
    #options: Doctrine\ORM\PersistentCollection {#8628 …}
    #associations: Doctrine\ORM\PersistentCollection {#8585 …}
    #createdAt: DateTime @1751039283 {#7536
      date: 2025-06-27 17:48:03.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1754607611 {#7535
      date: 2025-08-08 01:00:11.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#8627 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#8612
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#7520}
        #id: 38157
        #name: "IEEE 1303:2011"
        #slug: "ieee-1303-2011-ieee00005006-242439"
        #description: """
          Revision Standard - Active.<br />\n
          General guidelines and criteria for the field testing of static var compensators (SVCs), before they are placed in-service, for the purpose of verifying their specified performance are described. The major elements of a commissioning program are identified so that the user can formulate a specific plan that is most suited for his or her own SVC.<br />\n
          \t\t\t\t<br />\n
          This document is a guide for field testing and commissioning of static var compensators (SVCs). As such, the document establishes general guidelines and criteria for field testing to verify the specified performance of SVC systems. Many clauses will be useful for compensator systems using gate turn-off (GTO) thyristor technology (static compensator [STATCOM]) or other semiconductor devices such as insulated gate commutated transistor (IGCT).<br />\n
          This guide does not<br />\n
          a) Cover factory and simulator tests of SVC system components (but it assumes that such tests have been performed beforehand).<br />\n
          b) Discuss the division of responsibility between user and supplier, since this division is usually defined in the contract between buyer and supplier. Most often, however, the practice is for the equipment, subsystem, and commissioning tests to be performed by the supplier, and the acceptance tests to be performed by the buyer or user.<br />\n
          The purpose of this guide is to help users of SVCs carry out a field test program prior to placing an SVC into service. The major elements of a commissioning program are identified so that users can formulate a specific plan that is suited to their own SVC. Such a test program should cover the following:<br />\n
          a) Equipment tests within the SVC system<br />\n
          b) Tests of the various subsystems that comprise the SVC system<br />\n
          c) Commissioning tests for the complete SVC system<br />\n
          d) Acceptance testing of the complete SVC system<br />\n
          It should be recognized that there are many ways in which a particular SVC may be commissioned, and also that it is not the purpose of this guide to endorse a specific procedure to the exclusion of otherre<br />\n
          methods.<br />\n
          Depending on the purpose of the SVC design (transmission type or smaller size used for other purposes) some tests may not be required. In particular, some control system tests may be included in the factory tests. Also, acceptance tests may be integrated into any of the categories listed above.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for Static Var Compensator Field Tests"
        -notes: "Active"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#7943 …}
    #channels: Doctrine\ORM\PersistentCollection {#8104 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7519 …}
    #reviews: Doctrine\ORM\PersistentCollection {#8066 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#8118 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7681 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#7746 …}
    -apiLastModifiedAt: DateTime @1754517600 {#7530
      date: 2025-08-07 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1578006000 {#7496
      date: 2020-01-03 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @1314309600 {#7531
      date: 2011-08-26 00:00:00.0 Europe/Paris (+02:00)
    }
    -releasedAt: null
    -confirmedAt: null
    -canceledAt: null
    -edition: null
    -coreDocument: "1303"
    -bookCollection: ""
    -pageCount: 49
    -documents: Doctrine\ORM\PersistentCollection {#7786 …}
    -favorites: Doctrine\ORM\PersistentCollection {#7928 …}
  }
]
Attributes
[]
Component
App\Twig\Components\ProductType {#95288
  +product: App\Entity\Product\Product {#7520
    #id: 10787
    #code: "IEEE00005006"
    #attributes: Doctrine\ORM\PersistentCollection {#8207 …}
    #variants: Doctrine\ORM\PersistentCollection {#8289 …}
    #options: Doctrine\ORM\PersistentCollection {#8628 …}
    #associations: Doctrine\ORM\PersistentCollection {#8585 …}
    #createdAt: DateTime @1751039283 {#7536
      date: 2025-06-27 17:48:03.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1754607611 {#7535
      date: 2025-08-08 01:00:11.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#8627 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#8612
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#7520}
        #id: 38157
        #name: "IEEE 1303:2011"
        #slug: "ieee-1303-2011-ieee00005006-242439"
        #description: """
          Revision Standard - Active.<br />\n
          General guidelines and criteria for the field testing of static var compensators (SVCs), before they are placed in-service, for the purpose of verifying their specified performance are described. The major elements of a commissioning program are identified so that the user can formulate a specific plan that is most suited for his or her own SVC.<br />\n
          \t\t\t\t<br />\n
          This document is a guide for field testing and commissioning of static var compensators (SVCs). As such, the document establishes general guidelines and criteria for field testing to verify the specified performance of SVC systems. Many clauses will be useful for compensator systems using gate turn-off (GTO) thyristor technology (static compensator [STATCOM]) or other semiconductor devices such as insulated gate commutated transistor (IGCT).<br />\n
          This guide does not<br />\n
          a) Cover factory and simulator tests of SVC system components (but it assumes that such tests have been performed beforehand).<br />\n
          b) Discuss the division of responsibility between user and supplier, since this division is usually defined in the contract between buyer and supplier. Most often, however, the practice is for the equipment, subsystem, and commissioning tests to be performed by the supplier, and the acceptance tests to be performed by the buyer or user.<br />\n
          The purpose of this guide is to help users of SVCs carry out a field test program prior to placing an SVC into service. The major elements of a commissioning program are identified so that users can formulate a specific plan that is suited to their own SVC. Such a test program should cover the following:<br />\n
          a) Equipment tests within the SVC system<br />\n
          b) Tests of the various subsystems that comprise the SVC system<br />\n
          c) Commissioning tests for the complete SVC system<br />\n
          d) Acceptance testing of the complete SVC system<br />\n
          It should be recognized that there are many ways in which a particular SVC may be commissioned, and also that it is not the purpose of this guide to endorse a specific procedure to the exclusion of otherre<br />\n
          methods.<br />\n
          Depending on the purpose of the SVC design (transmission type or smaller size used for other purposes) some tests may not be required. In particular, some control system tests may be included in the factory tests. Also, acceptance tests may be integrated into any of the categories listed above.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for Static Var Compensator Field Tests"
        -notes: "Active"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#7943 …}
    #channels: Doctrine\ORM\PersistentCollection {#8104 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7519 …}
    #reviews: Doctrine\ORM\PersistentCollection {#8066 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#8118 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7681 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#7746 …}
    -apiLastModifiedAt: DateTime @1754517600 {#7530
      date: 2025-08-07 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1578006000 {#7496
      date: 2020-01-03 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @1314309600 {#7531
      date: 2011-08-26 00:00:00.0 Europe/Paris (+02:00)
    }
    -releasedAt: null
    -confirmedAt: null
    -canceledAt: null
    -edition: null
    -coreDocument: "1303"
    -bookCollection: ""
    -pageCount: 49
    -documents: Doctrine\ORM\PersistentCollection {#7786 …}
    -favorites: Doctrine\ORM\PersistentCollection {#7928 …}
  }
  +label: "Standard"
  -typeAttributeCode: "type"
  -localeContext: Sylius\Component\Locale\Context\CompositeLocaleContext {#1833 …}
}
ProductMostRecent App\Twig\Components\ProductMostRecent 140.0 MiB 0.84 ms
Input props
[
  "product" => App\Entity\Product\Product {#7520
    #id: 10787
    #code: "IEEE00005006"
    #attributes: Doctrine\ORM\PersistentCollection {#8207 …}
    #variants: Doctrine\ORM\PersistentCollection {#8289 …}
    #options: Doctrine\ORM\PersistentCollection {#8628 …}
    #associations: Doctrine\ORM\PersistentCollection {#8585 …}
    #createdAt: DateTime @1751039283 {#7536
      date: 2025-06-27 17:48:03.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1754607611 {#7535
      date: 2025-08-08 01:00:11.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#8627 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#8612
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#7520}
        #id: 38157
        #name: "IEEE 1303:2011"
        #slug: "ieee-1303-2011-ieee00005006-242439"
        #description: """
          Revision Standard - Active.<br />\n
          General guidelines and criteria for the field testing of static var compensators (SVCs), before they are placed in-service, for the purpose of verifying their specified performance are described. The major elements of a commissioning program are identified so that the user can formulate a specific plan that is most suited for his or her own SVC.<br />\n
          \t\t\t\t<br />\n
          This document is a guide for field testing and commissioning of static var compensators (SVCs). As such, the document establishes general guidelines and criteria for field testing to verify the specified performance of SVC systems. Many clauses will be useful for compensator systems using gate turn-off (GTO) thyristor technology (static compensator [STATCOM]) or other semiconductor devices such as insulated gate commutated transistor (IGCT).<br />\n
          This guide does not<br />\n
          a) Cover factory and simulator tests of SVC system components (but it assumes that such tests have been performed beforehand).<br />\n
          b) Discuss the division of responsibility between user and supplier, since this division is usually defined in the contract between buyer and supplier. Most often, however, the practice is for the equipment, subsystem, and commissioning tests to be performed by the supplier, and the acceptance tests to be performed by the buyer or user.<br />\n
          The purpose of this guide is to help users of SVCs carry out a field test program prior to placing an SVC into service. The major elements of a commissioning program are identified so that users can formulate a specific plan that is suited to their own SVC. Such a test program should cover the following:<br />\n
          a) Equipment tests within the SVC system<br />\n
          b) Tests of the various subsystems that comprise the SVC system<br />\n
          c) Commissioning tests for the complete SVC system<br />\n
          d) Acceptance testing of the complete SVC system<br />\n
          It should be recognized that there are many ways in which a particular SVC may be commissioned, and also that it is not the purpose of this guide to endorse a specific procedure to the exclusion of otherre<br />\n
          methods.<br />\n
          Depending on the purpose of the SVC design (transmission type or smaller size used for other purposes) some tests may not be required. In particular, some control system tests may be included in the factory tests. Also, acceptance tests may be integrated into any of the categories listed above.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for Static Var Compensator Field Tests"
        -notes: "Active"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#7943 …}
    #channels: Doctrine\ORM\PersistentCollection {#8104 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7519 …}
    #reviews: Doctrine\ORM\PersistentCollection {#8066 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#8118 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7681 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#7746 …}
    -apiLastModifiedAt: DateTime @1754517600 {#7530
      date: 2025-08-07 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1578006000 {#7496
      date: 2020-01-03 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @1314309600 {#7531
      date: 2011-08-26 00:00:00.0 Europe/Paris (+02:00)
    }
    -releasedAt: null
    -confirmedAt: null
    -canceledAt: null
    -edition: null
    -coreDocument: "1303"
    -bookCollection: ""
    -pageCount: 49
    -documents: Doctrine\ORM\PersistentCollection {#7786 …}
    -favorites: Doctrine\ORM\PersistentCollection {#7928 …}
  }
]
Attributes
[]
Component
App\Twig\Components\ProductMostRecent {#95363
  +product: App\Entity\Product\Product {#7520
    #id: 10787
    #code: "IEEE00005006"
    #attributes: Doctrine\ORM\PersistentCollection {#8207 …}
    #variants: Doctrine\ORM\PersistentCollection {#8289 …}
    #options: Doctrine\ORM\PersistentCollection {#8628 …}
    #associations: Doctrine\ORM\PersistentCollection {#8585 …}
    #createdAt: DateTime @1751039283 {#7536
      date: 2025-06-27 17:48:03.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1754607611 {#7535
      date: 2025-08-08 01:00:11.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#8627 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#8612
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#7520}
        #id: 38157
        #name: "IEEE 1303:2011"
        #slug: "ieee-1303-2011-ieee00005006-242439"
        #description: """
          Revision Standard - Active.<br />\n
          General guidelines and criteria for the field testing of static var compensators (SVCs), before they are placed in-service, for the purpose of verifying their specified performance are described. The major elements of a commissioning program are identified so that the user can formulate a specific plan that is most suited for his or her own SVC.<br />\n
          \t\t\t\t<br />\n
          This document is a guide for field testing and commissioning of static var compensators (SVCs). As such, the document establishes general guidelines and criteria for field testing to verify the specified performance of SVC systems. Many clauses will be useful for compensator systems using gate turn-off (GTO) thyristor technology (static compensator [STATCOM]) or other semiconductor devices such as insulated gate commutated transistor (IGCT).<br />\n
          This guide does not<br />\n
          a) Cover factory and simulator tests of SVC system components (but it assumes that such tests have been performed beforehand).<br />\n
          b) Discuss the division of responsibility between user and supplier, since this division is usually defined in the contract between buyer and supplier. Most often, however, the practice is for the equipment, subsystem, and commissioning tests to be performed by the supplier, and the acceptance tests to be performed by the buyer or user.<br />\n
          The purpose of this guide is to help users of SVCs carry out a field test program prior to placing an SVC into service. The major elements of a commissioning program are identified so that users can formulate a specific plan that is suited to their own SVC. Such a test program should cover the following:<br />\n
          a) Equipment tests within the SVC system<br />\n
          b) Tests of the various subsystems that comprise the SVC system<br />\n
          c) Commissioning tests for the complete SVC system<br />\n
          d) Acceptance testing of the complete SVC system<br />\n
          It should be recognized that there are many ways in which a particular SVC may be commissioned, and also that it is not the purpose of this guide to endorse a specific procedure to the exclusion of otherre<br />\n
          methods.<br />\n
          Depending on the purpose of the SVC design (transmission type or smaller size used for other purposes) some tests may not be required. In particular, some control system tests may be included in the factory tests. Also, acceptance tests may be integrated into any of the categories listed above.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for Static Var Compensator Field Tests"
        -notes: "Active"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#7943 …}
    #channels: Doctrine\ORM\PersistentCollection {#8104 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7519 …}
    #reviews: Doctrine\ORM\PersistentCollection {#8066 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#8118 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7681 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#7746 …}
    -apiLastModifiedAt: DateTime @1754517600 {#7530
      date: 2025-08-07 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1578006000 {#7496
      date: 2020-01-03 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @1314309600 {#7531
      date: 2011-08-26 00:00:00.0 Europe/Paris (+02:00)
    }
    -releasedAt: null
    -confirmedAt: null
    -canceledAt: null
    -edition: null
    -coreDocument: "1303"
    -bookCollection: ""
    -pageCount: 49
    -documents: Doctrine\ORM\PersistentCollection {#7786 …}
    -favorites: Doctrine\ORM\PersistentCollection {#7928 …}
  }
  +label: "Most Recent"
  +icon: "check-xs"
  -mostRecentAttributeCode: "most_recent"
  -localeContext: Sylius\Component\Locale\Context\CompositeLocaleContext {#1833 …}
}
ProductState App\Twig\Components\ProductState 140.0 MiB 0.25 ms
Input props
[
  "product" => App\Entity\Product\Product {#102375
    #id: 9281
    #code: "IEEE00001984"
    #attributes: Doctrine\ORM\PersistentCollection {#102356 …}
    #variants: Doctrine\ORM\PersistentCollection {#102353 …}
    #options: Doctrine\ORM\PersistentCollection {#102349 …}
    #associations: Doctrine\ORM\PersistentCollection {#102351 …}
    #createdAt: DateTime @1751038133 {#102382
      date: 2025-06-27 17:28:53.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1753969444 {#102355
      date: 2025-07-31 15:44:04.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#102366 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#102393
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#102375}
        #id: 32133
        #name: "IEEE 1303:1994 (R2000)"
        #slug: "ieee-1303-1994-r2000-ieee00001984-240933"
        #description: """
          New IEEE Standard - Superseded.<br />\n
          General guidelines and criteria for the field testing of static var compensators (SVCs) before they are placed in-service, for the purpose of verifying their specified performance are described. The major elements of a commissioning program are identified so that the user can formulate a specific plan that is most suited for his or her own SVC.<br />\n
          \t\t\t\t<br />\n
          This document is a guide for field testing and commissioning of static var compensators (SVCs). As such, the document establishes general guidelines and criteria for field testing to verify the specified performance of SVC systems. This guide does not Cover factory and simulator tests of SVC system components (but it assumes that such tests have been performed beforehand).Discuss the division of responsibility between user and supplier, since this division is usually defined in the contract between buyer and supplier. Most often, however, the practice is for the equipment, subsystem, and commissioning tests to be performed by the supplier, and the acceptance tests to be performed by the buyer or user.<br />\n
          The purpose of this guide is to help users of SVCs carry out a field test program prior to placing an SVC into service. The major elements of a commissioning program are identified so that the user can formulate a specific plan that is suited to his or her own SVC. Such a test program should cover the following:-- Equipment tests within the SVC system; -- Tests of the various subsystems that comprise the SVC system; -- Commissioning tests for the complete SVC system; -- Acceptance testing of the SVC system. It should be recognized that there are many ways in which a particular SVC may be commissioned, and also that it is not the purpose of this guide to endorse a specific procedure to the exclusion of other methods. Depending on the purpose of the SVC design (transmission type or smaller size used for other purposes) some tests may not be required. In particular, some control system tests may be included in the factory tests. Also, acceptance tests may be integrated into any of the categories listed above.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for Static Var Compensator Field Tests"
        -notes: "Superseded"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#102364 …}
    #channels: Doctrine\ORM\PersistentCollection {#102358 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7519 …}
    #reviews: Doctrine\ORM\PersistentCollection {#102362 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#102360 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7681 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#102373 …}
    -apiLastModifiedAt: DateTime @1743289200 {#102342
      date: 2025-03-30 00:00:00.0 Europe/Paris (+01:00)
    }
    -lastUpdatedAt: DateTime @1578006000 {#102381
      date: 2020-01-03 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @783903600 {#102380
      date: 1994-11-04 00:00:00.0 Europe/Paris (+01:00)
    }
    -releasedAt: null
    -confirmedAt: DateTime @954367200 {#102374
      date: 2000-03-30 00:00:00.0 Europe/Paris (+02:00)
    }
    -canceledAt: null
    -edition: null
    -coreDocument: "1303"
    -bookCollection: ""
    -pageCount: 32
    -documents: Doctrine\ORM\PersistentCollection {#102371 …}
    -favorites: Doctrine\ORM\PersistentCollection {#102369 …}
  }
  "showFullLabel" => "true"
]
Attributes
[
  "showFullLabel" => "true"
]
Component
App\Twig\Components\ProductState {#102429
  +product: App\Entity\Product\Product {#102375
    #id: 9281
    #code: "IEEE00001984"
    #attributes: Doctrine\ORM\PersistentCollection {#102356 …}
    #variants: Doctrine\ORM\PersistentCollection {#102353 …}
    #options: Doctrine\ORM\PersistentCollection {#102349 …}
    #associations: Doctrine\ORM\PersistentCollection {#102351 …}
    #createdAt: DateTime @1751038133 {#102382
      date: 2025-06-27 17:28:53.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1753969444 {#102355
      date: 2025-07-31 15:44:04.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#102366 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#102393
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#102375}
        #id: 32133
        #name: "IEEE 1303:1994 (R2000)"
        #slug: "ieee-1303-1994-r2000-ieee00001984-240933"
        #description: """
          New IEEE Standard - Superseded.<br />\n
          General guidelines and criteria for the field testing of static var compensators (SVCs) before they are placed in-service, for the purpose of verifying their specified performance are described. The major elements of a commissioning program are identified so that the user can formulate a specific plan that is most suited for his or her own SVC.<br />\n
          \t\t\t\t<br />\n
          This document is a guide for field testing and commissioning of static var compensators (SVCs). As such, the document establishes general guidelines and criteria for field testing to verify the specified performance of SVC systems. This guide does not Cover factory and simulator tests of SVC system components (but it assumes that such tests have been performed beforehand).Discuss the division of responsibility between user and supplier, since this division is usually defined in the contract between buyer and supplier. Most often, however, the practice is for the equipment, subsystem, and commissioning tests to be performed by the supplier, and the acceptance tests to be performed by the buyer or user.<br />\n
          The purpose of this guide is to help users of SVCs carry out a field test program prior to placing an SVC into service. The major elements of a commissioning program are identified so that the user can formulate a specific plan that is suited to his or her own SVC. Such a test program should cover the following:-- Equipment tests within the SVC system; -- Tests of the various subsystems that comprise the SVC system; -- Commissioning tests for the complete SVC system; -- Acceptance testing of the SVC system. It should be recognized that there are many ways in which a particular SVC may be commissioned, and also that it is not the purpose of this guide to endorse a specific procedure to the exclusion of other methods. Depending on the purpose of the SVC design (transmission type or smaller size used for other purposes) some tests may not be required. In particular, some control system tests may be included in the factory tests. Also, acceptance tests may be integrated into any of the categories listed above.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for Static Var Compensator Field Tests"
        -notes: "Superseded"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#102364 …}
    #channels: Doctrine\ORM\PersistentCollection {#102358 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7519 …}
    #reviews: Doctrine\ORM\PersistentCollection {#102362 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#102360 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7681 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#102373 …}
    -apiLastModifiedAt: DateTime @1743289200 {#102342
      date: 2025-03-30 00:00:00.0 Europe/Paris (+01:00)
    }
    -lastUpdatedAt: DateTime @1578006000 {#102381
      date: 2020-01-03 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @783903600 {#102380
      date: 1994-11-04 00:00:00.0 Europe/Paris (+01:00)
    }
    -releasedAt: null
    -confirmedAt: DateTime @954367200 {#102374
      date: 2000-03-30 00:00:00.0 Europe/Paris (+02:00)
    }
    -canceledAt: null
    -edition: null
    -coreDocument: "1303"
    -bookCollection: ""
    -pageCount: 32
    -documents: Doctrine\ORM\PersistentCollection {#102371 …}
    -favorites: Doctrine\ORM\PersistentCollection {#102369 …}
  }
  +appearance: "state-suspended"
  +labels: [
    "Superseded"
    "Confirmed"
  ]
  -stateAttributeCode: "state"
  -localeContext: Sylius\Component\Locale\Context\CompositeLocaleContext {#1833 …}
}
ProductMostRecent App\Twig\Components\ProductMostRecent 140.0 MiB 0.71 ms
Input props
[
  "product" => App\Entity\Product\Product {#102375
    #id: 9281
    #code: "IEEE00001984"
    #attributes: Doctrine\ORM\PersistentCollection {#102356 …}
    #variants: Doctrine\ORM\PersistentCollection {#102353 …}
    #options: Doctrine\ORM\PersistentCollection {#102349 …}
    #associations: Doctrine\ORM\PersistentCollection {#102351 …}
    #createdAt: DateTime @1751038133 {#102382
      date: 2025-06-27 17:28:53.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1753969444 {#102355
      date: 2025-07-31 15:44:04.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#102366 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#102393
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#102375}
        #id: 32133
        #name: "IEEE 1303:1994 (R2000)"
        #slug: "ieee-1303-1994-r2000-ieee00001984-240933"
        #description: """
          New IEEE Standard - Superseded.<br />\n
          General guidelines and criteria for the field testing of static var compensators (SVCs) before they are placed in-service, for the purpose of verifying their specified performance are described. The major elements of a commissioning program are identified so that the user can formulate a specific plan that is most suited for his or her own SVC.<br />\n
          \t\t\t\t<br />\n
          This document is a guide for field testing and commissioning of static var compensators (SVCs). As such, the document establishes general guidelines and criteria for field testing to verify the specified performance of SVC systems. This guide does not Cover factory and simulator tests of SVC system components (but it assumes that such tests have been performed beforehand).Discuss the division of responsibility between user and supplier, since this division is usually defined in the contract between buyer and supplier. Most often, however, the practice is for the equipment, subsystem, and commissioning tests to be performed by the supplier, and the acceptance tests to be performed by the buyer or user.<br />\n
          The purpose of this guide is to help users of SVCs carry out a field test program prior to placing an SVC into service. The major elements of a commissioning program are identified so that the user can formulate a specific plan that is suited to his or her own SVC. Such a test program should cover the following:-- Equipment tests within the SVC system; -- Tests of the various subsystems that comprise the SVC system; -- Commissioning tests for the complete SVC system; -- Acceptance testing of the SVC system. It should be recognized that there are many ways in which a particular SVC may be commissioned, and also that it is not the purpose of this guide to endorse a specific procedure to the exclusion of other methods. Depending on the purpose of the SVC design (transmission type or smaller size used for other purposes) some tests may not be required. In particular, some control system tests may be included in the factory tests. Also, acceptance tests may be integrated into any of the categories listed above.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for Static Var Compensator Field Tests"
        -notes: "Superseded"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#102364 …}
    #channels: Doctrine\ORM\PersistentCollection {#102358 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7519 …}
    #reviews: Doctrine\ORM\PersistentCollection {#102362 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#102360 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7681 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#102373 …}
    -apiLastModifiedAt: DateTime @1743289200 {#102342
      date: 2025-03-30 00:00:00.0 Europe/Paris (+01:00)
    }
    -lastUpdatedAt: DateTime @1578006000 {#102381
      date: 2020-01-03 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @783903600 {#102380
      date: 1994-11-04 00:00:00.0 Europe/Paris (+01:00)
    }
    -releasedAt: null
    -confirmedAt: DateTime @954367200 {#102374
      date: 2000-03-30 00:00:00.0 Europe/Paris (+02:00)
    }
    -canceledAt: null
    -edition: null
    -coreDocument: "1303"
    -bookCollection: ""
    -pageCount: 32
    -documents: Doctrine\ORM\PersistentCollection {#102371 …}
    -favorites: Doctrine\ORM\PersistentCollection {#102369 …}
  }
]
Attributes
[]
Component
App\Twig\Components\ProductMostRecent {#102500
  +product: App\Entity\Product\Product {#102375
    #id: 9281
    #code: "IEEE00001984"
    #attributes: Doctrine\ORM\PersistentCollection {#102356 …}
    #variants: Doctrine\ORM\PersistentCollection {#102353 …}
    #options: Doctrine\ORM\PersistentCollection {#102349 …}
    #associations: Doctrine\ORM\PersistentCollection {#102351 …}
    #createdAt: DateTime @1751038133 {#102382
      date: 2025-06-27 17:28:53.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1753969444 {#102355
      date: 2025-07-31 15:44:04.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#102366 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#102393
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#102375}
        #id: 32133
        #name: "IEEE 1303:1994 (R2000)"
        #slug: "ieee-1303-1994-r2000-ieee00001984-240933"
        #description: """
          New IEEE Standard - Superseded.<br />\n
          General guidelines and criteria for the field testing of static var compensators (SVCs) before they are placed in-service, for the purpose of verifying their specified performance are described. The major elements of a commissioning program are identified so that the user can formulate a specific plan that is most suited for his or her own SVC.<br />\n
          \t\t\t\t<br />\n
          This document is a guide for field testing and commissioning of static var compensators (SVCs). As such, the document establishes general guidelines and criteria for field testing to verify the specified performance of SVC systems. This guide does not Cover factory and simulator tests of SVC system components (but it assumes that such tests have been performed beforehand).Discuss the division of responsibility between user and supplier, since this division is usually defined in the contract between buyer and supplier. Most often, however, the practice is for the equipment, subsystem, and commissioning tests to be performed by the supplier, and the acceptance tests to be performed by the buyer or user.<br />\n
          The purpose of this guide is to help users of SVCs carry out a field test program prior to placing an SVC into service. The major elements of a commissioning program are identified so that the user can formulate a specific plan that is suited to his or her own SVC. Such a test program should cover the following:-- Equipment tests within the SVC system; -- Tests of the various subsystems that comprise the SVC system; -- Commissioning tests for the complete SVC system; -- Acceptance testing of the SVC system. It should be recognized that there are many ways in which a particular SVC may be commissioned, and also that it is not the purpose of this guide to endorse a specific procedure to the exclusion of other methods. Depending on the purpose of the SVC design (transmission type or smaller size used for other purposes) some tests may not be required. In particular, some control system tests may be included in the factory tests. Also, acceptance tests may be integrated into any of the categories listed above.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for Static Var Compensator Field Tests"
        -notes: "Superseded"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#102364 …}
    #channels: Doctrine\ORM\PersistentCollection {#102358 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7519 …}
    #reviews: Doctrine\ORM\PersistentCollection {#102362 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#102360 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7681 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#102373 …}
    -apiLastModifiedAt: DateTime @1743289200 {#102342
      date: 2025-03-30 00:00:00.0 Europe/Paris (+01:00)
    }
    -lastUpdatedAt: DateTime @1578006000 {#102381
      date: 2020-01-03 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @783903600 {#102380
      date: 1994-11-04 00:00:00.0 Europe/Paris (+01:00)
    }
    -releasedAt: null
    -confirmedAt: DateTime @954367200 {#102374
      date: 2000-03-30 00:00:00.0 Europe/Paris (+02:00)
    }
    -canceledAt: null
    -edition: null
    -coreDocument: "1303"
    -bookCollection: ""
    -pageCount: 32
    -documents: Doctrine\ORM\PersistentCollection {#102371 …}
    -favorites: Doctrine\ORM\PersistentCollection {#102369 …}
  }
  +label: "Historical"
  +icon: "historical"
  -mostRecentAttributeCode: "most_recent"
  -localeContext: Sylius\Component\Locale\Context\CompositeLocaleContext {#1833 …}
}
ProductState App\Twig\Components\ProductState 140.0 MiB 0.18 ms
Input props
[
  "product" => App\Entity\Product\Product {#7520
    #id: 10787
    #code: "IEEE00005006"
    #attributes: Doctrine\ORM\PersistentCollection {#8207 …}
    #variants: Doctrine\ORM\PersistentCollection {#8289 …}
    #options: Doctrine\ORM\PersistentCollection {#8628 …}
    #associations: Doctrine\ORM\PersistentCollection {#8585 …}
    #createdAt: DateTime @1751039283 {#7536
      date: 2025-06-27 17:48:03.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1754607611 {#7535
      date: 2025-08-08 01:00:11.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#8627 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#8612
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#7520}
        #id: 38157
        #name: "IEEE 1303:2011"
        #slug: "ieee-1303-2011-ieee00005006-242439"
        #description: """
          Revision Standard - Active.<br />\n
          General guidelines and criteria for the field testing of static var compensators (SVCs), before they are placed in-service, for the purpose of verifying their specified performance are described. The major elements of a commissioning program are identified so that the user can formulate a specific plan that is most suited for his or her own SVC.<br />\n
          \t\t\t\t<br />\n
          This document is a guide for field testing and commissioning of static var compensators (SVCs). As such, the document establishes general guidelines and criteria for field testing to verify the specified performance of SVC systems. Many clauses will be useful for compensator systems using gate turn-off (GTO) thyristor technology (static compensator [STATCOM]) or other semiconductor devices such as insulated gate commutated transistor (IGCT).<br />\n
          This guide does not<br />\n
          a) Cover factory and simulator tests of SVC system components (but it assumes that such tests have been performed beforehand).<br />\n
          b) Discuss the division of responsibility between user and supplier, since this division is usually defined in the contract between buyer and supplier. Most often, however, the practice is for the equipment, subsystem, and commissioning tests to be performed by the supplier, and the acceptance tests to be performed by the buyer or user.<br />\n
          The purpose of this guide is to help users of SVCs carry out a field test program prior to placing an SVC into service. The major elements of a commissioning program are identified so that users can formulate a specific plan that is suited to their own SVC. Such a test program should cover the following:<br />\n
          a) Equipment tests within the SVC system<br />\n
          b) Tests of the various subsystems that comprise the SVC system<br />\n
          c) Commissioning tests for the complete SVC system<br />\n
          d) Acceptance testing of the complete SVC system<br />\n
          It should be recognized that there are many ways in which a particular SVC may be commissioned, and also that it is not the purpose of this guide to endorse a specific procedure to the exclusion of otherre<br />\n
          methods.<br />\n
          Depending on the purpose of the SVC design (transmission type or smaller size used for other purposes) some tests may not be required. In particular, some control system tests may be included in the factory tests. Also, acceptance tests may be integrated into any of the categories listed above.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for Static Var Compensator Field Tests"
        -notes: "Active"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#7943 …}
    #channels: Doctrine\ORM\PersistentCollection {#8104 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7519 …}
    #reviews: Doctrine\ORM\PersistentCollection {#8066 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#8118 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7681 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#7746 …}
    -apiLastModifiedAt: DateTime @1754517600 {#7530
      date: 2025-08-07 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1578006000 {#7496
      date: 2020-01-03 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @1314309600 {#7531
      date: 2011-08-26 00:00:00.0 Europe/Paris (+02:00)
    }
    -releasedAt: null
    -confirmedAt: null
    -canceledAt: null
    -edition: null
    -coreDocument: "1303"
    -bookCollection: ""
    -pageCount: 49
    -documents: Doctrine\ORM\PersistentCollection {#7786 …}
    -favorites: Doctrine\ORM\PersistentCollection {#7928 …}
  }
  "showFullLabel" => "true"
]
Attributes
[
  "showFullLabel" => "true"
]
Component
App\Twig\Components\ProductState {#108949
  +product: App\Entity\Product\Product {#7520
    #id: 10787
    #code: "IEEE00005006"
    #attributes: Doctrine\ORM\PersistentCollection {#8207 …}
    #variants: Doctrine\ORM\PersistentCollection {#8289 …}
    #options: Doctrine\ORM\PersistentCollection {#8628 …}
    #associations: Doctrine\ORM\PersistentCollection {#8585 …}
    #createdAt: DateTime @1751039283 {#7536
      date: 2025-06-27 17:48:03.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1754607611 {#7535
      date: 2025-08-08 01:00:11.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#8627 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#8612
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#7520}
        #id: 38157
        #name: "IEEE 1303:2011"
        #slug: "ieee-1303-2011-ieee00005006-242439"
        #description: """
          Revision Standard - Active.<br />\n
          General guidelines and criteria for the field testing of static var compensators (SVCs), before they are placed in-service, for the purpose of verifying their specified performance are described. The major elements of a commissioning program are identified so that the user can formulate a specific plan that is most suited for his or her own SVC.<br />\n
          \t\t\t\t<br />\n
          This document is a guide for field testing and commissioning of static var compensators (SVCs). As such, the document establishes general guidelines and criteria for field testing to verify the specified performance of SVC systems. Many clauses will be useful for compensator systems using gate turn-off (GTO) thyristor technology (static compensator [STATCOM]) or other semiconductor devices such as insulated gate commutated transistor (IGCT).<br />\n
          This guide does not<br />\n
          a) Cover factory and simulator tests of SVC system components (but it assumes that such tests have been performed beforehand).<br />\n
          b) Discuss the division of responsibility between user and supplier, since this division is usually defined in the contract between buyer and supplier. Most often, however, the practice is for the equipment, subsystem, and commissioning tests to be performed by the supplier, and the acceptance tests to be performed by the buyer or user.<br />\n
          The purpose of this guide is to help users of SVCs carry out a field test program prior to placing an SVC into service. The major elements of a commissioning program are identified so that users can formulate a specific plan that is suited to their own SVC. Such a test program should cover the following:<br />\n
          a) Equipment tests within the SVC system<br />\n
          b) Tests of the various subsystems that comprise the SVC system<br />\n
          c) Commissioning tests for the complete SVC system<br />\n
          d) Acceptance testing of the complete SVC system<br />\n
          It should be recognized that there are many ways in which a particular SVC may be commissioned, and also that it is not the purpose of this guide to endorse a specific procedure to the exclusion of otherre<br />\n
          methods.<br />\n
          Depending on the purpose of the SVC design (transmission type or smaller size used for other purposes) some tests may not be required. In particular, some control system tests may be included in the factory tests. Also, acceptance tests may be integrated into any of the categories listed above.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for Static Var Compensator Field Tests"
        -notes: "Active"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#7943 …}
    #channels: Doctrine\ORM\PersistentCollection {#8104 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7519 …}
    #reviews: Doctrine\ORM\PersistentCollection {#8066 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#8118 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7681 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#7746 …}
    -apiLastModifiedAt: DateTime @1754517600 {#7530
      date: 2025-08-07 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1578006000 {#7496
      date: 2020-01-03 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @1314309600 {#7531
      date: 2011-08-26 00:00:00.0 Europe/Paris (+02:00)
    }
    -releasedAt: null
    -confirmedAt: null
    -canceledAt: null
    -edition: null
    -coreDocument: "1303"
    -bookCollection: ""
    -pageCount: 49
    -documents: Doctrine\ORM\PersistentCollection {#7786 …}
    -favorites: Doctrine\ORM\PersistentCollection {#7928 …}
  }
  +appearance: "state-active"
  +labels: [
    "Active"
  ]
  -stateAttributeCode: "state"
  -localeContext: Sylius\Component\Locale\Context\CompositeLocaleContext {#1833 …}
}
ProductMostRecent App\Twig\Components\ProductMostRecent 140.0 MiB 0.78 ms
Input props
[
  "product" => App\Entity\Product\Product {#7520
    #id: 10787
    #code: "IEEE00005006"
    #attributes: Doctrine\ORM\PersistentCollection {#8207 …}
    #variants: Doctrine\ORM\PersistentCollection {#8289 …}
    #options: Doctrine\ORM\PersistentCollection {#8628 …}
    #associations: Doctrine\ORM\PersistentCollection {#8585 …}
    #createdAt: DateTime @1751039283 {#7536
      date: 2025-06-27 17:48:03.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1754607611 {#7535
      date: 2025-08-08 01:00:11.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#8627 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#8612
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#7520}
        #id: 38157
        #name: "IEEE 1303:2011"
        #slug: "ieee-1303-2011-ieee00005006-242439"
        #description: """
          Revision Standard - Active.<br />\n
          General guidelines and criteria for the field testing of static var compensators (SVCs), before they are placed in-service, for the purpose of verifying their specified performance are described. The major elements of a commissioning program are identified so that the user can formulate a specific plan that is most suited for his or her own SVC.<br />\n
          \t\t\t\t<br />\n
          This document is a guide for field testing and commissioning of static var compensators (SVCs). As such, the document establishes general guidelines and criteria for field testing to verify the specified performance of SVC systems. Many clauses will be useful for compensator systems using gate turn-off (GTO) thyristor technology (static compensator [STATCOM]) or other semiconductor devices such as insulated gate commutated transistor (IGCT).<br />\n
          This guide does not<br />\n
          a) Cover factory and simulator tests of SVC system components (but it assumes that such tests have been performed beforehand).<br />\n
          b) Discuss the division of responsibility between user and supplier, since this division is usually defined in the contract between buyer and supplier. Most often, however, the practice is for the equipment, subsystem, and commissioning tests to be performed by the supplier, and the acceptance tests to be performed by the buyer or user.<br />\n
          The purpose of this guide is to help users of SVCs carry out a field test program prior to placing an SVC into service. The major elements of a commissioning program are identified so that users can formulate a specific plan that is suited to their own SVC. Such a test program should cover the following:<br />\n
          a) Equipment tests within the SVC system<br />\n
          b) Tests of the various subsystems that comprise the SVC system<br />\n
          c) Commissioning tests for the complete SVC system<br />\n
          d) Acceptance testing of the complete SVC system<br />\n
          It should be recognized that there are many ways in which a particular SVC may be commissioned, and also that it is not the purpose of this guide to endorse a specific procedure to the exclusion of otherre<br />\n
          methods.<br />\n
          Depending on the purpose of the SVC design (transmission type or smaller size used for other purposes) some tests may not be required. In particular, some control system tests may be included in the factory tests. Also, acceptance tests may be integrated into any of the categories listed above.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for Static Var Compensator Field Tests"
        -notes: "Active"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#7943 …}
    #channels: Doctrine\ORM\PersistentCollection {#8104 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7519 …}
    #reviews: Doctrine\ORM\PersistentCollection {#8066 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#8118 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7681 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#7746 …}
    -apiLastModifiedAt: DateTime @1754517600 {#7530
      date: 2025-08-07 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1578006000 {#7496
      date: 2020-01-03 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @1314309600 {#7531
      date: 2011-08-26 00:00:00.0 Europe/Paris (+02:00)
    }
    -releasedAt: null
    -confirmedAt: null
    -canceledAt: null
    -edition: null
    -coreDocument: "1303"
    -bookCollection: ""
    -pageCount: 49
    -documents: Doctrine\ORM\PersistentCollection {#7786 …}
    -favorites: Doctrine\ORM\PersistentCollection {#7928 …}
  }
]
Attributes
[]
Component
App\Twig\Components\ProductMostRecent {#108991
  +product: App\Entity\Product\Product {#7520
    #id: 10787
    #code: "IEEE00005006"
    #attributes: Doctrine\ORM\PersistentCollection {#8207 …}
    #variants: Doctrine\ORM\PersistentCollection {#8289 …}
    #options: Doctrine\ORM\PersistentCollection {#8628 …}
    #associations: Doctrine\ORM\PersistentCollection {#8585 …}
    #createdAt: DateTime @1751039283 {#7536
      date: 2025-06-27 17:48:03.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1754607611 {#7535
      date: 2025-08-08 01:00:11.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#8627 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#8612
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#7520}
        #id: 38157
        #name: "IEEE 1303:2011"
        #slug: "ieee-1303-2011-ieee00005006-242439"
        #description: """
          Revision Standard - Active.<br />\n
          General guidelines and criteria for the field testing of static var compensators (SVCs), before they are placed in-service, for the purpose of verifying their specified performance are described. The major elements of a commissioning program are identified so that the user can formulate a specific plan that is most suited for his or her own SVC.<br />\n
          \t\t\t\t<br />\n
          This document is a guide for field testing and commissioning of static var compensators (SVCs). As such, the document establishes general guidelines and criteria for field testing to verify the specified performance of SVC systems. Many clauses will be useful for compensator systems using gate turn-off (GTO) thyristor technology (static compensator [STATCOM]) or other semiconductor devices such as insulated gate commutated transistor (IGCT).<br />\n
          This guide does not<br />\n
          a) Cover factory and simulator tests of SVC system components (but it assumes that such tests have been performed beforehand).<br />\n
          b) Discuss the division of responsibility between user and supplier, since this division is usually defined in the contract between buyer and supplier. Most often, however, the practice is for the equipment, subsystem, and commissioning tests to be performed by the supplier, and the acceptance tests to be performed by the buyer or user.<br />\n
          The purpose of this guide is to help users of SVCs carry out a field test program prior to placing an SVC into service. The major elements of a commissioning program are identified so that users can formulate a specific plan that is suited to their own SVC. Such a test program should cover the following:<br />\n
          a) Equipment tests within the SVC system<br />\n
          b) Tests of the various subsystems that comprise the SVC system<br />\n
          c) Commissioning tests for the complete SVC system<br />\n
          d) Acceptance testing of the complete SVC system<br />\n
          It should be recognized that there are many ways in which a particular SVC may be commissioned, and also that it is not the purpose of this guide to endorse a specific procedure to the exclusion of otherre<br />\n
          methods.<br />\n
          Depending on the purpose of the SVC design (transmission type or smaller size used for other purposes) some tests may not be required. In particular, some control system tests may be included in the factory tests. Also, acceptance tests may be integrated into any of the categories listed above.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for Static Var Compensator Field Tests"
        -notes: "Active"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#7943 …}
    #channels: Doctrine\ORM\PersistentCollection {#8104 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7519 …}
    #reviews: Doctrine\ORM\PersistentCollection {#8066 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#8118 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7681 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#7746 …}
    -apiLastModifiedAt: DateTime @1754517600 {#7530
      date: 2025-08-07 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1578006000 {#7496
      date: 2020-01-03 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @1314309600 {#7531
      date: 2011-08-26 00:00:00.0 Europe/Paris (+02:00)
    }
    -releasedAt: null
    -confirmedAt: null
    -canceledAt: null
    -edition: null
    -coreDocument: "1303"
    -bookCollection: ""
    -pageCount: 49
    -documents: Doctrine\ORM\PersistentCollection {#7786 …}
    -favorites: Doctrine\ORM\PersistentCollection {#7928 …}
  }
  +label: "Most Recent"
  +icon: "check-xs"
  -mostRecentAttributeCode: "most_recent"
  -localeContext: Sylius\Component\Locale\Context\CompositeLocaleContext {#1833 …}
}
ProductState App\Twig\Components\ProductState 140.0 MiB 0.22 ms
Input props
[
  "product" => App\Entity\Product\Product {#102375
    #id: 9281
    #code: "IEEE00001984"
    #attributes: Doctrine\ORM\PersistentCollection {#102356 …}
    #variants: Doctrine\ORM\PersistentCollection {#102353 …}
    #options: Doctrine\ORM\PersistentCollection {#102349 …}
    #associations: Doctrine\ORM\PersistentCollection {#102351 …}
    #createdAt: DateTime @1751038133 {#102382
      date: 2025-06-27 17:28:53.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1753969444 {#102355
      date: 2025-07-31 15:44:04.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#102366 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#102393
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#102375}
        #id: 32133
        #name: "IEEE 1303:1994 (R2000)"
        #slug: "ieee-1303-1994-r2000-ieee00001984-240933"
        #description: """
          New IEEE Standard - Superseded.<br />\n
          General guidelines and criteria for the field testing of static var compensators (SVCs) before they are placed in-service, for the purpose of verifying their specified performance are described. The major elements of a commissioning program are identified so that the user can formulate a specific plan that is most suited for his or her own SVC.<br />\n
          \t\t\t\t<br />\n
          This document is a guide for field testing and commissioning of static var compensators (SVCs). As such, the document establishes general guidelines and criteria for field testing to verify the specified performance of SVC systems. This guide does not Cover factory and simulator tests of SVC system components (but it assumes that such tests have been performed beforehand).Discuss the division of responsibility between user and supplier, since this division is usually defined in the contract between buyer and supplier. Most often, however, the practice is for the equipment, subsystem, and commissioning tests to be performed by the supplier, and the acceptance tests to be performed by the buyer or user.<br />\n
          The purpose of this guide is to help users of SVCs carry out a field test program prior to placing an SVC into service. The major elements of a commissioning program are identified so that the user can formulate a specific plan that is suited to his or her own SVC. Such a test program should cover the following:-- Equipment tests within the SVC system; -- Tests of the various subsystems that comprise the SVC system; -- Commissioning tests for the complete SVC system; -- Acceptance testing of the SVC system. It should be recognized that there are many ways in which a particular SVC may be commissioned, and also that it is not the purpose of this guide to endorse a specific procedure to the exclusion of other methods. Depending on the purpose of the SVC design (transmission type or smaller size used for other purposes) some tests may not be required. In particular, some control system tests may be included in the factory tests. Also, acceptance tests may be integrated into any of the categories listed above.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for Static Var Compensator Field Tests"
        -notes: "Superseded"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#102364 …}
    #channels: Doctrine\ORM\PersistentCollection {#102358 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7519 …}
    #reviews: Doctrine\ORM\PersistentCollection {#102362 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#102360 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7681 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#102373 …}
    -apiLastModifiedAt: DateTime @1743289200 {#102342
      date: 2025-03-30 00:00:00.0 Europe/Paris (+01:00)
    }
    -lastUpdatedAt: DateTime @1578006000 {#102381
      date: 2020-01-03 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @783903600 {#102380
      date: 1994-11-04 00:00:00.0 Europe/Paris (+01:00)
    }
    -releasedAt: null
    -confirmedAt: DateTime @954367200 {#102374
      date: 2000-03-30 00:00:00.0 Europe/Paris (+02:00)
    }
    -canceledAt: null
    -edition: null
    -coreDocument: "1303"
    -bookCollection: ""
    -pageCount: 32
    -documents: Doctrine\ORM\PersistentCollection {#102371 …}
    -favorites: Doctrine\ORM\PersistentCollection {#102369 …}
  }
  "showFullLabel" => "true"
]
Attributes
[
  "showFullLabel" => "true"
]
Component
App\Twig\Components\ProductState {#109056
  +product: App\Entity\Product\Product {#102375
    #id: 9281
    #code: "IEEE00001984"
    #attributes: Doctrine\ORM\PersistentCollection {#102356 …}
    #variants: Doctrine\ORM\PersistentCollection {#102353 …}
    #options: Doctrine\ORM\PersistentCollection {#102349 …}
    #associations: Doctrine\ORM\PersistentCollection {#102351 …}
    #createdAt: DateTime @1751038133 {#102382
      date: 2025-06-27 17:28:53.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1753969444 {#102355
      date: 2025-07-31 15:44:04.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#102366 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#102393
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#102375}
        #id: 32133
        #name: "IEEE 1303:1994 (R2000)"
        #slug: "ieee-1303-1994-r2000-ieee00001984-240933"
        #description: """
          New IEEE Standard - Superseded.<br />\n
          General guidelines and criteria for the field testing of static var compensators (SVCs) before they are placed in-service, for the purpose of verifying their specified performance are described. The major elements of a commissioning program are identified so that the user can formulate a specific plan that is most suited for his or her own SVC.<br />\n
          \t\t\t\t<br />\n
          This document is a guide for field testing and commissioning of static var compensators (SVCs). As such, the document establishes general guidelines and criteria for field testing to verify the specified performance of SVC systems. This guide does not Cover factory and simulator tests of SVC system components (but it assumes that such tests have been performed beforehand).Discuss the division of responsibility between user and supplier, since this division is usually defined in the contract between buyer and supplier. Most often, however, the practice is for the equipment, subsystem, and commissioning tests to be performed by the supplier, and the acceptance tests to be performed by the buyer or user.<br />\n
          The purpose of this guide is to help users of SVCs carry out a field test program prior to placing an SVC into service. The major elements of a commissioning program are identified so that the user can formulate a specific plan that is suited to his or her own SVC. Such a test program should cover the following:-- Equipment tests within the SVC system; -- Tests of the various subsystems that comprise the SVC system; -- Commissioning tests for the complete SVC system; -- Acceptance testing of the SVC system. It should be recognized that there are many ways in which a particular SVC may be commissioned, and also that it is not the purpose of this guide to endorse a specific procedure to the exclusion of other methods. Depending on the purpose of the SVC design (transmission type or smaller size used for other purposes) some tests may not be required. In particular, some control system tests may be included in the factory tests. Also, acceptance tests may be integrated into any of the categories listed above.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for Static Var Compensator Field Tests"
        -notes: "Superseded"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#102364 …}
    #channels: Doctrine\ORM\PersistentCollection {#102358 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7519 …}
    #reviews: Doctrine\ORM\PersistentCollection {#102362 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#102360 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7681 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#102373 …}
    -apiLastModifiedAt: DateTime @1743289200 {#102342
      date: 2025-03-30 00:00:00.0 Europe/Paris (+01:00)
    }
    -lastUpdatedAt: DateTime @1578006000 {#102381
      date: 2020-01-03 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @783903600 {#102380
      date: 1994-11-04 00:00:00.0 Europe/Paris (+01:00)
    }
    -releasedAt: null
    -confirmedAt: DateTime @954367200 {#102374
      date: 2000-03-30 00:00:00.0 Europe/Paris (+02:00)
    }
    -canceledAt: null
    -edition: null
    -coreDocument: "1303"
    -bookCollection: ""
    -pageCount: 32
    -documents: Doctrine\ORM\PersistentCollection {#102371 …}
    -favorites: Doctrine\ORM\PersistentCollection {#102369 …}
  }
  +appearance: "state-suspended"
  +labels: [
    "Superseded"
    "Confirmed"
  ]
  -stateAttributeCode: "state"
  -localeContext: Sylius\Component\Locale\Context\CompositeLocaleContext {#1833 …}
}
ProductMostRecent App\Twig\Components\ProductMostRecent 140.0 MiB 0.71 ms
Input props
[
  "product" => App\Entity\Product\Product {#102375
    #id: 9281
    #code: "IEEE00001984"
    #attributes: Doctrine\ORM\PersistentCollection {#102356 …}
    #variants: Doctrine\ORM\PersistentCollection {#102353 …}
    #options: Doctrine\ORM\PersistentCollection {#102349 …}
    #associations: Doctrine\ORM\PersistentCollection {#102351 …}
    #createdAt: DateTime @1751038133 {#102382
      date: 2025-06-27 17:28:53.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1753969444 {#102355
      date: 2025-07-31 15:44:04.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#102366 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#102393
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#102375}
        #id: 32133
        #name: "IEEE 1303:1994 (R2000)"
        #slug: "ieee-1303-1994-r2000-ieee00001984-240933"
        #description: """
          New IEEE Standard - Superseded.<br />\n
          General guidelines and criteria for the field testing of static var compensators (SVCs) before they are placed in-service, for the purpose of verifying their specified performance are described. The major elements of a commissioning program are identified so that the user can formulate a specific plan that is most suited for his or her own SVC.<br />\n
          \t\t\t\t<br />\n
          This document is a guide for field testing and commissioning of static var compensators (SVCs). As such, the document establishes general guidelines and criteria for field testing to verify the specified performance of SVC systems. This guide does not Cover factory and simulator tests of SVC system components (but it assumes that such tests have been performed beforehand).Discuss the division of responsibility between user and supplier, since this division is usually defined in the contract between buyer and supplier. Most often, however, the practice is for the equipment, subsystem, and commissioning tests to be performed by the supplier, and the acceptance tests to be performed by the buyer or user.<br />\n
          The purpose of this guide is to help users of SVCs carry out a field test program prior to placing an SVC into service. The major elements of a commissioning program are identified so that the user can formulate a specific plan that is suited to his or her own SVC. Such a test program should cover the following:-- Equipment tests within the SVC system; -- Tests of the various subsystems that comprise the SVC system; -- Commissioning tests for the complete SVC system; -- Acceptance testing of the SVC system. It should be recognized that there are many ways in which a particular SVC may be commissioned, and also that it is not the purpose of this guide to endorse a specific procedure to the exclusion of other methods. Depending on the purpose of the SVC design (transmission type or smaller size used for other purposes) some tests may not be required. In particular, some control system tests may be included in the factory tests. Also, acceptance tests may be integrated into any of the categories listed above.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for Static Var Compensator Field Tests"
        -notes: "Superseded"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#102364 …}
    #channels: Doctrine\ORM\PersistentCollection {#102358 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7519 …}
    #reviews: Doctrine\ORM\PersistentCollection {#102362 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#102360 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7681 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#102373 …}
    -apiLastModifiedAt: DateTime @1743289200 {#102342
      date: 2025-03-30 00:00:00.0 Europe/Paris (+01:00)
    }
    -lastUpdatedAt: DateTime @1578006000 {#102381
      date: 2020-01-03 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @783903600 {#102380
      date: 1994-11-04 00:00:00.0 Europe/Paris (+01:00)
    }
    -releasedAt: null
    -confirmedAt: DateTime @954367200 {#102374
      date: 2000-03-30 00:00:00.0 Europe/Paris (+02:00)
    }
    -canceledAt: null
    -edition: null
    -coreDocument: "1303"
    -bookCollection: ""
    -pageCount: 32
    -documents: Doctrine\ORM\PersistentCollection {#102371 …}
    -favorites: Doctrine\ORM\PersistentCollection {#102369 …}
  }
]
Attributes
[]
Component
App\Twig\Components\ProductMostRecent {#109083
  +product: App\Entity\Product\Product {#102375
    #id: 9281
    #code: "IEEE00001984"
    #attributes: Doctrine\ORM\PersistentCollection {#102356 …}
    #variants: Doctrine\ORM\PersistentCollection {#102353 …}
    #options: Doctrine\ORM\PersistentCollection {#102349 …}
    #associations: Doctrine\ORM\PersistentCollection {#102351 …}
    #createdAt: DateTime @1751038133 {#102382
      date: 2025-06-27 17:28:53.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1753969444 {#102355
      date: 2025-07-31 15:44:04.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#102366 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#102393
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#102375}
        #id: 32133
        #name: "IEEE 1303:1994 (R2000)"
        #slug: "ieee-1303-1994-r2000-ieee00001984-240933"
        #description: """
          New IEEE Standard - Superseded.<br />\n
          General guidelines and criteria for the field testing of static var compensators (SVCs) before they are placed in-service, for the purpose of verifying their specified performance are described. The major elements of a commissioning program are identified so that the user can formulate a specific plan that is most suited for his or her own SVC.<br />\n
          \t\t\t\t<br />\n
          This document is a guide for field testing and commissioning of static var compensators (SVCs). As such, the document establishes general guidelines and criteria for field testing to verify the specified performance of SVC systems. This guide does not Cover factory and simulator tests of SVC system components (but it assumes that such tests have been performed beforehand).Discuss the division of responsibility between user and supplier, since this division is usually defined in the contract between buyer and supplier. Most often, however, the practice is for the equipment, subsystem, and commissioning tests to be performed by the supplier, and the acceptance tests to be performed by the buyer or user.<br />\n
          The purpose of this guide is to help users of SVCs carry out a field test program prior to placing an SVC into service. The major elements of a commissioning program are identified so that the user can formulate a specific plan that is suited to his or her own SVC. Such a test program should cover the following:-- Equipment tests within the SVC system; -- Tests of the various subsystems that comprise the SVC system; -- Commissioning tests for the complete SVC system; -- Acceptance testing of the SVC system. It should be recognized that there are many ways in which a particular SVC may be commissioned, and also that it is not the purpose of this guide to endorse a specific procedure to the exclusion of other methods. Depending on the purpose of the SVC design (transmission type or smaller size used for other purposes) some tests may not be required. In particular, some control system tests may be included in the factory tests. Also, acceptance tests may be integrated into any of the categories listed above.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for Static Var Compensator Field Tests"
        -notes: "Superseded"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#102364 …}
    #channels: Doctrine\ORM\PersistentCollection {#102358 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7519 …}
    #reviews: Doctrine\ORM\PersistentCollection {#102362 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#102360 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7681 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#102373 …}
    -apiLastModifiedAt: DateTime @1743289200 {#102342
      date: 2025-03-30 00:00:00.0 Europe/Paris (+01:00)
    }
    -lastUpdatedAt: DateTime @1578006000 {#102381
      date: 2020-01-03 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @783903600 {#102380
      date: 1994-11-04 00:00:00.0 Europe/Paris (+01:00)
    }
    -releasedAt: null
    -confirmedAt: DateTime @954367200 {#102374
      date: 2000-03-30 00:00:00.0 Europe/Paris (+02:00)
    }
    -canceledAt: null
    -edition: null
    -coreDocument: "1303"
    -bookCollection: ""
    -pageCount: 32
    -documents: Doctrine\ORM\PersistentCollection {#102371 …}
    -favorites: Doctrine\ORM\PersistentCollection {#102369 …}
  }
  +label: "Historical"
  +icon: "historical"
  -mostRecentAttributeCode: "most_recent"
  -localeContext: Sylius\Component\Locale\Context\CompositeLocaleContext {#1833 …}
}
ProductCard App\Twig\Components\ProductCard 140.0 MiB 12.01 ms
Input props
[
  "product" => App\Entity\Product\Product {#130545
    #id: 8625
    #code: "IEEE00000764"
    #attributes: Doctrine\ORM\PersistentCollection {#130569 …}
    #variants: Doctrine\ORM\PersistentCollection {#130567 …}
    #options: Doctrine\ORM\PersistentCollection {#130562 …}
    #associations: Doctrine\ORM\PersistentCollection {#130565 …}
    #createdAt: DateTime @1751037573 {#130558
      date: 2025-06-27 17:19:33.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1754606304 {#130551
      date: 2025-08-08 00:38:24.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#130580 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#130669
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#130545}
        #id: 29509
        #name: "IEEE 519:1992"
        #slug: "ieee-519-1992-ieee00000764-240277"
        #description: """
          Revision Standard - Superseded.<br />\n
          This guide applies to all types of static power converters used in industrial and commercial power systems. The problems involved in the harmonic control and reactive compensation of such converters are addressed, and an application guide is provided. Limits of disturbances to the ac power distribution system that affect other equipment and communications are recommended. This guide is not intended to cover the effect of radio frequency interference.<br />\n
          \t\t\t\t<br />\n
          This recommended practice intends to establish goals for the design of electrical systems that include both linear and nonlinear loads. The voltage and current waveforms that may exist throughout the system are described, and waveform distortion goals for the system designer are established. The interface between sources and loads is described as the point of common coupling; and observance of the design goals will minimize interference between electrical equipment. This recommended practice addresses steady-state limitation. Transient conditions exceeding these limitations may be encountered. This document sets the quality of power that is to be provided at the point of common coupling. This document does not cover the effects of radio-frequency interference; however, it does include electromagnetic interference with communication systems.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Recommended Practices and Requirements for Harmonic Control in Electrical Power Systems"
        -notes: "Superseded"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#130578 …}
    #channels: Doctrine\ORM\PersistentCollection {#130571 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7519 …}
    #reviews: Doctrine\ORM\PersistentCollection {#130575 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#130573 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7681 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#130585 …}
    -apiLastModifiedAt: DateTime @1754517600 {#130544
      date: 2025-08-07 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1578006000 {#130593
      date: 2020-01-03 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @734306400 {#130564
      date: 1993-04-09 00:00:00.0 Europe/Paris (+02:00)
    }
    -releasedAt: null
    -confirmedAt: null
    -canceledAt: null
    -edition: null
    -coreDocument: "519"
    -bookCollection: ""
    -pageCount: 112
    -documents: Doctrine\ORM\PersistentCollection {#130584 …}
    -favorites: Doctrine\ORM\PersistentCollection {#130582 …}
  }
  "layout" => "vertical"
  "showPrice" => true
  "showStatusBadges" => true
  "additionalClasses" => "product__teaser--with-grey-border"
  "hasStretchedLink" => true
  "hoverType" => "shadow"
  "linkLabel" => "See more"
]
Attributes
[]
Component
App\Twig\Components\ProductCard {#130637
  +product: App\Entity\Product\Product {#130545
    #id: 8625
    #code: "IEEE00000764"
    #attributes: Doctrine\ORM\PersistentCollection {#130569 …}
    #variants: Doctrine\ORM\PersistentCollection {#130567 …}
    #options: Doctrine\ORM\PersistentCollection {#130562 …}
    #associations: Doctrine\ORM\PersistentCollection {#130565 …}
    #createdAt: DateTime @1751037573 {#130558
      date: 2025-06-27 17:19:33.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1754606304 {#130551
      date: 2025-08-08 00:38:24.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#130580 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#130669
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#130545}
        #id: 29509
        #name: "IEEE 519:1992"
        #slug: "ieee-519-1992-ieee00000764-240277"
        #description: """
          Revision Standard - Superseded.<br />\n
          This guide applies to all types of static power converters used in industrial and commercial power systems. The problems involved in the harmonic control and reactive compensation of such converters are addressed, and an application guide is provided. Limits of disturbances to the ac power distribution system that affect other equipment and communications are recommended. This guide is not intended to cover the effect of radio frequency interference.<br />\n
          \t\t\t\t<br />\n
          This recommended practice intends to establish goals for the design of electrical systems that include both linear and nonlinear loads. The voltage and current waveforms that may exist throughout the system are described, and waveform distortion goals for the system designer are established. The interface between sources and loads is described as the point of common coupling; and observance of the design goals will minimize interference between electrical equipment. This recommended practice addresses steady-state limitation. Transient conditions exceeding these limitations may be encountered. This document sets the quality of power that is to be provided at the point of common coupling. This document does not cover the effects of radio-frequency interference; however, it does include electromagnetic interference with communication systems.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Recommended Practices and Requirements for Harmonic Control in Electrical Power Systems"
        -notes: "Superseded"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#130578 …}
    #channels: Doctrine\ORM\PersistentCollection {#130571 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7519 …}
    #reviews: Doctrine\ORM\PersistentCollection {#130575 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#130573 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7681 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#130585 …}
    -apiLastModifiedAt: DateTime @1754517600 {#130544
      date: 2025-08-07 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1578006000 {#130593
      date: 2020-01-03 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @734306400 {#130564
      date: 1993-04-09 00:00:00.0 Europe/Paris (+02:00)
    }
    -releasedAt: null
    -confirmedAt: null
    -canceledAt: null
    -edition: null
    -coreDocument: "519"
    -bookCollection: ""
    -pageCount: 112
    -documents: Doctrine\ORM\PersistentCollection {#130584 …}
    -favorites: Doctrine\ORM\PersistentCollection {#130582 …}
  }
  +layout: "vertical"
  +showPrice: true
  +showStatusBadges: true
  +additionalClasses: "product__teaser--with-grey-border"
  +linkLabel: "See more"
  +imageFilter: "product_thumbnail_teaser"
  +hasStretchedLink: true
  +backgroundColor: "white"
  +hoverType: "shadow"
}
ProductState App\Twig\Components\ProductState 140.0 MiB 0.27 ms
Input props
[
  "product" => App\Entity\Product\Product {#130545
    #id: 8625
    #code: "IEEE00000764"
    #attributes: Doctrine\ORM\PersistentCollection {#130569 …}
    #variants: Doctrine\ORM\PersistentCollection {#130567 …}
    #options: Doctrine\ORM\PersistentCollection {#130562 …}
    #associations: Doctrine\ORM\PersistentCollection {#130565 …}
    #createdAt: DateTime @1751037573 {#130558
      date: 2025-06-27 17:19:33.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1754606304 {#130551
      date: 2025-08-08 00:38:24.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#130580 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#130669
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#130545}
        #id: 29509
        #name: "IEEE 519:1992"
        #slug: "ieee-519-1992-ieee00000764-240277"
        #description: """
          Revision Standard - Superseded.<br />\n
          This guide applies to all types of static power converters used in industrial and commercial power systems. The problems involved in the harmonic control and reactive compensation of such converters are addressed, and an application guide is provided. Limits of disturbances to the ac power distribution system that affect other equipment and communications are recommended. This guide is not intended to cover the effect of radio frequency interference.<br />\n
          \t\t\t\t<br />\n
          This recommended practice intends to establish goals for the design of electrical systems that include both linear and nonlinear loads. The voltage and current waveforms that may exist throughout the system are described, and waveform distortion goals for the system designer are established. The interface between sources and loads is described as the point of common coupling; and observance of the design goals will minimize interference between electrical equipment. This recommended practice addresses steady-state limitation. Transient conditions exceeding these limitations may be encountered. This document sets the quality of power that is to be provided at the point of common coupling. This document does not cover the effects of radio-frequency interference; however, it does include electromagnetic interference with communication systems.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Recommended Practices and Requirements for Harmonic Control in Electrical Power Systems"
        -notes: "Superseded"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#130578 …}
    #channels: Doctrine\ORM\PersistentCollection {#130571 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7519 …}
    #reviews: Doctrine\ORM\PersistentCollection {#130575 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#130573 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7681 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#130585 …}
    -apiLastModifiedAt: DateTime @1754517600 {#130544
      date: 2025-08-07 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1578006000 {#130593
      date: 2020-01-03 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @734306400 {#130564
      date: 1993-04-09 00:00:00.0 Europe/Paris (+02:00)
    }
    -releasedAt: null
    -confirmedAt: null
    -canceledAt: null
    -edition: null
    -coreDocument: "519"
    -bookCollection: ""
    -pageCount: 112
    -documents: Doctrine\ORM\PersistentCollection {#130584 …}
    -favorites: Doctrine\ORM\PersistentCollection {#130582 …}
  }
]
Attributes
[
  "showFullLabel" => false
]
Component
App\Twig\Components\ProductState {#130673
  +product: App\Entity\Product\Product {#130545
    #id: 8625
    #code: "IEEE00000764"
    #attributes: Doctrine\ORM\PersistentCollection {#130569 …}
    #variants: Doctrine\ORM\PersistentCollection {#130567 …}
    #options: Doctrine\ORM\PersistentCollection {#130562 …}
    #associations: Doctrine\ORM\PersistentCollection {#130565 …}
    #createdAt: DateTime @1751037573 {#130558
      date: 2025-06-27 17:19:33.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1754606304 {#130551
      date: 2025-08-08 00:38:24.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#130580 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#130669
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#130545}
        #id: 29509
        #name: "IEEE 519:1992"
        #slug: "ieee-519-1992-ieee00000764-240277"
        #description: """
          Revision Standard - Superseded.<br />\n
          This guide applies to all types of static power converters used in industrial and commercial power systems. The problems involved in the harmonic control and reactive compensation of such converters are addressed, and an application guide is provided. Limits of disturbances to the ac power distribution system that affect other equipment and communications are recommended. This guide is not intended to cover the effect of radio frequency interference.<br />\n
          \t\t\t\t<br />\n
          This recommended practice intends to establish goals for the design of electrical systems that include both linear and nonlinear loads. The voltage and current waveforms that may exist throughout the system are described, and waveform distortion goals for the system designer are established. The interface between sources and loads is described as the point of common coupling; and observance of the design goals will minimize interference between electrical equipment. This recommended practice addresses steady-state limitation. Transient conditions exceeding these limitations may be encountered. This document sets the quality of power that is to be provided at the point of common coupling. This document does not cover the effects of radio-frequency interference; however, it does include electromagnetic interference with communication systems.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Recommended Practices and Requirements for Harmonic Control in Electrical Power Systems"
        -notes: "Superseded"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#130578 …}
    #channels: Doctrine\ORM\PersistentCollection {#130571 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7519 …}
    #reviews: Doctrine\ORM\PersistentCollection {#130575 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#130573 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7681 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#130585 …}
    -apiLastModifiedAt: DateTime @1754517600 {#130544
      date: 2025-08-07 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1578006000 {#130593
      date: 2020-01-03 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @734306400 {#130564
      date: 1993-04-09 00:00:00.0 Europe/Paris (+02:00)
    }
    -releasedAt: null
    -confirmedAt: null
    -canceledAt: null
    -edition: null
    -coreDocument: "519"
    -bookCollection: ""
    -pageCount: 112
    -documents: Doctrine\ORM\PersistentCollection {#130584 …}
    -favorites: Doctrine\ORM\PersistentCollection {#130582 …}
  }
  +appearance: "state-suspended"
  +labels: [
    "Superseded"
  ]
  -stateAttributeCode: "state"
  -localeContext: Sylius\Component\Locale\Context\CompositeLocaleContext {#1833 …}
}
ProductMostRecent App\Twig\Components\ProductMostRecent 140.0 MiB 1.01 ms
Input props
[
  "product" => App\Entity\Product\Product {#130545
    #id: 8625
    #code: "IEEE00000764"
    #attributes: Doctrine\ORM\PersistentCollection {#130569 …}
    #variants: Doctrine\ORM\PersistentCollection {#130567 …}
    #options: Doctrine\ORM\PersistentCollection {#130562 …}
    #associations: Doctrine\ORM\PersistentCollection {#130565 …}
    #createdAt: DateTime @1751037573 {#130558
      date: 2025-06-27 17:19:33.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1754606304 {#130551
      date: 2025-08-08 00:38:24.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#130580 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#130669
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#130545}
        #id: 29509
        #name: "IEEE 519:1992"
        #slug: "ieee-519-1992-ieee00000764-240277"
        #description: """
          Revision Standard - Superseded.<br />\n
          This guide applies to all types of static power converters used in industrial and commercial power systems. The problems involved in the harmonic control and reactive compensation of such converters are addressed, and an application guide is provided. Limits of disturbances to the ac power distribution system that affect other equipment and communications are recommended. This guide is not intended to cover the effect of radio frequency interference.<br />\n
          \t\t\t\t<br />\n
          This recommended practice intends to establish goals for the design of electrical systems that include both linear and nonlinear loads. The voltage and current waveforms that may exist throughout the system are described, and waveform distortion goals for the system designer are established. The interface between sources and loads is described as the point of common coupling; and observance of the design goals will minimize interference between electrical equipment. This recommended practice addresses steady-state limitation. Transient conditions exceeding these limitations may be encountered. This document sets the quality of power that is to be provided at the point of common coupling. This document does not cover the effects of radio-frequency interference; however, it does include electromagnetic interference with communication systems.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Recommended Practices and Requirements for Harmonic Control in Electrical Power Systems"
        -notes: "Superseded"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#130578 …}
    #channels: Doctrine\ORM\PersistentCollection {#130571 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7519 …}
    #reviews: Doctrine\ORM\PersistentCollection {#130575 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#130573 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7681 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#130585 …}
    -apiLastModifiedAt: DateTime @1754517600 {#130544
      date: 2025-08-07 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1578006000 {#130593
      date: 2020-01-03 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @734306400 {#130564
      date: 1993-04-09 00:00:00.0 Europe/Paris (+02:00)
    }
    -releasedAt: null
    -confirmedAt: null
    -canceledAt: null
    -edition: null
    -coreDocument: "519"
    -bookCollection: ""
    -pageCount: 112
    -documents: Doctrine\ORM\PersistentCollection {#130584 …}
    -favorites: Doctrine\ORM\PersistentCollection {#130582 …}
  }
]
Attributes
[]
Component
App\Twig\Components\ProductMostRecent {#130751
  +product: App\Entity\Product\Product {#130545
    #id: 8625
    #code: "IEEE00000764"
    #attributes: Doctrine\ORM\PersistentCollection {#130569 …}
    #variants: Doctrine\ORM\PersistentCollection {#130567 …}
    #options: Doctrine\ORM\PersistentCollection {#130562 …}
    #associations: Doctrine\ORM\PersistentCollection {#130565 …}
    #createdAt: DateTime @1751037573 {#130558
      date: 2025-06-27 17:19:33.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1754606304 {#130551
      date: 2025-08-08 00:38:24.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#130580 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#130669
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#130545}
        #id: 29509
        #name: "IEEE 519:1992"
        #slug: "ieee-519-1992-ieee00000764-240277"
        #description: """
          Revision Standard - Superseded.<br />\n
          This guide applies to all types of static power converters used in industrial and commercial power systems. The problems involved in the harmonic control and reactive compensation of such converters are addressed, and an application guide is provided. Limits of disturbances to the ac power distribution system that affect other equipment and communications are recommended. This guide is not intended to cover the effect of radio frequency interference.<br />\n
          \t\t\t\t<br />\n
          This recommended practice intends to establish goals for the design of electrical systems that include both linear and nonlinear loads. The voltage and current waveforms that may exist throughout the system are described, and waveform distortion goals for the system designer are established. The interface between sources and loads is described as the point of common coupling; and observance of the design goals will minimize interference between electrical equipment. This recommended practice addresses steady-state limitation. Transient conditions exceeding these limitations may be encountered. This document sets the quality of power that is to be provided at the point of common coupling. This document does not cover the effects of radio-frequency interference; however, it does include electromagnetic interference with communication systems.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Recommended Practices and Requirements for Harmonic Control in Electrical Power Systems"
        -notes: "Superseded"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#130578 …}
    #channels: Doctrine\ORM\PersistentCollection {#130571 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7519 …}
    #reviews: Doctrine\ORM\PersistentCollection {#130575 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#130573 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7681 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#130585 …}
    -apiLastModifiedAt: DateTime @1754517600 {#130544
      date: 2025-08-07 00:00:00.0 Europe/Paris (+02:00)
    }
    -lastUpdatedAt: DateTime @1578006000 {#130593
      date: 2020-01-03 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @734306400 {#130564
      date: 1993-04-09 00:00:00.0 Europe/Paris (+02:00)
    }
    -releasedAt: null
    -confirmedAt: null
    -canceledAt: null
    -edition: null
    -coreDocument: "519"
    -bookCollection: ""
    -pageCount: 112
    -documents: Doctrine\ORM\PersistentCollection {#130584 …}
    -favorites: Doctrine\ORM\PersistentCollection {#130582 …}
  }
  +label: "Historical"
  +icon: "historical"
  -mostRecentAttributeCode: "most_recent"
  -localeContext: Sylius\Component\Locale\Context\CompositeLocaleContext {#1833 …}
}
ProductCard App\Twig\Components\ProductCard 140.0 MiB 5.27 ms
Input props
[
  "product" => App\Entity\Product\Product {#102375
    #id: 9281
    #code: "IEEE00001984"
    #attributes: Doctrine\ORM\PersistentCollection {#102356 …}
    #variants: Doctrine\ORM\PersistentCollection {#102353 …}
    #options: Doctrine\ORM\PersistentCollection {#102349 …}
    #associations: Doctrine\ORM\PersistentCollection {#102351 …}
    #createdAt: DateTime @1751038133 {#102382
      date: 2025-06-27 17:28:53.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1753969444 {#102355
      date: 2025-07-31 15:44:04.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#102366 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#102393
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#102375}
        #id: 32133
        #name: "IEEE 1303:1994 (R2000)"
        #slug: "ieee-1303-1994-r2000-ieee00001984-240933"
        #description: """
          New IEEE Standard - Superseded.<br />\n
          General guidelines and criteria for the field testing of static var compensators (SVCs) before they are placed in-service, for the purpose of verifying their specified performance are described. The major elements of a commissioning program are identified so that the user can formulate a specific plan that is most suited for his or her own SVC.<br />\n
          \t\t\t\t<br />\n
          This document is a guide for field testing and commissioning of static var compensators (SVCs). As such, the document establishes general guidelines and criteria for field testing to verify the specified performance of SVC systems. This guide does not Cover factory and simulator tests of SVC system components (but it assumes that such tests have been performed beforehand).Discuss the division of responsibility between user and supplier, since this division is usually defined in the contract between buyer and supplier. Most often, however, the practice is for the equipment, subsystem, and commissioning tests to be performed by the supplier, and the acceptance tests to be performed by the buyer or user.<br />\n
          The purpose of this guide is to help users of SVCs carry out a field test program prior to placing an SVC into service. The major elements of a commissioning program are identified so that the user can formulate a specific plan that is suited to his or her own SVC. Such a test program should cover the following:-- Equipment tests within the SVC system; -- Tests of the various subsystems that comprise the SVC system; -- Commissioning tests for the complete SVC system; -- Acceptance testing of the SVC system. It should be recognized that there are many ways in which a particular SVC may be commissioned, and also that it is not the purpose of this guide to endorse a specific procedure to the exclusion of other methods. Depending on the purpose of the SVC design (transmission type or smaller size used for other purposes) some tests may not be required. In particular, some control system tests may be included in the factory tests. Also, acceptance tests may be integrated into any of the categories listed above.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for Static Var Compensator Field Tests"
        -notes: "Superseded"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#102364 …}
    #channels: Doctrine\ORM\PersistentCollection {#102358 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7519 …}
    #reviews: Doctrine\ORM\PersistentCollection {#102362 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#102360 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7681 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#102373 …}
    -apiLastModifiedAt: DateTime @1743289200 {#102342
      date: 2025-03-30 00:00:00.0 Europe/Paris (+01:00)
    }
    -lastUpdatedAt: DateTime @1578006000 {#102381
      date: 2020-01-03 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @783903600 {#102380
      date: 1994-11-04 00:00:00.0 Europe/Paris (+01:00)
    }
    -releasedAt: null
    -confirmedAt: DateTime @954367200 {#102374
      date: 2000-03-30 00:00:00.0 Europe/Paris (+02:00)
    }
    -canceledAt: null
    -edition: null
    -coreDocument: "1303"
    -bookCollection: ""
    -pageCount: 32
    -documents: Doctrine\ORM\PersistentCollection {#102371 …}
    -favorites: Doctrine\ORM\PersistentCollection {#102369 …}
  }
  "layout" => "vertical"
  "showPrice" => true
  "showStatusBadges" => true
  "additionalClasses" => "product__teaser--with-grey-border"
  "hasStretchedLink" => true
  "hoverType" => "shadow"
  "linkLabel" => "See more"
]
Attributes
[]
Component
App\Twig\Components\ProductCard {#130826
  +product: App\Entity\Product\Product {#102375
    #id: 9281
    #code: "IEEE00001984"
    #attributes: Doctrine\ORM\PersistentCollection {#102356 …}
    #variants: Doctrine\ORM\PersistentCollection {#102353 …}
    #options: Doctrine\ORM\PersistentCollection {#102349 …}
    #associations: Doctrine\ORM\PersistentCollection {#102351 …}
    #createdAt: DateTime @1751038133 {#102382
      date: 2025-06-27 17:28:53.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1753969444 {#102355
      date: 2025-07-31 15:44:04.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#102366 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#102393
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#102375}
        #id: 32133
        #name: "IEEE 1303:1994 (R2000)"
        #slug: "ieee-1303-1994-r2000-ieee00001984-240933"
        #description: """
          New IEEE Standard - Superseded.<br />\n
          General guidelines and criteria for the field testing of static var compensators (SVCs) before they are placed in-service, for the purpose of verifying their specified performance are described. The major elements of a commissioning program are identified so that the user can formulate a specific plan that is most suited for his or her own SVC.<br />\n
          \t\t\t\t<br />\n
          This document is a guide for field testing and commissioning of static var compensators (SVCs). As such, the document establishes general guidelines and criteria for field testing to verify the specified performance of SVC systems. This guide does not Cover factory and simulator tests of SVC system components (but it assumes that such tests have been performed beforehand).Discuss the division of responsibility between user and supplier, since this division is usually defined in the contract between buyer and supplier. Most often, however, the practice is for the equipment, subsystem, and commissioning tests to be performed by the supplier, and the acceptance tests to be performed by the buyer or user.<br />\n
          The purpose of this guide is to help users of SVCs carry out a field test program prior to placing an SVC into service. The major elements of a commissioning program are identified so that the user can formulate a specific plan that is suited to his or her own SVC. Such a test program should cover the following:-- Equipment tests within the SVC system; -- Tests of the various subsystems that comprise the SVC system; -- Commissioning tests for the complete SVC system; -- Acceptance testing of the SVC system. It should be recognized that there are many ways in which a particular SVC may be commissioned, and also that it is not the purpose of this guide to endorse a specific procedure to the exclusion of other methods. Depending on the purpose of the SVC design (transmission type or smaller size used for other purposes) some tests may not be required. In particular, some control system tests may be included in the factory tests. Also, acceptance tests may be integrated into any of the categories listed above.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for Static Var Compensator Field Tests"
        -notes: "Superseded"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#102364 …}
    #channels: Doctrine\ORM\PersistentCollection {#102358 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7519 …}
    #reviews: Doctrine\ORM\PersistentCollection {#102362 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#102360 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7681 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#102373 …}
    -apiLastModifiedAt: DateTime @1743289200 {#102342
      date: 2025-03-30 00:00:00.0 Europe/Paris (+01:00)
    }
    -lastUpdatedAt: DateTime @1578006000 {#102381
      date: 2020-01-03 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @783903600 {#102380
      date: 1994-11-04 00:00:00.0 Europe/Paris (+01:00)
    }
    -releasedAt: null
    -confirmedAt: DateTime @954367200 {#102374
      date: 2000-03-30 00:00:00.0 Europe/Paris (+02:00)
    }
    -canceledAt: null
    -edition: null
    -coreDocument: "1303"
    -bookCollection: ""
    -pageCount: 32
    -documents: Doctrine\ORM\PersistentCollection {#102371 …}
    -favorites: Doctrine\ORM\PersistentCollection {#102369 …}
  }
  +layout: "vertical"
  +showPrice: true
  +showStatusBadges: true
  +additionalClasses: "product__teaser--with-grey-border"
  +linkLabel: "See more"
  +imageFilter: "product_thumbnail_teaser"
  +hasStretchedLink: true
  +backgroundColor: "white"
  +hoverType: "shadow"
}
ProductState App\Twig\Components\ProductState 140.0 MiB 0.21 ms
Input props
[
  "product" => App\Entity\Product\Product {#102375
    #id: 9281
    #code: "IEEE00001984"
    #attributes: Doctrine\ORM\PersistentCollection {#102356 …}
    #variants: Doctrine\ORM\PersistentCollection {#102353 …}
    #options: Doctrine\ORM\PersistentCollection {#102349 …}
    #associations: Doctrine\ORM\PersistentCollection {#102351 …}
    #createdAt: DateTime @1751038133 {#102382
      date: 2025-06-27 17:28:53.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1753969444 {#102355
      date: 2025-07-31 15:44:04.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#102366 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#102393
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#102375}
        #id: 32133
        #name: "IEEE 1303:1994 (R2000)"
        #slug: "ieee-1303-1994-r2000-ieee00001984-240933"
        #description: """
          New IEEE Standard - Superseded.<br />\n
          General guidelines and criteria for the field testing of static var compensators (SVCs) before they are placed in-service, for the purpose of verifying their specified performance are described. The major elements of a commissioning program are identified so that the user can formulate a specific plan that is most suited for his or her own SVC.<br />\n
          \t\t\t\t<br />\n
          This document is a guide for field testing and commissioning of static var compensators (SVCs). As such, the document establishes general guidelines and criteria for field testing to verify the specified performance of SVC systems. This guide does not Cover factory and simulator tests of SVC system components (but it assumes that such tests have been performed beforehand).Discuss the division of responsibility between user and supplier, since this division is usually defined in the contract between buyer and supplier. Most often, however, the practice is for the equipment, subsystem, and commissioning tests to be performed by the supplier, and the acceptance tests to be performed by the buyer or user.<br />\n
          The purpose of this guide is to help users of SVCs carry out a field test program prior to placing an SVC into service. The major elements of a commissioning program are identified so that the user can formulate a specific plan that is suited to his or her own SVC. Such a test program should cover the following:-- Equipment tests within the SVC system; -- Tests of the various subsystems that comprise the SVC system; -- Commissioning tests for the complete SVC system; -- Acceptance testing of the SVC system. It should be recognized that there are many ways in which a particular SVC may be commissioned, and also that it is not the purpose of this guide to endorse a specific procedure to the exclusion of other methods. Depending on the purpose of the SVC design (transmission type or smaller size used for other purposes) some tests may not be required. In particular, some control system tests may be included in the factory tests. Also, acceptance tests may be integrated into any of the categories listed above.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for Static Var Compensator Field Tests"
        -notes: "Superseded"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#102364 …}
    #channels: Doctrine\ORM\PersistentCollection {#102358 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7519 …}
    #reviews: Doctrine\ORM\PersistentCollection {#102362 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#102360 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7681 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#102373 …}
    -apiLastModifiedAt: DateTime @1743289200 {#102342
      date: 2025-03-30 00:00:00.0 Europe/Paris (+01:00)
    }
    -lastUpdatedAt: DateTime @1578006000 {#102381
      date: 2020-01-03 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @783903600 {#102380
      date: 1994-11-04 00:00:00.0 Europe/Paris (+01:00)
    }
    -releasedAt: null
    -confirmedAt: DateTime @954367200 {#102374
      date: 2000-03-30 00:00:00.0 Europe/Paris (+02:00)
    }
    -canceledAt: null
    -edition: null
    -coreDocument: "1303"
    -bookCollection: ""
    -pageCount: 32
    -documents: Doctrine\ORM\PersistentCollection {#102371 …}
    -favorites: Doctrine\ORM\PersistentCollection {#102369 …}
  }
]
Attributes
[
  "showFullLabel" => false
]
Component
App\Twig\Components\ProductState {#130874
  +product: App\Entity\Product\Product {#102375
    #id: 9281
    #code: "IEEE00001984"
    #attributes: Doctrine\ORM\PersistentCollection {#102356 …}
    #variants: Doctrine\ORM\PersistentCollection {#102353 …}
    #options: Doctrine\ORM\PersistentCollection {#102349 …}
    #associations: Doctrine\ORM\PersistentCollection {#102351 …}
    #createdAt: DateTime @1751038133 {#102382
      date: 2025-06-27 17:28:53.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1753969444 {#102355
      date: 2025-07-31 15:44:04.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#102366 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#102393
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#102375}
        #id: 32133
        #name: "IEEE 1303:1994 (R2000)"
        #slug: "ieee-1303-1994-r2000-ieee00001984-240933"
        #description: """
          New IEEE Standard - Superseded.<br />\n
          General guidelines and criteria for the field testing of static var compensators (SVCs) before they are placed in-service, for the purpose of verifying their specified performance are described. The major elements of a commissioning program are identified so that the user can formulate a specific plan that is most suited for his or her own SVC.<br />\n
          \t\t\t\t<br />\n
          This document is a guide for field testing and commissioning of static var compensators (SVCs). As such, the document establishes general guidelines and criteria for field testing to verify the specified performance of SVC systems. This guide does not Cover factory and simulator tests of SVC system components (but it assumes that such tests have been performed beforehand).Discuss the division of responsibility between user and supplier, since this division is usually defined in the contract between buyer and supplier. Most often, however, the practice is for the equipment, subsystem, and commissioning tests to be performed by the supplier, and the acceptance tests to be performed by the buyer or user.<br />\n
          The purpose of this guide is to help users of SVCs carry out a field test program prior to placing an SVC into service. The major elements of a commissioning program are identified so that the user can formulate a specific plan that is suited to his or her own SVC. Such a test program should cover the following:-- Equipment tests within the SVC system; -- Tests of the various subsystems that comprise the SVC system; -- Commissioning tests for the complete SVC system; -- Acceptance testing of the SVC system. It should be recognized that there are many ways in which a particular SVC may be commissioned, and also that it is not the purpose of this guide to endorse a specific procedure to the exclusion of other methods. Depending on the purpose of the SVC design (transmission type or smaller size used for other purposes) some tests may not be required. In particular, some control system tests may be included in the factory tests. Also, acceptance tests may be integrated into any of the categories listed above.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for Static Var Compensator Field Tests"
        -notes: "Superseded"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#102364 …}
    #channels: Doctrine\ORM\PersistentCollection {#102358 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7519 …}
    #reviews: Doctrine\ORM\PersistentCollection {#102362 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#102360 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7681 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#102373 …}
    -apiLastModifiedAt: DateTime @1743289200 {#102342
      date: 2025-03-30 00:00:00.0 Europe/Paris (+01:00)
    }
    -lastUpdatedAt: DateTime @1578006000 {#102381
      date: 2020-01-03 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @783903600 {#102380
      date: 1994-11-04 00:00:00.0 Europe/Paris (+01:00)
    }
    -releasedAt: null
    -confirmedAt: DateTime @954367200 {#102374
      date: 2000-03-30 00:00:00.0 Europe/Paris (+02:00)
    }
    -canceledAt: null
    -edition: null
    -coreDocument: "1303"
    -bookCollection: ""
    -pageCount: 32
    -documents: Doctrine\ORM\PersistentCollection {#102371 …}
    -favorites: Doctrine\ORM\PersistentCollection {#102369 …}
  }
  +appearance: "state-suspended"
  +labels: [
    "Superseded"
  ]
  -stateAttributeCode: "state"
  -localeContext: Sylius\Component\Locale\Context\CompositeLocaleContext {#1833 …}
}
ProductMostRecent App\Twig\Components\ProductMostRecent 140.0 MiB 0.82 ms
Input props
[
  "product" => App\Entity\Product\Product {#102375
    #id: 9281
    #code: "IEEE00001984"
    #attributes: Doctrine\ORM\PersistentCollection {#102356 …}
    #variants: Doctrine\ORM\PersistentCollection {#102353 …}
    #options: Doctrine\ORM\PersistentCollection {#102349 …}
    #associations: Doctrine\ORM\PersistentCollection {#102351 …}
    #createdAt: DateTime @1751038133 {#102382
      date: 2025-06-27 17:28:53.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1753969444 {#102355
      date: 2025-07-31 15:44:04.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#102366 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#102393
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#102375}
        #id: 32133
        #name: "IEEE 1303:1994 (R2000)"
        #slug: "ieee-1303-1994-r2000-ieee00001984-240933"
        #description: """
          New IEEE Standard - Superseded.<br />\n
          General guidelines and criteria for the field testing of static var compensators (SVCs) before they are placed in-service, for the purpose of verifying their specified performance are described. The major elements of a commissioning program are identified so that the user can formulate a specific plan that is most suited for his or her own SVC.<br />\n
          \t\t\t\t<br />\n
          This document is a guide for field testing and commissioning of static var compensators (SVCs). As such, the document establishes general guidelines and criteria for field testing to verify the specified performance of SVC systems. This guide does not Cover factory and simulator tests of SVC system components (but it assumes that such tests have been performed beforehand).Discuss the division of responsibility between user and supplier, since this division is usually defined in the contract between buyer and supplier. Most often, however, the practice is for the equipment, subsystem, and commissioning tests to be performed by the supplier, and the acceptance tests to be performed by the buyer or user.<br />\n
          The purpose of this guide is to help users of SVCs carry out a field test program prior to placing an SVC into service. The major elements of a commissioning program are identified so that the user can formulate a specific plan that is suited to his or her own SVC. Such a test program should cover the following:-- Equipment tests within the SVC system; -- Tests of the various subsystems that comprise the SVC system; -- Commissioning tests for the complete SVC system; -- Acceptance testing of the SVC system. It should be recognized that there are many ways in which a particular SVC may be commissioned, and also that it is not the purpose of this guide to endorse a specific procedure to the exclusion of other methods. Depending on the purpose of the SVC design (transmission type or smaller size used for other purposes) some tests may not be required. In particular, some control system tests may be included in the factory tests. Also, acceptance tests may be integrated into any of the categories listed above.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for Static Var Compensator Field Tests"
        -notes: "Superseded"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#102364 …}
    #channels: Doctrine\ORM\PersistentCollection {#102358 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7519 …}
    #reviews: Doctrine\ORM\PersistentCollection {#102362 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#102360 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7681 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#102373 …}
    -apiLastModifiedAt: DateTime @1743289200 {#102342
      date: 2025-03-30 00:00:00.0 Europe/Paris (+01:00)
    }
    -lastUpdatedAt: DateTime @1578006000 {#102381
      date: 2020-01-03 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @783903600 {#102380
      date: 1994-11-04 00:00:00.0 Europe/Paris (+01:00)
    }
    -releasedAt: null
    -confirmedAt: DateTime @954367200 {#102374
      date: 2000-03-30 00:00:00.0 Europe/Paris (+02:00)
    }
    -canceledAt: null
    -edition: null
    -coreDocument: "1303"
    -bookCollection: ""
    -pageCount: 32
    -documents: Doctrine\ORM\PersistentCollection {#102371 …}
    -favorites: Doctrine\ORM\PersistentCollection {#102369 …}
  }
]
Attributes
[]
Component
App\Twig\Components\ProductMostRecent {#130916
  +product: App\Entity\Product\Product {#102375
    #id: 9281
    #code: "IEEE00001984"
    #attributes: Doctrine\ORM\PersistentCollection {#102356 …}
    #variants: Doctrine\ORM\PersistentCollection {#102353 …}
    #options: Doctrine\ORM\PersistentCollection {#102349 …}
    #associations: Doctrine\ORM\PersistentCollection {#102351 …}
    #createdAt: DateTime @1751038133 {#102382
      date: 2025-06-27 17:28:53.0 Europe/Paris (+02:00)
    }
    #updatedAt: DateTime @1753969444 {#102355
      date: 2025-07-31 15:44:04.0 Europe/Paris (+02:00)
    }
    #enabled: true
    #translations: Doctrine\ORM\PersistentCollection {#102366 …}
    #translationsCache: [
      "en_US" => App\Entity\Product\ProductTranslation {#102393
        #locale: "en_US"
        #translatable: App\Entity\Product\Product {#102375}
        #id: 32133
        #name: "IEEE 1303:1994 (R2000)"
        #slug: "ieee-1303-1994-r2000-ieee00001984-240933"
        #description: """
          New IEEE Standard - Superseded.<br />\n
          General guidelines and criteria for the field testing of static var compensators (SVCs) before they are placed in-service, for the purpose of verifying their specified performance are described. The major elements of a commissioning program are identified so that the user can formulate a specific plan that is most suited for his or her own SVC.<br />\n
          \t\t\t\t<br />\n
          This document is a guide for field testing and commissioning of static var compensators (SVCs). As such, the document establishes general guidelines and criteria for field testing to verify the specified performance of SVC systems. This guide does not Cover factory and simulator tests of SVC system components (but it assumes that such tests have been performed beforehand).Discuss the division of responsibility between user and supplier, since this division is usually defined in the contract between buyer and supplier. Most often, however, the practice is for the equipment, subsystem, and commissioning tests to be performed by the supplier, and the acceptance tests to be performed by the buyer or user.<br />\n
          The purpose of this guide is to help users of SVCs carry out a field test program prior to placing an SVC into service. The major elements of a commissioning program are identified so that the user can formulate a specific plan that is suited to his or her own SVC. Such a test program should cover the following:-- Equipment tests within the SVC system; -- Tests of the various subsystems that comprise the SVC system; -- Commissioning tests for the complete SVC system; -- Acceptance testing of the SVC system. It should be recognized that there are many ways in which a particular SVC may be commissioned, and also that it is not the purpose of this guide to endorse a specific procedure to the exclusion of other methods. Depending on the purpose of the SVC design (transmission type or smaller size used for other purposes) some tests may not be required. In particular, some control system tests may be included in the factory tests. Also, acceptance tests may be integrated into any of the categories listed above.
          """
        #metaKeywords: null
        #metaDescription: null
        #shortDescription: "IEEE Guide for Static Var Compensator Field Tests"
        -notes: "Superseded"
      }
    ]
    #currentLocale: "en_US"
    #currentTranslation: null
    #fallbackLocale: "en_US"
    #variantSelectionMethod: "match"
    #productTaxons: Doctrine\ORM\PersistentCollection {#102364 …}
    #channels: Doctrine\ORM\PersistentCollection {#102358 …}
    #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7519 …}
    #reviews: Doctrine\ORM\PersistentCollection {#102362 …}
    #averageRating: 0.0
    #images: Doctrine\ORM\PersistentCollection {#102360 …}
    -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7681 …}
    -subscriptionCollections: Doctrine\ORM\PersistentCollection {#102373 …}
    -apiLastModifiedAt: DateTime @1743289200 {#102342
      date: 2025-03-30 00:00:00.0 Europe/Paris (+01:00)
    }
    -lastUpdatedAt: DateTime @1578006000 {#102381
      date: 2020-01-03 00:00:00.0 Europe/Paris (+01:00)
    }
    -author: ""
    -publishedAt: DateTime @783903600 {#102380
      date: 1994-11-04 00:00:00.0 Europe/Paris (+01:00)
    }
    -releasedAt: null
    -confirmedAt: DateTime @954367200 {#102374
      date: 2000-03-30 00:00:00.0 Europe/Paris (+02:00)
    }
    -canceledAt: null
    -edition: null
    -coreDocument: "1303"
    -bookCollection: ""
    -pageCount: 32
    -documents: Doctrine\ORM\PersistentCollection {#102371 …}
    -favorites: Doctrine\ORM\PersistentCollection {#102369 …}
  }
  +label: "Historical"
  +icon: "historical"
  -mostRecentAttributeCode: "most_recent"
  -localeContext: Sylius\Component\Locale\Context\CompositeLocaleContext {#1833 …}
}