Components
4
Twig Components
12
Render Count
10
ms
Render Time
206.0
MiB
Memory Usage
Components
| Name | Metadata | Render Count | Render Time |
|---|---|---|---|
| ProductState |
"App\Twig\Components\ProductState"components/ProductState.html.twig |
5 | 0.93ms |
| ProductMostRecent |
"App\Twig\Components\ProductMostRecent"components/ProductMostRecent.html.twig |
5 | 3.16ms |
| ProductType |
"App\Twig\Components\ProductType"components/ProductType.html.twig |
1 | 0.18ms |
| ProductCard |
"App\Twig\Components\ProductCard"components/ProductCard.html.twig |
1 | 6.12ms |
Render calls
| ProductState | App\Twig\Components\ProductState | 206.0 MiB | 0.30 ms | |
|---|---|---|---|---|
| Input props | [ "product" => App\Entity\Product\Product {#7309 #id: 8535 #code: "IEEE00000630" #attributes: Doctrine\ORM\PersistentCollection {#7702 …} #variants: Doctrine\ORM\PersistentCollection {#7745 …} #options: Doctrine\ORM\PersistentCollection {#7917 …} #associations: Doctrine\ORM\PersistentCollection {#7901 …} #createdAt: DateTime @1751037499 {#7274 : 2025-06-27 17:18:19.0 Europe/Paris (+02:00) } #updatedAt: DateTime @1754606304 {#7322 : 2025-08-08 00:38:24.0 Europe/Paris (+02:00) } #enabled: true #translations: Doctrine\ORM\PersistentCollection {#7923 …} #translationsCache: [ "en_US" => App\Entity\Product\ProductTranslation {#7922 #locale: "en_US" #translatable: App\Entity\Product\Product {#7309} #id: 29149 #name: "IEEE 415:1986 (R1992)" #slug: "ieee-415-1986-r1992-ieee00000630-240187" #description: """ Revision Standard - Inactive-Withdrawn.<br />\n Directions for establishing an acceptable pre-operational testing program for Class 1E power systems in nuclear power generating stations are provided. The pre-operational tests are performed after the appropriate construction tests have been completed. Their purpose is to verify that the Class 1E power systems perform their required function as designed. The power systems are considered to include the ac and dc power supplies, but do not include the equipment that utilizes the power.<br />\n \t\t\t\t<br />\n This guide provides guidance for the planning of preoperational test programs for Class IE Power Systems for nuclear power generating stations. The extent of the systems shall be that covered by ANSI/IEEE Std 308-1980, IEEE Standard Criteria for Class IE Power Systems for Nuclear Power Generating Stations. An example system is illustrated in ANSI/IEEE Std 308-1980 [2], Fig-1. The power systems are considered to include the ac and dc power supplies, but do not include the equipment which utilizes the ac and dc power.<br />\n The purpose of this guide is to provide direction for establishing an acceptable preoperational testing program for Class IE Power Systems in nuclear power generating stations. The preoperational tests are performed after the appropriate construction tests have been completed. The purpose of preoperational tests is to verify that the Class IE Power Systems perform their required function as designed. """ #metaKeywords: null #metaDescription: null #shortDescription: "IEEE Guide for Planning of Preoperational Testing Programs for Class 1E Power Systems for Nuclear Power Generating Stations" -notes: "Inactive-Withdrawn" } ] #currentLocale: "en_US" #currentTranslation: null #fallbackLocale: "en_US" #variantSelectionMethod: "match" #productTaxons: Doctrine\ORM\PersistentCollection {#7535 …} #channels: Doctrine\ORM\PersistentCollection {#7629 …} #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7308 …} #reviews: Doctrine\ORM\PersistentCollection {#7614 …} #averageRating: 0.0 #images: Doctrine\ORM\PersistentCollection {#7646 …} -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7422 …} -subscriptionCollections: Doctrine\ORM\PersistentCollection {#7420 …} -apiLastModifiedAt: DateTime @1754517600 {#7317 : 2025-08-07 00:00:00.0 Europe/Paris (+02:00) } -lastUpdatedAt: DateTime @1578006000 {#7292 : 2020-01-03 00:00:00.0 Europe/Paris (+01:00) } -author: "" -publishedAt: DateTime @502930800 {#7318 : 1985-12-09 00:00:00.0 Europe/Paris (+01:00) } -releasedAt: null -confirmedAt: DateTime @708818400 {#7316 : 1992-06-18 00:00:00.0 Europe/Paris (+02:00) } -canceledAt: DateTime @890262000 {#7315 : 1998-03-19 00:00:00.0 Europe/Paris (+01:00) } -edition: null -coreDocument: "415" -bookCollection: "" -pageCount: 16 -documents: Doctrine\ORM\PersistentCollection {#7466 …} -favorites: Doctrine\ORM\PersistentCollection {#7501 …} } "showFullLabel" => "true" ] |
|||
| Attributes | [ "showFullLabel" => "true" ] |
|||
| Component | App\Twig\Components\ProductState {#93009 +product: App\Entity\Product\Product {#7309 #id: 8535 #code: "IEEE00000630" #attributes: Doctrine\ORM\PersistentCollection {#7702 …} #variants: Doctrine\ORM\PersistentCollection {#7745 …} #options: Doctrine\ORM\PersistentCollection {#7917 …} #associations: Doctrine\ORM\PersistentCollection {#7901 …} #createdAt: DateTime @1751037499 {#7274 : 2025-06-27 17:18:19.0 Europe/Paris (+02:00) } #updatedAt: DateTime @1754606304 {#7322 : 2025-08-08 00:38:24.0 Europe/Paris (+02:00) } #enabled: true #translations: Doctrine\ORM\PersistentCollection {#7923 …} #translationsCache: [ "en_US" => App\Entity\Product\ProductTranslation {#7922 #locale: "en_US" #translatable: App\Entity\Product\Product {#7309} #id: 29149 #name: "IEEE 415:1986 (R1992)" #slug: "ieee-415-1986-r1992-ieee00000630-240187" #description: """ Revision Standard - Inactive-Withdrawn.<br />\n Directions for establishing an acceptable pre-operational testing program for Class 1E power systems in nuclear power generating stations are provided. The pre-operational tests are performed after the appropriate construction tests have been completed. Their purpose is to verify that the Class 1E power systems perform their required function as designed. The power systems are considered to include the ac and dc power supplies, but do not include the equipment that utilizes the power.<br />\n \t\t\t\t<br />\n This guide provides guidance for the planning of preoperational test programs for Class IE Power Systems for nuclear power generating stations. The extent of the systems shall be that covered by ANSI/IEEE Std 308-1980, IEEE Standard Criteria for Class IE Power Systems for Nuclear Power Generating Stations. An example system is illustrated in ANSI/IEEE Std 308-1980 [2], Fig-1. The power systems are considered to include the ac and dc power supplies, but do not include the equipment which utilizes the ac and dc power.<br />\n The purpose of this guide is to provide direction for establishing an acceptable preoperational testing program for Class IE Power Systems in nuclear power generating stations. The preoperational tests are performed after the appropriate construction tests have been completed. The purpose of preoperational tests is to verify that the Class IE Power Systems perform their required function as designed. """ #metaKeywords: null #metaDescription: null #shortDescription: "IEEE Guide for Planning of Preoperational Testing Programs for Class 1E Power Systems for Nuclear Power Generating Stations" -notes: "Inactive-Withdrawn" } ] #currentLocale: "en_US" #currentTranslation: null #fallbackLocale: "en_US" #variantSelectionMethod: "match" #productTaxons: Doctrine\ORM\PersistentCollection {#7535 …} #channels: Doctrine\ORM\PersistentCollection {#7629 …} #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7308 …} #reviews: Doctrine\ORM\PersistentCollection {#7614 …} #averageRating: 0.0 #images: Doctrine\ORM\PersistentCollection {#7646 …} -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7422 …} -subscriptionCollections: Doctrine\ORM\PersistentCollection {#7420 …} -apiLastModifiedAt: DateTime @1754517600 {#7317 : 2025-08-07 00:00:00.0 Europe/Paris (+02:00) } -lastUpdatedAt: DateTime @1578006000 {#7292 : 2020-01-03 00:00:00.0 Europe/Paris (+01:00) } -author: "" -publishedAt: DateTime @502930800 {#7318 : 1985-12-09 00:00:00.0 Europe/Paris (+01:00) } -releasedAt: null -confirmedAt: DateTime @708818400 {#7316 : 1992-06-18 00:00:00.0 Europe/Paris (+02:00) } -canceledAt: DateTime @890262000 {#7315 : 1998-03-19 00:00:00.0 Europe/Paris (+01:00) } -edition: null -coreDocument: "415" -bookCollection: "" -pageCount: 16 -documents: Doctrine\ORM\PersistentCollection {#7466 …} -favorites: Doctrine\ORM\PersistentCollection {#7501 …} } +appearance: "state-withdrawn" +labels: [ "Withdrawn" "Confirmed" ] -stateAttributeCode: "state" -localeContext: Sylius\Component\Locale\Context\CompositeLocaleContext {#1833 …} } |
|||
| ProductType | App\Twig\Components\ProductType | 206.0 MiB | 0.18 ms | |
|---|---|---|---|---|
| Input props | [ "product" => App\Entity\Product\Product {#7309 #id: 8535 #code: "IEEE00000630" #attributes: Doctrine\ORM\PersistentCollection {#7702 …} #variants: Doctrine\ORM\PersistentCollection {#7745 …} #options: Doctrine\ORM\PersistentCollection {#7917 …} #associations: Doctrine\ORM\PersistentCollection {#7901 …} #createdAt: DateTime @1751037499 {#7274 : 2025-06-27 17:18:19.0 Europe/Paris (+02:00) } #updatedAt: DateTime @1754606304 {#7322 : 2025-08-08 00:38:24.0 Europe/Paris (+02:00) } #enabled: true #translations: Doctrine\ORM\PersistentCollection {#7923 …} #translationsCache: [ "en_US" => App\Entity\Product\ProductTranslation {#7922 #locale: "en_US" #translatable: App\Entity\Product\Product {#7309} #id: 29149 #name: "IEEE 415:1986 (R1992)" #slug: "ieee-415-1986-r1992-ieee00000630-240187" #description: """ Revision Standard - Inactive-Withdrawn.<br />\n Directions for establishing an acceptable pre-operational testing program for Class 1E power systems in nuclear power generating stations are provided. The pre-operational tests are performed after the appropriate construction tests have been completed. Their purpose is to verify that the Class 1E power systems perform their required function as designed. The power systems are considered to include the ac and dc power supplies, but do not include the equipment that utilizes the power.<br />\n \t\t\t\t<br />\n This guide provides guidance for the planning of preoperational test programs for Class IE Power Systems for nuclear power generating stations. The extent of the systems shall be that covered by ANSI/IEEE Std 308-1980, IEEE Standard Criteria for Class IE Power Systems for Nuclear Power Generating Stations. An example system is illustrated in ANSI/IEEE Std 308-1980 [2], Fig-1. The power systems are considered to include the ac and dc power supplies, but do not include the equipment which utilizes the ac and dc power.<br />\n The purpose of this guide is to provide direction for establishing an acceptable preoperational testing program for Class IE Power Systems in nuclear power generating stations. The preoperational tests are performed after the appropriate construction tests have been completed. The purpose of preoperational tests is to verify that the Class IE Power Systems perform their required function as designed. """ #metaKeywords: null #metaDescription: null #shortDescription: "IEEE Guide for Planning of Preoperational Testing Programs for Class 1E Power Systems for Nuclear Power Generating Stations" -notes: "Inactive-Withdrawn" } ] #currentLocale: "en_US" #currentTranslation: null #fallbackLocale: "en_US" #variantSelectionMethod: "match" #productTaxons: Doctrine\ORM\PersistentCollection {#7535 …} #channels: Doctrine\ORM\PersistentCollection {#7629 …} #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7308 …} #reviews: Doctrine\ORM\PersistentCollection {#7614 …} #averageRating: 0.0 #images: Doctrine\ORM\PersistentCollection {#7646 …} -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7422 …} -subscriptionCollections: Doctrine\ORM\PersistentCollection {#7420 …} -apiLastModifiedAt: DateTime @1754517600 {#7317 : 2025-08-07 00:00:00.0 Europe/Paris (+02:00) } -lastUpdatedAt: DateTime @1578006000 {#7292 : 2020-01-03 00:00:00.0 Europe/Paris (+01:00) } -author: "" -publishedAt: DateTime @502930800 {#7318 : 1985-12-09 00:00:00.0 Europe/Paris (+01:00) } -releasedAt: null -confirmedAt: DateTime @708818400 {#7316 : 1992-06-18 00:00:00.0 Europe/Paris (+02:00) } -canceledAt: DateTime @890262000 {#7315 : 1998-03-19 00:00:00.0 Europe/Paris (+01:00) } -edition: null -coreDocument: "415" -bookCollection: "" -pageCount: 16 -documents: Doctrine\ORM\PersistentCollection {#7466 …} -favorites: Doctrine\ORM\PersistentCollection {#7501 …} } ] |
|||
| Attributes | [] |
|||
| Component | App\Twig\Components\ProductType {#93202 +product: App\Entity\Product\Product {#7309 #id: 8535 #code: "IEEE00000630" #attributes: Doctrine\ORM\PersistentCollection {#7702 …} #variants: Doctrine\ORM\PersistentCollection {#7745 …} #options: Doctrine\ORM\PersistentCollection {#7917 …} #associations: Doctrine\ORM\PersistentCollection {#7901 …} #createdAt: DateTime @1751037499 {#7274 : 2025-06-27 17:18:19.0 Europe/Paris (+02:00) } #updatedAt: DateTime @1754606304 {#7322 : 2025-08-08 00:38:24.0 Europe/Paris (+02:00) } #enabled: true #translations: Doctrine\ORM\PersistentCollection {#7923 …} #translationsCache: [ "en_US" => App\Entity\Product\ProductTranslation {#7922 #locale: "en_US" #translatable: App\Entity\Product\Product {#7309} #id: 29149 #name: "IEEE 415:1986 (R1992)" #slug: "ieee-415-1986-r1992-ieee00000630-240187" #description: """ Revision Standard - Inactive-Withdrawn.<br />\n Directions for establishing an acceptable pre-operational testing program for Class 1E power systems in nuclear power generating stations are provided. The pre-operational tests are performed after the appropriate construction tests have been completed. Their purpose is to verify that the Class 1E power systems perform their required function as designed. The power systems are considered to include the ac and dc power supplies, but do not include the equipment that utilizes the power.<br />\n \t\t\t\t<br />\n This guide provides guidance for the planning of preoperational test programs for Class IE Power Systems for nuclear power generating stations. The extent of the systems shall be that covered by ANSI/IEEE Std 308-1980, IEEE Standard Criteria for Class IE Power Systems for Nuclear Power Generating Stations. An example system is illustrated in ANSI/IEEE Std 308-1980 [2], Fig-1. The power systems are considered to include the ac and dc power supplies, but do not include the equipment which utilizes the ac and dc power.<br />\n The purpose of this guide is to provide direction for establishing an acceptable preoperational testing program for Class IE Power Systems in nuclear power generating stations. The preoperational tests are performed after the appropriate construction tests have been completed. The purpose of preoperational tests is to verify that the Class IE Power Systems perform their required function as designed. """ #metaKeywords: null #metaDescription: null #shortDescription: "IEEE Guide for Planning of Preoperational Testing Programs for Class 1E Power Systems for Nuclear Power Generating Stations" -notes: "Inactive-Withdrawn" } ] #currentLocale: "en_US" #currentTranslation: null #fallbackLocale: "en_US" #variantSelectionMethod: "match" #productTaxons: Doctrine\ORM\PersistentCollection {#7535 …} #channels: Doctrine\ORM\PersistentCollection {#7629 …} #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7308 …} #reviews: Doctrine\ORM\PersistentCollection {#7614 …} #averageRating: 0.0 #images: Doctrine\ORM\PersistentCollection {#7646 …} -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7422 …} -subscriptionCollections: Doctrine\ORM\PersistentCollection {#7420 …} -apiLastModifiedAt: DateTime @1754517600 {#7317 : 2025-08-07 00:00:00.0 Europe/Paris (+02:00) } -lastUpdatedAt: DateTime @1578006000 {#7292 : 2020-01-03 00:00:00.0 Europe/Paris (+01:00) } -author: "" -publishedAt: DateTime @502930800 {#7318 : 1985-12-09 00:00:00.0 Europe/Paris (+01:00) } -releasedAt: null -confirmedAt: DateTime @708818400 {#7316 : 1992-06-18 00:00:00.0 Europe/Paris (+02:00) } -canceledAt: DateTime @890262000 {#7315 : 1998-03-19 00:00:00.0 Europe/Paris (+01:00) } -edition: null -coreDocument: "415" -bookCollection: "" -pageCount: 16 -documents: Doctrine\ORM\PersistentCollection {#7466 …} -favorites: Doctrine\ORM\PersistentCollection {#7501 …} } +label: "Standard" -typeAttributeCode: "type" -localeContext: Sylius\Component\Locale\Context\CompositeLocaleContext {#1833 …} } |
|||
| ProductMostRecent | App\Twig\Components\ProductMostRecent | 206.0 MiB | 0.63 ms | |
|---|---|---|---|---|
| Input props | [ "product" => App\Entity\Product\Product {#7309 #id: 8535 #code: "IEEE00000630" #attributes: Doctrine\ORM\PersistentCollection {#7702 …} #variants: Doctrine\ORM\PersistentCollection {#7745 …} #options: Doctrine\ORM\PersistentCollection {#7917 …} #associations: Doctrine\ORM\PersistentCollection {#7901 …} #createdAt: DateTime @1751037499 {#7274 : 2025-06-27 17:18:19.0 Europe/Paris (+02:00) } #updatedAt: DateTime @1754606304 {#7322 : 2025-08-08 00:38:24.0 Europe/Paris (+02:00) } #enabled: true #translations: Doctrine\ORM\PersistentCollection {#7923 …} #translationsCache: [ "en_US" => App\Entity\Product\ProductTranslation {#7922 #locale: "en_US" #translatable: App\Entity\Product\Product {#7309} #id: 29149 #name: "IEEE 415:1986 (R1992)" #slug: "ieee-415-1986-r1992-ieee00000630-240187" #description: """ Revision Standard - Inactive-Withdrawn.<br />\n Directions for establishing an acceptable pre-operational testing program for Class 1E power systems in nuclear power generating stations are provided. The pre-operational tests are performed after the appropriate construction tests have been completed. Their purpose is to verify that the Class 1E power systems perform their required function as designed. The power systems are considered to include the ac and dc power supplies, but do not include the equipment that utilizes the power.<br />\n \t\t\t\t<br />\n This guide provides guidance for the planning of preoperational test programs for Class IE Power Systems for nuclear power generating stations. The extent of the systems shall be that covered by ANSI/IEEE Std 308-1980, IEEE Standard Criteria for Class IE Power Systems for Nuclear Power Generating Stations. An example system is illustrated in ANSI/IEEE Std 308-1980 [2], Fig-1. The power systems are considered to include the ac and dc power supplies, but do not include the equipment which utilizes the ac and dc power.<br />\n The purpose of this guide is to provide direction for establishing an acceptable preoperational testing program for Class IE Power Systems in nuclear power generating stations. The preoperational tests are performed after the appropriate construction tests have been completed. The purpose of preoperational tests is to verify that the Class IE Power Systems perform their required function as designed. """ #metaKeywords: null #metaDescription: null #shortDescription: "IEEE Guide for Planning of Preoperational Testing Programs for Class 1E Power Systems for Nuclear Power Generating Stations" -notes: "Inactive-Withdrawn" } ] #currentLocale: "en_US" #currentTranslation: null #fallbackLocale: "en_US" #variantSelectionMethod: "match" #productTaxons: Doctrine\ORM\PersistentCollection {#7535 …} #channels: Doctrine\ORM\PersistentCollection {#7629 …} #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7308 …} #reviews: Doctrine\ORM\PersistentCollection {#7614 …} #averageRating: 0.0 #images: Doctrine\ORM\PersistentCollection {#7646 …} -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7422 …} -subscriptionCollections: Doctrine\ORM\PersistentCollection {#7420 …} -apiLastModifiedAt: DateTime @1754517600 {#7317 : 2025-08-07 00:00:00.0 Europe/Paris (+02:00) } -lastUpdatedAt: DateTime @1578006000 {#7292 : 2020-01-03 00:00:00.0 Europe/Paris (+01:00) } -author: "" -publishedAt: DateTime @502930800 {#7318 : 1985-12-09 00:00:00.0 Europe/Paris (+01:00) } -releasedAt: null -confirmedAt: DateTime @708818400 {#7316 : 1992-06-18 00:00:00.0 Europe/Paris (+02:00) } -canceledAt: DateTime @890262000 {#7315 : 1998-03-19 00:00:00.0 Europe/Paris (+01:00) } -edition: null -coreDocument: "415" -bookCollection: "" -pageCount: 16 -documents: Doctrine\ORM\PersistentCollection {#7466 …} -favorites: Doctrine\ORM\PersistentCollection {#7501 …} } ] |
|||
| Attributes | [] |
|||
| Component | App\Twig\Components\ProductMostRecent {#93277 +product: App\Entity\Product\Product {#7309 #id: 8535 #code: "IEEE00000630" #attributes: Doctrine\ORM\PersistentCollection {#7702 …} #variants: Doctrine\ORM\PersistentCollection {#7745 …} #options: Doctrine\ORM\PersistentCollection {#7917 …} #associations: Doctrine\ORM\PersistentCollection {#7901 …} #createdAt: DateTime @1751037499 {#7274 : 2025-06-27 17:18:19.0 Europe/Paris (+02:00) } #updatedAt: DateTime @1754606304 {#7322 : 2025-08-08 00:38:24.0 Europe/Paris (+02:00) } #enabled: true #translations: Doctrine\ORM\PersistentCollection {#7923 …} #translationsCache: [ "en_US" => App\Entity\Product\ProductTranslation {#7922 #locale: "en_US" #translatable: App\Entity\Product\Product {#7309} #id: 29149 #name: "IEEE 415:1986 (R1992)" #slug: "ieee-415-1986-r1992-ieee00000630-240187" #description: """ Revision Standard - Inactive-Withdrawn.<br />\n Directions for establishing an acceptable pre-operational testing program for Class 1E power systems in nuclear power generating stations are provided. The pre-operational tests are performed after the appropriate construction tests have been completed. Their purpose is to verify that the Class 1E power systems perform their required function as designed. The power systems are considered to include the ac and dc power supplies, but do not include the equipment that utilizes the power.<br />\n \t\t\t\t<br />\n This guide provides guidance for the planning of preoperational test programs for Class IE Power Systems for nuclear power generating stations. The extent of the systems shall be that covered by ANSI/IEEE Std 308-1980, IEEE Standard Criteria for Class IE Power Systems for Nuclear Power Generating Stations. An example system is illustrated in ANSI/IEEE Std 308-1980 [2], Fig-1. The power systems are considered to include the ac and dc power supplies, but do not include the equipment which utilizes the ac and dc power.<br />\n The purpose of this guide is to provide direction for establishing an acceptable preoperational testing program for Class IE Power Systems in nuclear power generating stations. The preoperational tests are performed after the appropriate construction tests have been completed. The purpose of preoperational tests is to verify that the Class IE Power Systems perform their required function as designed. """ #metaKeywords: null #metaDescription: null #shortDescription: "IEEE Guide for Planning of Preoperational Testing Programs for Class 1E Power Systems for Nuclear Power Generating Stations" -notes: "Inactive-Withdrawn" } ] #currentLocale: "en_US" #currentTranslation: null #fallbackLocale: "en_US" #variantSelectionMethod: "match" #productTaxons: Doctrine\ORM\PersistentCollection {#7535 …} #channels: Doctrine\ORM\PersistentCollection {#7629 …} #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7308 …} #reviews: Doctrine\ORM\PersistentCollection {#7614 …} #averageRating: 0.0 #images: Doctrine\ORM\PersistentCollection {#7646 …} -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7422 …} -subscriptionCollections: Doctrine\ORM\PersistentCollection {#7420 …} -apiLastModifiedAt: DateTime @1754517600 {#7317 : 2025-08-07 00:00:00.0 Europe/Paris (+02:00) } -lastUpdatedAt: DateTime @1578006000 {#7292 : 2020-01-03 00:00:00.0 Europe/Paris (+01:00) } -author: "" -publishedAt: DateTime @502930800 {#7318 : 1985-12-09 00:00:00.0 Europe/Paris (+01:00) } -releasedAt: null -confirmedAt: DateTime @708818400 {#7316 : 1992-06-18 00:00:00.0 Europe/Paris (+02:00) } -canceledAt: DateTime @890262000 {#7315 : 1998-03-19 00:00:00.0 Europe/Paris (+01:00) } -edition: null -coreDocument: "415" -bookCollection: "" -pageCount: 16 -documents: Doctrine\ORM\PersistentCollection {#7466 …} -favorites: Doctrine\ORM\PersistentCollection {#7501 …} } +label: "Most Recent" +icon: "check-xs" -mostRecentAttributeCode: "most_recent" -localeContext: Sylius\Component\Locale\Context\CompositeLocaleContext {#1833 …} } |
|||
| ProductState | App\Twig\Components\ProductState | 206.0 MiB | 0.17 ms | |
|---|---|---|---|---|
| Input props | [ "product" => App\Entity\Product\Product {#100271 #id: 11676 #code: "IEEE00006436" #attributes: Doctrine\ORM\PersistentCollection {#100254 …} #variants: Doctrine\ORM\PersistentCollection {#100251 …} #options: Doctrine\ORM\PersistentCollection {#100247 …} #associations: Doctrine\ORM\PersistentCollection {#100249 …} #createdAt: DateTime @1751039888 {#100279 : 2025-06-27 17:58:08.0 Europe/Paris (+02:00) } #updatedAt: DateTime @1754608190 {#100252 : 2025-08-08 01:09:50.0 Europe/Paris (+02:00) } #enabled: true #translations: Doctrine\ORM\PersistentCollection {#100265 …} #translationsCache: [ "en_US" => App\Entity\Product\ProductTranslation {#100289 #locale: "en_US" #translatable: App\Entity\Product\Product {#100271} #id: 41713 #name: "IEEE 415:1976" #slug: "ieee-415-1976-ieee00006436-243328" #description: """ - Superseded.<br />\n <br />\n \t\t\t\t<br />\n This document provides guidance for pre-operational testing of Class IE Power systems for nuclear-power generating stations. The extent of the system shall be that covered by IEEE Std 308-1974, Standard Criteria for Class IE Power Systems for Nuclear Power Generating Stations. A system is illustrated by Fig 1. The power systems include both ac and dc supplies but do not include the equipment which utilizes the ac and dc power.<br />\n The purpose of this document is to provide direction for establishing an acceptable pre-operational testing program for Class IE power systems in nuclear-power generating stations. The pre-operational tests are performed after the appropriate construction tests have been completed. The purpose of the pre-operational tests is to verify that the functioning of Class IE power systems performs their required function as described in the Final Safety Analysis Report (FSAR) of the station. """ #metaKeywords: null #metaDescription: null #shortDescription: "IEEE Guide for Planning of Pre-operational Testing Programs for Class 1E Power Systems for Nuclear Power Generating Stations" -notes: "Superseded" } ] #currentLocale: "en_US" #currentTranslation: null #fallbackLocale: "en_US" #variantSelectionMethod: "match" #productTaxons: Doctrine\ORM\PersistentCollection {#100262 …} #channels: Doctrine\ORM\PersistentCollection {#100256 …} #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7308 …} #reviews: Doctrine\ORM\PersistentCollection {#100260 …} #averageRating: 0.0 #images: Doctrine\ORM\PersistentCollection {#100258 …} -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7422 …} -subscriptionCollections: Doctrine\ORM\PersistentCollection {#100272 …} -apiLastModifiedAt: DateTime @1754517600 {#100239 : 2025-08-07 00:00:00.0 Europe/Paris (+02:00) } -lastUpdatedAt: DateTime @1578006000 {#100278 : 2020-01-03 00:00:00.0 Europe/Paris (+01:00) } -author: "" -publishedAt: DateTime @218934000 {#100277 : 1976-12-09 00:00:00.0 Europe/Paris (+01:00) } -releasedAt: null -confirmedAt: null -canceledAt: null -edition: null -coreDocument: "415" -bookCollection: "" -pageCount: 10 -documents: Doctrine\ORM\PersistentCollection {#100269 …} -favorites: Doctrine\ORM\PersistentCollection {#100267 …} } "showFullLabel" => "true" ] |
|||
| Attributes | [ "showFullLabel" => "true" ] |
|||
| Component | App\Twig\Components\ProductState {#100325 +product: App\Entity\Product\Product {#100271 #id: 11676 #code: "IEEE00006436" #attributes: Doctrine\ORM\PersistentCollection {#100254 …} #variants: Doctrine\ORM\PersistentCollection {#100251 …} #options: Doctrine\ORM\PersistentCollection {#100247 …} #associations: Doctrine\ORM\PersistentCollection {#100249 …} #createdAt: DateTime @1751039888 {#100279 : 2025-06-27 17:58:08.0 Europe/Paris (+02:00) } #updatedAt: DateTime @1754608190 {#100252 : 2025-08-08 01:09:50.0 Europe/Paris (+02:00) } #enabled: true #translations: Doctrine\ORM\PersistentCollection {#100265 …} #translationsCache: [ "en_US" => App\Entity\Product\ProductTranslation {#100289 #locale: "en_US" #translatable: App\Entity\Product\Product {#100271} #id: 41713 #name: "IEEE 415:1976" #slug: "ieee-415-1976-ieee00006436-243328" #description: """ - Superseded.<br />\n <br />\n \t\t\t\t<br />\n This document provides guidance for pre-operational testing of Class IE Power systems for nuclear-power generating stations. The extent of the system shall be that covered by IEEE Std 308-1974, Standard Criteria for Class IE Power Systems for Nuclear Power Generating Stations. A system is illustrated by Fig 1. The power systems include both ac and dc supplies but do not include the equipment which utilizes the ac and dc power.<br />\n The purpose of this document is to provide direction for establishing an acceptable pre-operational testing program for Class IE power systems in nuclear-power generating stations. The pre-operational tests are performed after the appropriate construction tests have been completed. The purpose of the pre-operational tests is to verify that the functioning of Class IE power systems performs their required function as described in the Final Safety Analysis Report (FSAR) of the station. """ #metaKeywords: null #metaDescription: null #shortDescription: "IEEE Guide for Planning of Pre-operational Testing Programs for Class 1E Power Systems for Nuclear Power Generating Stations" -notes: "Superseded" } ] #currentLocale: "en_US" #currentTranslation: null #fallbackLocale: "en_US" #variantSelectionMethod: "match" #productTaxons: Doctrine\ORM\PersistentCollection {#100262 …} #channels: Doctrine\ORM\PersistentCollection {#100256 …} #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7308 …} #reviews: Doctrine\ORM\PersistentCollection {#100260 …} #averageRating: 0.0 #images: Doctrine\ORM\PersistentCollection {#100258 …} -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7422 …} -subscriptionCollections: Doctrine\ORM\PersistentCollection {#100272 …} -apiLastModifiedAt: DateTime @1754517600 {#100239 : 2025-08-07 00:00:00.0 Europe/Paris (+02:00) } -lastUpdatedAt: DateTime @1578006000 {#100278 : 2020-01-03 00:00:00.0 Europe/Paris (+01:00) } -author: "" -publishedAt: DateTime @218934000 {#100277 : 1976-12-09 00:00:00.0 Europe/Paris (+01:00) } -releasedAt: null -confirmedAt: null -canceledAt: null -edition: null -coreDocument: "415" -bookCollection: "" -pageCount: 10 -documents: Doctrine\ORM\PersistentCollection {#100269 …} -favorites: Doctrine\ORM\PersistentCollection {#100267 …} } +appearance: "state-suspended" +labels: [ "Superseded" ] -stateAttributeCode: "state" -localeContext: Sylius\Component\Locale\Context\CompositeLocaleContext {#1833 …} } |
|||
| ProductMostRecent | App\Twig\Components\ProductMostRecent | 206.0 MiB | 0.68 ms | |
|---|---|---|---|---|
| Input props | [ "product" => App\Entity\Product\Product {#100271 #id: 11676 #code: "IEEE00006436" #attributes: Doctrine\ORM\PersistentCollection {#100254 …} #variants: Doctrine\ORM\PersistentCollection {#100251 …} #options: Doctrine\ORM\PersistentCollection {#100247 …} #associations: Doctrine\ORM\PersistentCollection {#100249 …} #createdAt: DateTime @1751039888 {#100279 : 2025-06-27 17:58:08.0 Europe/Paris (+02:00) } #updatedAt: DateTime @1754608190 {#100252 : 2025-08-08 01:09:50.0 Europe/Paris (+02:00) } #enabled: true #translations: Doctrine\ORM\PersistentCollection {#100265 …} #translationsCache: [ "en_US" => App\Entity\Product\ProductTranslation {#100289 #locale: "en_US" #translatable: App\Entity\Product\Product {#100271} #id: 41713 #name: "IEEE 415:1976" #slug: "ieee-415-1976-ieee00006436-243328" #description: """ - Superseded.<br />\n <br />\n \t\t\t\t<br />\n This document provides guidance for pre-operational testing of Class IE Power systems for nuclear-power generating stations. The extent of the system shall be that covered by IEEE Std 308-1974, Standard Criteria for Class IE Power Systems for Nuclear Power Generating Stations. A system is illustrated by Fig 1. The power systems include both ac and dc supplies but do not include the equipment which utilizes the ac and dc power.<br />\n The purpose of this document is to provide direction for establishing an acceptable pre-operational testing program for Class IE power systems in nuclear-power generating stations. The pre-operational tests are performed after the appropriate construction tests have been completed. The purpose of the pre-operational tests is to verify that the functioning of Class IE power systems performs their required function as described in the Final Safety Analysis Report (FSAR) of the station. """ #metaKeywords: null #metaDescription: null #shortDescription: "IEEE Guide for Planning of Pre-operational Testing Programs for Class 1E Power Systems for Nuclear Power Generating Stations" -notes: "Superseded" } ] #currentLocale: "en_US" #currentTranslation: null #fallbackLocale: "en_US" #variantSelectionMethod: "match" #productTaxons: Doctrine\ORM\PersistentCollection {#100262 …} #channels: Doctrine\ORM\PersistentCollection {#100256 …} #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7308 …} #reviews: Doctrine\ORM\PersistentCollection {#100260 …} #averageRating: 0.0 #images: Doctrine\ORM\PersistentCollection {#100258 …} -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7422 …} -subscriptionCollections: Doctrine\ORM\PersistentCollection {#100272 …} -apiLastModifiedAt: DateTime @1754517600 {#100239 : 2025-08-07 00:00:00.0 Europe/Paris (+02:00) } -lastUpdatedAt: DateTime @1578006000 {#100278 : 2020-01-03 00:00:00.0 Europe/Paris (+01:00) } -author: "" -publishedAt: DateTime @218934000 {#100277 : 1976-12-09 00:00:00.0 Europe/Paris (+01:00) } -releasedAt: null -confirmedAt: null -canceledAt: null -edition: null -coreDocument: "415" -bookCollection: "" -pageCount: 10 -documents: Doctrine\ORM\PersistentCollection {#100269 …} -favorites: Doctrine\ORM\PersistentCollection {#100267 …} } ] |
|||
| Attributes | [] |
|||
| Component | App\Twig\Components\ProductMostRecent {#100392 +product: App\Entity\Product\Product {#100271 #id: 11676 #code: "IEEE00006436" #attributes: Doctrine\ORM\PersistentCollection {#100254 …} #variants: Doctrine\ORM\PersistentCollection {#100251 …} #options: Doctrine\ORM\PersistentCollection {#100247 …} #associations: Doctrine\ORM\PersistentCollection {#100249 …} #createdAt: DateTime @1751039888 {#100279 : 2025-06-27 17:58:08.0 Europe/Paris (+02:00) } #updatedAt: DateTime @1754608190 {#100252 : 2025-08-08 01:09:50.0 Europe/Paris (+02:00) } #enabled: true #translations: Doctrine\ORM\PersistentCollection {#100265 …} #translationsCache: [ "en_US" => App\Entity\Product\ProductTranslation {#100289 #locale: "en_US" #translatable: App\Entity\Product\Product {#100271} #id: 41713 #name: "IEEE 415:1976" #slug: "ieee-415-1976-ieee00006436-243328" #description: """ - Superseded.<br />\n <br />\n \t\t\t\t<br />\n This document provides guidance for pre-operational testing of Class IE Power systems for nuclear-power generating stations. The extent of the system shall be that covered by IEEE Std 308-1974, Standard Criteria for Class IE Power Systems for Nuclear Power Generating Stations. A system is illustrated by Fig 1. The power systems include both ac and dc supplies but do not include the equipment which utilizes the ac and dc power.<br />\n The purpose of this document is to provide direction for establishing an acceptable pre-operational testing program for Class IE power systems in nuclear-power generating stations. The pre-operational tests are performed after the appropriate construction tests have been completed. The purpose of the pre-operational tests is to verify that the functioning of Class IE power systems performs their required function as described in the Final Safety Analysis Report (FSAR) of the station. """ #metaKeywords: null #metaDescription: null #shortDescription: "IEEE Guide for Planning of Pre-operational Testing Programs for Class 1E Power Systems for Nuclear Power Generating Stations" -notes: "Superseded" } ] #currentLocale: "en_US" #currentTranslation: null #fallbackLocale: "en_US" #variantSelectionMethod: "match" #productTaxons: Doctrine\ORM\PersistentCollection {#100262 …} #channels: Doctrine\ORM\PersistentCollection {#100256 …} #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7308 …} #reviews: Doctrine\ORM\PersistentCollection {#100260 …} #averageRating: 0.0 #images: Doctrine\ORM\PersistentCollection {#100258 …} -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7422 …} -subscriptionCollections: Doctrine\ORM\PersistentCollection {#100272 …} -apiLastModifiedAt: DateTime @1754517600 {#100239 : 2025-08-07 00:00:00.0 Europe/Paris (+02:00) } -lastUpdatedAt: DateTime @1578006000 {#100278 : 2020-01-03 00:00:00.0 Europe/Paris (+01:00) } -author: "" -publishedAt: DateTime @218934000 {#100277 : 1976-12-09 00:00:00.0 Europe/Paris (+01:00) } -releasedAt: null -confirmedAt: null -canceledAt: null -edition: null -coreDocument: "415" -bookCollection: "" -pageCount: 10 -documents: Doctrine\ORM\PersistentCollection {#100269 …} -favorites: Doctrine\ORM\PersistentCollection {#100267 …} } +label: "Historical" +icon: "historical" -mostRecentAttributeCode: "most_recent" -localeContext: Sylius\Component\Locale\Context\CompositeLocaleContext {#1833 …} } |
|||
| ProductState | App\Twig\Components\ProductState | 206.0 MiB | 0.16 ms | |
|---|---|---|---|---|
| Input props | [ "product" => App\Entity\Product\Product {#7309 #id: 8535 #code: "IEEE00000630" #attributes: Doctrine\ORM\PersistentCollection {#7702 …} #variants: Doctrine\ORM\PersistentCollection {#7745 …} #options: Doctrine\ORM\PersistentCollection {#7917 …} #associations: Doctrine\ORM\PersistentCollection {#7901 …} #createdAt: DateTime @1751037499 {#7274 : 2025-06-27 17:18:19.0 Europe/Paris (+02:00) } #updatedAt: DateTime @1754606304 {#7322 : 2025-08-08 00:38:24.0 Europe/Paris (+02:00) } #enabled: true #translations: Doctrine\ORM\PersistentCollection {#7923 …} #translationsCache: [ "en_US" => App\Entity\Product\ProductTranslation {#7922 #locale: "en_US" #translatable: App\Entity\Product\Product {#7309} #id: 29149 #name: "IEEE 415:1986 (R1992)" #slug: "ieee-415-1986-r1992-ieee00000630-240187" #description: """ Revision Standard - Inactive-Withdrawn.<br />\n Directions for establishing an acceptable pre-operational testing program for Class 1E power systems in nuclear power generating stations are provided. The pre-operational tests are performed after the appropriate construction tests have been completed. Their purpose is to verify that the Class 1E power systems perform their required function as designed. The power systems are considered to include the ac and dc power supplies, but do not include the equipment that utilizes the power.<br />\n \t\t\t\t<br />\n This guide provides guidance for the planning of preoperational test programs for Class IE Power Systems for nuclear power generating stations. The extent of the systems shall be that covered by ANSI/IEEE Std 308-1980, IEEE Standard Criteria for Class IE Power Systems for Nuclear Power Generating Stations. An example system is illustrated in ANSI/IEEE Std 308-1980 [2], Fig-1. The power systems are considered to include the ac and dc power supplies, but do not include the equipment which utilizes the ac and dc power.<br />\n The purpose of this guide is to provide direction for establishing an acceptable preoperational testing program for Class IE Power Systems in nuclear power generating stations. The preoperational tests are performed after the appropriate construction tests have been completed. The purpose of preoperational tests is to verify that the Class IE Power Systems perform their required function as designed. """ #metaKeywords: null #metaDescription: null #shortDescription: "IEEE Guide for Planning of Preoperational Testing Programs for Class 1E Power Systems for Nuclear Power Generating Stations" -notes: "Inactive-Withdrawn" } ] #currentLocale: "en_US" #currentTranslation: null #fallbackLocale: "en_US" #variantSelectionMethod: "match" #productTaxons: Doctrine\ORM\PersistentCollection {#7535 …} #channels: Doctrine\ORM\PersistentCollection {#7629 …} #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7308 …} #reviews: Doctrine\ORM\PersistentCollection {#7614 …} #averageRating: 0.0 #images: Doctrine\ORM\PersistentCollection {#7646 …} -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7422 …} -subscriptionCollections: Doctrine\ORM\PersistentCollection {#7420 …} -apiLastModifiedAt: DateTime @1754517600 {#7317 : 2025-08-07 00:00:00.0 Europe/Paris (+02:00) } -lastUpdatedAt: DateTime @1578006000 {#7292 : 2020-01-03 00:00:00.0 Europe/Paris (+01:00) } -author: "" -publishedAt: DateTime @502930800 {#7318 : 1985-12-09 00:00:00.0 Europe/Paris (+01:00) } -releasedAt: null -confirmedAt: DateTime @708818400 {#7316 : 1992-06-18 00:00:00.0 Europe/Paris (+02:00) } -canceledAt: DateTime @890262000 {#7315 : 1998-03-19 00:00:00.0 Europe/Paris (+01:00) } -edition: null -coreDocument: "415" -bookCollection: "" -pageCount: 16 -documents: Doctrine\ORM\PersistentCollection {#7466 …} -favorites: Doctrine\ORM\PersistentCollection {#7501 …} } "showFullLabel" => "true" ] |
|||
| Attributes | [ "showFullLabel" => "true" ] |
|||
| Component | App\Twig\Components\ProductState {#106976 +product: App\Entity\Product\Product {#7309 #id: 8535 #code: "IEEE00000630" #attributes: Doctrine\ORM\PersistentCollection {#7702 …} #variants: Doctrine\ORM\PersistentCollection {#7745 …} #options: Doctrine\ORM\PersistentCollection {#7917 …} #associations: Doctrine\ORM\PersistentCollection {#7901 …} #createdAt: DateTime @1751037499 {#7274 : 2025-06-27 17:18:19.0 Europe/Paris (+02:00) } #updatedAt: DateTime @1754606304 {#7322 : 2025-08-08 00:38:24.0 Europe/Paris (+02:00) } #enabled: true #translations: Doctrine\ORM\PersistentCollection {#7923 …} #translationsCache: [ "en_US" => App\Entity\Product\ProductTranslation {#7922 #locale: "en_US" #translatable: App\Entity\Product\Product {#7309} #id: 29149 #name: "IEEE 415:1986 (R1992)" #slug: "ieee-415-1986-r1992-ieee00000630-240187" #description: """ Revision Standard - Inactive-Withdrawn.<br />\n Directions for establishing an acceptable pre-operational testing program for Class 1E power systems in nuclear power generating stations are provided. The pre-operational tests are performed after the appropriate construction tests have been completed. Their purpose is to verify that the Class 1E power systems perform their required function as designed. The power systems are considered to include the ac and dc power supplies, but do not include the equipment that utilizes the power.<br />\n \t\t\t\t<br />\n This guide provides guidance for the planning of preoperational test programs for Class IE Power Systems for nuclear power generating stations. The extent of the systems shall be that covered by ANSI/IEEE Std 308-1980, IEEE Standard Criteria for Class IE Power Systems for Nuclear Power Generating Stations. An example system is illustrated in ANSI/IEEE Std 308-1980 [2], Fig-1. The power systems are considered to include the ac and dc power supplies, but do not include the equipment which utilizes the ac and dc power.<br />\n The purpose of this guide is to provide direction for establishing an acceptable preoperational testing program for Class IE Power Systems in nuclear power generating stations. The preoperational tests are performed after the appropriate construction tests have been completed. The purpose of preoperational tests is to verify that the Class IE Power Systems perform their required function as designed. """ #metaKeywords: null #metaDescription: null #shortDescription: "IEEE Guide for Planning of Preoperational Testing Programs for Class 1E Power Systems for Nuclear Power Generating Stations" -notes: "Inactive-Withdrawn" } ] #currentLocale: "en_US" #currentTranslation: null #fallbackLocale: "en_US" #variantSelectionMethod: "match" #productTaxons: Doctrine\ORM\PersistentCollection {#7535 …} #channels: Doctrine\ORM\PersistentCollection {#7629 …} #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7308 …} #reviews: Doctrine\ORM\PersistentCollection {#7614 …} #averageRating: 0.0 #images: Doctrine\ORM\PersistentCollection {#7646 …} -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7422 …} -subscriptionCollections: Doctrine\ORM\PersistentCollection {#7420 …} -apiLastModifiedAt: DateTime @1754517600 {#7317 : 2025-08-07 00:00:00.0 Europe/Paris (+02:00) } -lastUpdatedAt: DateTime @1578006000 {#7292 : 2020-01-03 00:00:00.0 Europe/Paris (+01:00) } -author: "" -publishedAt: DateTime @502930800 {#7318 : 1985-12-09 00:00:00.0 Europe/Paris (+01:00) } -releasedAt: null -confirmedAt: DateTime @708818400 {#7316 : 1992-06-18 00:00:00.0 Europe/Paris (+02:00) } -canceledAt: DateTime @890262000 {#7315 : 1998-03-19 00:00:00.0 Europe/Paris (+01:00) } -edition: null -coreDocument: "415" -bookCollection: "" -pageCount: 16 -documents: Doctrine\ORM\PersistentCollection {#7466 …} -favorites: Doctrine\ORM\PersistentCollection {#7501 …} } +appearance: "state-withdrawn" +labels: [ "Withdrawn" "Confirmed" ] -stateAttributeCode: "state" -localeContext: Sylius\Component\Locale\Context\CompositeLocaleContext {#1833 …} } |
|||
| ProductMostRecent | App\Twig\Components\ProductMostRecent | 206.0 MiB | 0.63 ms | |
|---|---|---|---|---|
| Input props | [ "product" => App\Entity\Product\Product {#7309 #id: 8535 #code: "IEEE00000630" #attributes: Doctrine\ORM\PersistentCollection {#7702 …} #variants: Doctrine\ORM\PersistentCollection {#7745 …} #options: Doctrine\ORM\PersistentCollection {#7917 …} #associations: Doctrine\ORM\PersistentCollection {#7901 …} #createdAt: DateTime @1751037499 {#7274 : 2025-06-27 17:18:19.0 Europe/Paris (+02:00) } #updatedAt: DateTime @1754606304 {#7322 : 2025-08-08 00:38:24.0 Europe/Paris (+02:00) } #enabled: true #translations: Doctrine\ORM\PersistentCollection {#7923 …} #translationsCache: [ "en_US" => App\Entity\Product\ProductTranslation {#7922 #locale: "en_US" #translatable: App\Entity\Product\Product {#7309} #id: 29149 #name: "IEEE 415:1986 (R1992)" #slug: "ieee-415-1986-r1992-ieee00000630-240187" #description: """ Revision Standard - Inactive-Withdrawn.<br />\n Directions for establishing an acceptable pre-operational testing program for Class 1E power systems in nuclear power generating stations are provided. The pre-operational tests are performed after the appropriate construction tests have been completed. Their purpose is to verify that the Class 1E power systems perform their required function as designed. The power systems are considered to include the ac and dc power supplies, but do not include the equipment that utilizes the power.<br />\n \t\t\t\t<br />\n This guide provides guidance for the planning of preoperational test programs for Class IE Power Systems for nuclear power generating stations. The extent of the systems shall be that covered by ANSI/IEEE Std 308-1980, IEEE Standard Criteria for Class IE Power Systems for Nuclear Power Generating Stations. An example system is illustrated in ANSI/IEEE Std 308-1980 [2], Fig-1. The power systems are considered to include the ac and dc power supplies, but do not include the equipment which utilizes the ac and dc power.<br />\n The purpose of this guide is to provide direction for establishing an acceptable preoperational testing program for Class IE Power Systems in nuclear power generating stations. The preoperational tests are performed after the appropriate construction tests have been completed. The purpose of preoperational tests is to verify that the Class IE Power Systems perform their required function as designed. """ #metaKeywords: null #metaDescription: null #shortDescription: "IEEE Guide for Planning of Preoperational Testing Programs for Class 1E Power Systems for Nuclear Power Generating Stations" -notes: "Inactive-Withdrawn" } ] #currentLocale: "en_US" #currentTranslation: null #fallbackLocale: "en_US" #variantSelectionMethod: "match" #productTaxons: Doctrine\ORM\PersistentCollection {#7535 …} #channels: Doctrine\ORM\PersistentCollection {#7629 …} #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7308 …} #reviews: Doctrine\ORM\PersistentCollection {#7614 …} #averageRating: 0.0 #images: Doctrine\ORM\PersistentCollection {#7646 …} -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7422 …} -subscriptionCollections: Doctrine\ORM\PersistentCollection {#7420 …} -apiLastModifiedAt: DateTime @1754517600 {#7317 : 2025-08-07 00:00:00.0 Europe/Paris (+02:00) } -lastUpdatedAt: DateTime @1578006000 {#7292 : 2020-01-03 00:00:00.0 Europe/Paris (+01:00) } -author: "" -publishedAt: DateTime @502930800 {#7318 : 1985-12-09 00:00:00.0 Europe/Paris (+01:00) } -releasedAt: null -confirmedAt: DateTime @708818400 {#7316 : 1992-06-18 00:00:00.0 Europe/Paris (+02:00) } -canceledAt: DateTime @890262000 {#7315 : 1998-03-19 00:00:00.0 Europe/Paris (+01:00) } -edition: null -coreDocument: "415" -bookCollection: "" -pageCount: 16 -documents: Doctrine\ORM\PersistentCollection {#7466 …} -favorites: Doctrine\ORM\PersistentCollection {#7501 …} } ] |
|||
| Attributes | [] |
|||
| Component | App\Twig\Components\ProductMostRecent {#107018 +product: App\Entity\Product\Product {#7309 #id: 8535 #code: "IEEE00000630" #attributes: Doctrine\ORM\PersistentCollection {#7702 …} #variants: Doctrine\ORM\PersistentCollection {#7745 …} #options: Doctrine\ORM\PersistentCollection {#7917 …} #associations: Doctrine\ORM\PersistentCollection {#7901 …} #createdAt: DateTime @1751037499 {#7274 : 2025-06-27 17:18:19.0 Europe/Paris (+02:00) } #updatedAt: DateTime @1754606304 {#7322 : 2025-08-08 00:38:24.0 Europe/Paris (+02:00) } #enabled: true #translations: Doctrine\ORM\PersistentCollection {#7923 …} #translationsCache: [ "en_US" => App\Entity\Product\ProductTranslation {#7922 #locale: "en_US" #translatable: App\Entity\Product\Product {#7309} #id: 29149 #name: "IEEE 415:1986 (R1992)" #slug: "ieee-415-1986-r1992-ieee00000630-240187" #description: """ Revision Standard - Inactive-Withdrawn.<br />\n Directions for establishing an acceptable pre-operational testing program for Class 1E power systems in nuclear power generating stations are provided. The pre-operational tests are performed after the appropriate construction tests have been completed. Their purpose is to verify that the Class 1E power systems perform their required function as designed. The power systems are considered to include the ac and dc power supplies, but do not include the equipment that utilizes the power.<br />\n \t\t\t\t<br />\n This guide provides guidance for the planning of preoperational test programs for Class IE Power Systems for nuclear power generating stations. The extent of the systems shall be that covered by ANSI/IEEE Std 308-1980, IEEE Standard Criteria for Class IE Power Systems for Nuclear Power Generating Stations. An example system is illustrated in ANSI/IEEE Std 308-1980 [2], Fig-1. The power systems are considered to include the ac and dc power supplies, but do not include the equipment which utilizes the ac and dc power.<br />\n The purpose of this guide is to provide direction for establishing an acceptable preoperational testing program for Class IE Power Systems in nuclear power generating stations. The preoperational tests are performed after the appropriate construction tests have been completed. The purpose of preoperational tests is to verify that the Class IE Power Systems perform their required function as designed. """ #metaKeywords: null #metaDescription: null #shortDescription: "IEEE Guide for Planning of Preoperational Testing Programs for Class 1E Power Systems for Nuclear Power Generating Stations" -notes: "Inactive-Withdrawn" } ] #currentLocale: "en_US" #currentTranslation: null #fallbackLocale: "en_US" #variantSelectionMethod: "match" #productTaxons: Doctrine\ORM\PersistentCollection {#7535 …} #channels: Doctrine\ORM\PersistentCollection {#7629 …} #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7308 …} #reviews: Doctrine\ORM\PersistentCollection {#7614 …} #averageRating: 0.0 #images: Doctrine\ORM\PersistentCollection {#7646 …} -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7422 …} -subscriptionCollections: Doctrine\ORM\PersistentCollection {#7420 …} -apiLastModifiedAt: DateTime @1754517600 {#7317 : 2025-08-07 00:00:00.0 Europe/Paris (+02:00) } -lastUpdatedAt: DateTime @1578006000 {#7292 : 2020-01-03 00:00:00.0 Europe/Paris (+01:00) } -author: "" -publishedAt: DateTime @502930800 {#7318 : 1985-12-09 00:00:00.0 Europe/Paris (+01:00) } -releasedAt: null -confirmedAt: DateTime @708818400 {#7316 : 1992-06-18 00:00:00.0 Europe/Paris (+02:00) } -canceledAt: DateTime @890262000 {#7315 : 1998-03-19 00:00:00.0 Europe/Paris (+01:00) } -edition: null -coreDocument: "415" -bookCollection: "" -pageCount: 16 -documents: Doctrine\ORM\PersistentCollection {#7466 …} -favorites: Doctrine\ORM\PersistentCollection {#7501 …} } +label: "Most Recent" +icon: "check-xs" -mostRecentAttributeCode: "most_recent" -localeContext: Sylius\Component\Locale\Context\CompositeLocaleContext {#1833 …} } |
|||
| ProductState | App\Twig\Components\ProductState | 206.0 MiB | 0.15 ms | |
|---|---|---|---|---|
| Input props | [ "product" => App\Entity\Product\Product {#100271 #id: 11676 #code: "IEEE00006436" #attributes: Doctrine\ORM\PersistentCollection {#100254 …} #variants: Doctrine\ORM\PersistentCollection {#100251 …} #options: Doctrine\ORM\PersistentCollection {#100247 …} #associations: Doctrine\ORM\PersistentCollection {#100249 …} #createdAt: DateTime @1751039888 {#100279 : 2025-06-27 17:58:08.0 Europe/Paris (+02:00) } #updatedAt: DateTime @1754608190 {#100252 : 2025-08-08 01:09:50.0 Europe/Paris (+02:00) } #enabled: true #translations: Doctrine\ORM\PersistentCollection {#100265 …} #translationsCache: [ "en_US" => App\Entity\Product\ProductTranslation {#100289 #locale: "en_US" #translatable: App\Entity\Product\Product {#100271} #id: 41713 #name: "IEEE 415:1976" #slug: "ieee-415-1976-ieee00006436-243328" #description: """ - Superseded.<br />\n <br />\n \t\t\t\t<br />\n This document provides guidance for pre-operational testing of Class IE Power systems for nuclear-power generating stations. The extent of the system shall be that covered by IEEE Std 308-1974, Standard Criteria for Class IE Power Systems for Nuclear Power Generating Stations. A system is illustrated by Fig 1. The power systems include both ac and dc supplies but do not include the equipment which utilizes the ac and dc power.<br />\n The purpose of this document is to provide direction for establishing an acceptable pre-operational testing program for Class IE power systems in nuclear-power generating stations. The pre-operational tests are performed after the appropriate construction tests have been completed. The purpose of the pre-operational tests is to verify that the functioning of Class IE power systems performs their required function as described in the Final Safety Analysis Report (FSAR) of the station. """ #metaKeywords: null #metaDescription: null #shortDescription: "IEEE Guide for Planning of Pre-operational Testing Programs for Class 1E Power Systems for Nuclear Power Generating Stations" -notes: "Superseded" } ] #currentLocale: "en_US" #currentTranslation: null #fallbackLocale: "en_US" #variantSelectionMethod: "match" #productTaxons: Doctrine\ORM\PersistentCollection {#100262 …} #channels: Doctrine\ORM\PersistentCollection {#100256 …} #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7308 …} #reviews: Doctrine\ORM\PersistentCollection {#100260 …} #averageRating: 0.0 #images: Doctrine\ORM\PersistentCollection {#100258 …} -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7422 …} -subscriptionCollections: Doctrine\ORM\PersistentCollection {#100272 …} -apiLastModifiedAt: DateTime @1754517600 {#100239 : 2025-08-07 00:00:00.0 Europe/Paris (+02:00) } -lastUpdatedAt: DateTime @1578006000 {#100278 : 2020-01-03 00:00:00.0 Europe/Paris (+01:00) } -author: "" -publishedAt: DateTime @218934000 {#100277 : 1976-12-09 00:00:00.0 Europe/Paris (+01:00) } -releasedAt: null -confirmedAt: null -canceledAt: null -edition: null -coreDocument: "415" -bookCollection: "" -pageCount: 10 -documents: Doctrine\ORM\PersistentCollection {#100269 …} -favorites: Doctrine\ORM\PersistentCollection {#100267 …} } "showFullLabel" => "true" ] |
|||
| Attributes | [ "showFullLabel" => "true" ] |
|||
| Component | App\Twig\Components\ProductState {#107083 +product: App\Entity\Product\Product {#100271 #id: 11676 #code: "IEEE00006436" #attributes: Doctrine\ORM\PersistentCollection {#100254 …} #variants: Doctrine\ORM\PersistentCollection {#100251 …} #options: Doctrine\ORM\PersistentCollection {#100247 …} #associations: Doctrine\ORM\PersistentCollection {#100249 …} #createdAt: DateTime @1751039888 {#100279 : 2025-06-27 17:58:08.0 Europe/Paris (+02:00) } #updatedAt: DateTime @1754608190 {#100252 : 2025-08-08 01:09:50.0 Europe/Paris (+02:00) } #enabled: true #translations: Doctrine\ORM\PersistentCollection {#100265 …} #translationsCache: [ "en_US" => App\Entity\Product\ProductTranslation {#100289 #locale: "en_US" #translatable: App\Entity\Product\Product {#100271} #id: 41713 #name: "IEEE 415:1976" #slug: "ieee-415-1976-ieee00006436-243328" #description: """ - Superseded.<br />\n <br />\n \t\t\t\t<br />\n This document provides guidance for pre-operational testing of Class IE Power systems for nuclear-power generating stations. The extent of the system shall be that covered by IEEE Std 308-1974, Standard Criteria for Class IE Power Systems for Nuclear Power Generating Stations. A system is illustrated by Fig 1. The power systems include both ac and dc supplies but do not include the equipment which utilizes the ac and dc power.<br />\n The purpose of this document is to provide direction for establishing an acceptable pre-operational testing program for Class IE power systems in nuclear-power generating stations. The pre-operational tests are performed after the appropriate construction tests have been completed. The purpose of the pre-operational tests is to verify that the functioning of Class IE power systems performs their required function as described in the Final Safety Analysis Report (FSAR) of the station. """ #metaKeywords: null #metaDescription: null #shortDescription: "IEEE Guide for Planning of Pre-operational Testing Programs for Class 1E Power Systems for Nuclear Power Generating Stations" -notes: "Superseded" } ] #currentLocale: "en_US" #currentTranslation: null #fallbackLocale: "en_US" #variantSelectionMethod: "match" #productTaxons: Doctrine\ORM\PersistentCollection {#100262 …} #channels: Doctrine\ORM\PersistentCollection {#100256 …} #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7308 …} #reviews: Doctrine\ORM\PersistentCollection {#100260 …} #averageRating: 0.0 #images: Doctrine\ORM\PersistentCollection {#100258 …} -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7422 …} -subscriptionCollections: Doctrine\ORM\PersistentCollection {#100272 …} -apiLastModifiedAt: DateTime @1754517600 {#100239 : 2025-08-07 00:00:00.0 Europe/Paris (+02:00) } -lastUpdatedAt: DateTime @1578006000 {#100278 : 2020-01-03 00:00:00.0 Europe/Paris (+01:00) } -author: "" -publishedAt: DateTime @218934000 {#100277 : 1976-12-09 00:00:00.0 Europe/Paris (+01:00) } -releasedAt: null -confirmedAt: null -canceledAt: null -edition: null -coreDocument: "415" -bookCollection: "" -pageCount: 10 -documents: Doctrine\ORM\PersistentCollection {#100269 …} -favorites: Doctrine\ORM\PersistentCollection {#100267 …} } +appearance: "state-suspended" +labels: [ "Superseded" ] -stateAttributeCode: "state" -localeContext: Sylius\Component\Locale\Context\CompositeLocaleContext {#1833 …} } |
|||
| ProductMostRecent | App\Twig\Components\ProductMostRecent | 206.0 MiB | 0.55 ms | |
|---|---|---|---|---|
| Input props | [ "product" => App\Entity\Product\Product {#100271 #id: 11676 #code: "IEEE00006436" #attributes: Doctrine\ORM\PersistentCollection {#100254 …} #variants: Doctrine\ORM\PersistentCollection {#100251 …} #options: Doctrine\ORM\PersistentCollection {#100247 …} #associations: Doctrine\ORM\PersistentCollection {#100249 …} #createdAt: DateTime @1751039888 {#100279 : 2025-06-27 17:58:08.0 Europe/Paris (+02:00) } #updatedAt: DateTime @1754608190 {#100252 : 2025-08-08 01:09:50.0 Europe/Paris (+02:00) } #enabled: true #translations: Doctrine\ORM\PersistentCollection {#100265 …} #translationsCache: [ "en_US" => App\Entity\Product\ProductTranslation {#100289 #locale: "en_US" #translatable: App\Entity\Product\Product {#100271} #id: 41713 #name: "IEEE 415:1976" #slug: "ieee-415-1976-ieee00006436-243328" #description: """ - Superseded.<br />\n <br />\n \t\t\t\t<br />\n This document provides guidance for pre-operational testing of Class IE Power systems for nuclear-power generating stations. The extent of the system shall be that covered by IEEE Std 308-1974, Standard Criteria for Class IE Power Systems for Nuclear Power Generating Stations. A system is illustrated by Fig 1. The power systems include both ac and dc supplies but do not include the equipment which utilizes the ac and dc power.<br />\n The purpose of this document is to provide direction for establishing an acceptable pre-operational testing program for Class IE power systems in nuclear-power generating stations. The pre-operational tests are performed after the appropriate construction tests have been completed. The purpose of the pre-operational tests is to verify that the functioning of Class IE power systems performs their required function as described in the Final Safety Analysis Report (FSAR) of the station. """ #metaKeywords: null #metaDescription: null #shortDescription: "IEEE Guide for Planning of Pre-operational Testing Programs for Class 1E Power Systems for Nuclear Power Generating Stations" -notes: "Superseded" } ] #currentLocale: "en_US" #currentTranslation: null #fallbackLocale: "en_US" #variantSelectionMethod: "match" #productTaxons: Doctrine\ORM\PersistentCollection {#100262 …} #channels: Doctrine\ORM\PersistentCollection {#100256 …} #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7308 …} #reviews: Doctrine\ORM\PersistentCollection {#100260 …} #averageRating: 0.0 #images: Doctrine\ORM\PersistentCollection {#100258 …} -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7422 …} -subscriptionCollections: Doctrine\ORM\PersistentCollection {#100272 …} -apiLastModifiedAt: DateTime @1754517600 {#100239 : 2025-08-07 00:00:00.0 Europe/Paris (+02:00) } -lastUpdatedAt: DateTime @1578006000 {#100278 : 2020-01-03 00:00:00.0 Europe/Paris (+01:00) } -author: "" -publishedAt: DateTime @218934000 {#100277 : 1976-12-09 00:00:00.0 Europe/Paris (+01:00) } -releasedAt: null -confirmedAt: null -canceledAt: null -edition: null -coreDocument: "415" -bookCollection: "" -pageCount: 10 -documents: Doctrine\ORM\PersistentCollection {#100269 …} -favorites: Doctrine\ORM\PersistentCollection {#100267 …} } ] |
|||
| Attributes | [] |
|||
| Component | App\Twig\Components\ProductMostRecent {#107110 +product: App\Entity\Product\Product {#100271 #id: 11676 #code: "IEEE00006436" #attributes: Doctrine\ORM\PersistentCollection {#100254 …} #variants: Doctrine\ORM\PersistentCollection {#100251 …} #options: Doctrine\ORM\PersistentCollection {#100247 …} #associations: Doctrine\ORM\PersistentCollection {#100249 …} #createdAt: DateTime @1751039888 {#100279 : 2025-06-27 17:58:08.0 Europe/Paris (+02:00) } #updatedAt: DateTime @1754608190 {#100252 : 2025-08-08 01:09:50.0 Europe/Paris (+02:00) } #enabled: true #translations: Doctrine\ORM\PersistentCollection {#100265 …} #translationsCache: [ "en_US" => App\Entity\Product\ProductTranslation {#100289 #locale: "en_US" #translatable: App\Entity\Product\Product {#100271} #id: 41713 #name: "IEEE 415:1976" #slug: "ieee-415-1976-ieee00006436-243328" #description: """ - Superseded.<br />\n <br />\n \t\t\t\t<br />\n This document provides guidance for pre-operational testing of Class IE Power systems for nuclear-power generating stations. The extent of the system shall be that covered by IEEE Std 308-1974, Standard Criteria for Class IE Power Systems for Nuclear Power Generating Stations. A system is illustrated by Fig 1. The power systems include both ac and dc supplies but do not include the equipment which utilizes the ac and dc power.<br />\n The purpose of this document is to provide direction for establishing an acceptable pre-operational testing program for Class IE power systems in nuclear-power generating stations. The pre-operational tests are performed after the appropriate construction tests have been completed. The purpose of the pre-operational tests is to verify that the functioning of Class IE power systems performs their required function as described in the Final Safety Analysis Report (FSAR) of the station. """ #metaKeywords: null #metaDescription: null #shortDescription: "IEEE Guide for Planning of Pre-operational Testing Programs for Class 1E Power Systems for Nuclear Power Generating Stations" -notes: "Superseded" } ] #currentLocale: "en_US" #currentTranslation: null #fallbackLocale: "en_US" #variantSelectionMethod: "match" #productTaxons: Doctrine\ORM\PersistentCollection {#100262 …} #channels: Doctrine\ORM\PersistentCollection {#100256 …} #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7308 …} #reviews: Doctrine\ORM\PersistentCollection {#100260 …} #averageRating: 0.0 #images: Doctrine\ORM\PersistentCollection {#100258 …} -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7422 …} -subscriptionCollections: Doctrine\ORM\PersistentCollection {#100272 …} -apiLastModifiedAt: DateTime @1754517600 {#100239 : 2025-08-07 00:00:00.0 Europe/Paris (+02:00) } -lastUpdatedAt: DateTime @1578006000 {#100278 : 2020-01-03 00:00:00.0 Europe/Paris (+01:00) } -author: "" -publishedAt: DateTime @218934000 {#100277 : 1976-12-09 00:00:00.0 Europe/Paris (+01:00) } -releasedAt: null -confirmedAt: null -canceledAt: null -edition: null -coreDocument: "415" -bookCollection: "" -pageCount: 10 -documents: Doctrine\ORM\PersistentCollection {#100269 …} -favorites: Doctrine\ORM\PersistentCollection {#100267 …} } +label: "Historical" +icon: "historical" -mostRecentAttributeCode: "most_recent" -localeContext: Sylius\Component\Locale\Context\CompositeLocaleContext {#1833 …} } |
|||
| ProductCard | App\Twig\Components\ProductCard | 206.0 MiB | 6.12 ms | |
|---|---|---|---|---|
| Input props | [ "product" => App\Entity\Product\Product {#128388 #id: 8461 #code: "IEEE00000505" #attributes: Doctrine\ORM\PersistentCollection {#128406 …} #variants: Doctrine\ORM\PersistentCollection {#128404 …} #options: Doctrine\ORM\PersistentCollection {#128399 …} #associations: Doctrine\ORM\PersistentCollection {#128402 …} #createdAt: DateTime @1751037435 {#128395 : 2025-06-27 17:17:15.0 Europe/Paris (+02:00) } #updatedAt: DateTime @1754606304 {#128429 : 2025-08-08 00:38:24.0 Europe/Paris (+02:00) } #enabled: true #translations: Doctrine\ORM\PersistentCollection {#128417 …} #translationsCache: [ "en_US" => App\Entity\Product\ProductTranslation {#128506 #locale: "en_US" #translatable: App\Entity\Product\Product {#128388} #id: 28853 #name: "IEEE 308:1980" #slug: "ieee-308-1980-ieee00000505-240113" #description: """ New IEEE Standard - Superseded.<br />\n Superseded by 308-1991. Class 1E portions of AC and DC power systems and instrumentation and control power systems in single-unit and multiunit nuclear power generating stations are covered. Not included are the preferred power supply; unit generator(s) and their buses; generator breaker; step-up, auxiliary, and start-up transformers; connections to the station switchyard; switchyard; transmission lines; and the transmission network. The intent is to provide criteria for the determination of Class 1E power system design features, criteria for sharing Class 1E power systems in multiunit stations, and the requirements for their testing and surveillance.<br />\n \t\t\t\t """ #metaKeywords: null #metaDescription: null #shortDescription: "IEEE Standard Criteria for Class 1E Power Systems for Nuclear Power Generating Stations" -notes: "Superseded" } ] #currentLocale: "en_US" #currentTranslation: null #fallbackLocale: "en_US" #variantSelectionMethod: "match" #productTaxons: Doctrine\ORM\PersistentCollection {#128415 …} #channels: Doctrine\ORM\PersistentCollection {#128408 …} #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7308 …} #reviews: Doctrine\ORM\PersistentCollection {#128412 …} #averageRating: 0.0 #images: Doctrine\ORM\PersistentCollection {#128410 …} -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7422 …} -subscriptionCollections: Doctrine\ORM\PersistentCollection {#128422 …} -apiLastModifiedAt: DateTime @1754517600 {#128381 : 2025-08-07 00:00:00.0 Europe/Paris (+02:00) } -lastUpdatedAt: DateTime @1578006000 {#128423 : 2020-01-03 00:00:00.0 Europe/Paris (+01:00) } -author: "" -publishedAt: DateTime @340585200 {#128430 : 1980-10-17 00:00:00.0 Europe/Paris (+01:00) } -releasedAt: null -confirmedAt: null -canceledAt: null -edition: null -coreDocument: "308" -bookCollection: "" -pageCount: 28 -documents: Doctrine\ORM\PersistentCollection {#128421 …} -favorites: Doctrine\ORM\PersistentCollection {#128419 …} } "layout" => "vertical" "showPrice" => true "showStatusBadges" => true "additionalClasses" => "product__teaser--with-grey-border" "hasStretchedLink" => true "hoverType" => "shadow" "linkLabel" => "See more" ] |
|||
| Attributes | [] |
|||
| Component | App\Twig\Components\ProductCard {#128474 +product: App\Entity\Product\Product {#128388 #id: 8461 #code: "IEEE00000505" #attributes: Doctrine\ORM\PersistentCollection {#128406 …} #variants: Doctrine\ORM\PersistentCollection {#128404 …} #options: Doctrine\ORM\PersistentCollection {#128399 …} #associations: Doctrine\ORM\PersistentCollection {#128402 …} #createdAt: DateTime @1751037435 {#128395 : 2025-06-27 17:17:15.0 Europe/Paris (+02:00) } #updatedAt: DateTime @1754606304 {#128429 : 2025-08-08 00:38:24.0 Europe/Paris (+02:00) } #enabled: true #translations: Doctrine\ORM\PersistentCollection {#128417 …} #translationsCache: [ "en_US" => App\Entity\Product\ProductTranslation {#128506 #locale: "en_US" #translatable: App\Entity\Product\Product {#128388} #id: 28853 #name: "IEEE 308:1980" #slug: "ieee-308-1980-ieee00000505-240113" #description: """ New IEEE Standard - Superseded.<br />\n Superseded by 308-1991. Class 1E portions of AC and DC power systems and instrumentation and control power systems in single-unit and multiunit nuclear power generating stations are covered. Not included are the preferred power supply; unit generator(s) and their buses; generator breaker; step-up, auxiliary, and start-up transformers; connections to the station switchyard; switchyard; transmission lines; and the transmission network. The intent is to provide criteria for the determination of Class 1E power system design features, criteria for sharing Class 1E power systems in multiunit stations, and the requirements for their testing and surveillance.<br />\n \t\t\t\t """ #metaKeywords: null #metaDescription: null #shortDescription: "IEEE Standard Criteria for Class 1E Power Systems for Nuclear Power Generating Stations" -notes: "Superseded" } ] #currentLocale: "en_US" #currentTranslation: null #fallbackLocale: "en_US" #variantSelectionMethod: "match" #productTaxons: Doctrine\ORM\PersistentCollection {#128415 …} #channels: Doctrine\ORM\PersistentCollection {#128408 …} #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7308 …} #reviews: Doctrine\ORM\PersistentCollection {#128412 …} #averageRating: 0.0 #images: Doctrine\ORM\PersistentCollection {#128410 …} -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7422 …} -subscriptionCollections: Doctrine\ORM\PersistentCollection {#128422 …} -apiLastModifiedAt: DateTime @1754517600 {#128381 : 2025-08-07 00:00:00.0 Europe/Paris (+02:00) } -lastUpdatedAt: DateTime @1578006000 {#128423 : 2020-01-03 00:00:00.0 Europe/Paris (+01:00) } -author: "" -publishedAt: DateTime @340585200 {#128430 : 1980-10-17 00:00:00.0 Europe/Paris (+01:00) } -releasedAt: null -confirmedAt: null -canceledAt: null -edition: null -coreDocument: "308" -bookCollection: "" -pageCount: 28 -documents: Doctrine\ORM\PersistentCollection {#128421 …} -favorites: Doctrine\ORM\PersistentCollection {#128419 …} } +layout: "vertical" +showPrice: true +showStatusBadges: true +additionalClasses: "product__teaser--with-grey-border" +linkLabel: "See more" +imageFilter: "product_thumbnail_teaser" +hasStretchedLink: true +backgroundColor: "white" +hoverType: "shadow" } |
|||
| ProductState | App\Twig\Components\ProductState | 206.0 MiB | 0.15 ms | |
|---|---|---|---|---|
| Input props | [ "product" => App\Entity\Product\Product {#128388 #id: 8461 #code: "IEEE00000505" #attributes: Doctrine\ORM\PersistentCollection {#128406 …} #variants: Doctrine\ORM\PersistentCollection {#128404 …} #options: Doctrine\ORM\PersistentCollection {#128399 …} #associations: Doctrine\ORM\PersistentCollection {#128402 …} #createdAt: DateTime @1751037435 {#128395 : 2025-06-27 17:17:15.0 Europe/Paris (+02:00) } #updatedAt: DateTime @1754606304 {#128429 : 2025-08-08 00:38:24.0 Europe/Paris (+02:00) } #enabled: true #translations: Doctrine\ORM\PersistentCollection {#128417 …} #translationsCache: [ "en_US" => App\Entity\Product\ProductTranslation {#128506 #locale: "en_US" #translatable: App\Entity\Product\Product {#128388} #id: 28853 #name: "IEEE 308:1980" #slug: "ieee-308-1980-ieee00000505-240113" #description: """ New IEEE Standard - Superseded.<br />\n Superseded by 308-1991. Class 1E portions of AC and DC power systems and instrumentation and control power systems in single-unit and multiunit nuclear power generating stations are covered. Not included are the preferred power supply; unit generator(s) and their buses; generator breaker; step-up, auxiliary, and start-up transformers; connections to the station switchyard; switchyard; transmission lines; and the transmission network. The intent is to provide criteria for the determination of Class 1E power system design features, criteria for sharing Class 1E power systems in multiunit stations, and the requirements for their testing and surveillance.<br />\n \t\t\t\t """ #metaKeywords: null #metaDescription: null #shortDescription: "IEEE Standard Criteria for Class 1E Power Systems for Nuclear Power Generating Stations" -notes: "Superseded" } ] #currentLocale: "en_US" #currentTranslation: null #fallbackLocale: "en_US" #variantSelectionMethod: "match" #productTaxons: Doctrine\ORM\PersistentCollection {#128415 …} #channels: Doctrine\ORM\PersistentCollection {#128408 …} #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7308 …} #reviews: Doctrine\ORM\PersistentCollection {#128412 …} #averageRating: 0.0 #images: Doctrine\ORM\PersistentCollection {#128410 …} -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7422 …} -subscriptionCollections: Doctrine\ORM\PersistentCollection {#128422 …} -apiLastModifiedAt: DateTime @1754517600 {#128381 : 2025-08-07 00:00:00.0 Europe/Paris (+02:00) } -lastUpdatedAt: DateTime @1578006000 {#128423 : 2020-01-03 00:00:00.0 Europe/Paris (+01:00) } -author: "" -publishedAt: DateTime @340585200 {#128430 : 1980-10-17 00:00:00.0 Europe/Paris (+01:00) } -releasedAt: null -confirmedAt: null -canceledAt: null -edition: null -coreDocument: "308" -bookCollection: "" -pageCount: 28 -documents: Doctrine\ORM\PersistentCollection {#128421 …} -favorites: Doctrine\ORM\PersistentCollection {#128419 …} } ] |
|||
| Attributes | [ "showFullLabel" => false ] |
|||
| Component | App\Twig\Components\ProductState {#128510 +product: App\Entity\Product\Product {#128388 #id: 8461 #code: "IEEE00000505" #attributes: Doctrine\ORM\PersistentCollection {#128406 …} #variants: Doctrine\ORM\PersistentCollection {#128404 …} #options: Doctrine\ORM\PersistentCollection {#128399 …} #associations: Doctrine\ORM\PersistentCollection {#128402 …} #createdAt: DateTime @1751037435 {#128395 : 2025-06-27 17:17:15.0 Europe/Paris (+02:00) } #updatedAt: DateTime @1754606304 {#128429 : 2025-08-08 00:38:24.0 Europe/Paris (+02:00) } #enabled: true #translations: Doctrine\ORM\PersistentCollection {#128417 …} #translationsCache: [ "en_US" => App\Entity\Product\ProductTranslation {#128506 #locale: "en_US" #translatable: App\Entity\Product\Product {#128388} #id: 28853 #name: "IEEE 308:1980" #slug: "ieee-308-1980-ieee00000505-240113" #description: """ New IEEE Standard - Superseded.<br />\n Superseded by 308-1991. Class 1E portions of AC and DC power systems and instrumentation and control power systems in single-unit and multiunit nuclear power generating stations are covered. Not included are the preferred power supply; unit generator(s) and their buses; generator breaker; step-up, auxiliary, and start-up transformers; connections to the station switchyard; switchyard; transmission lines; and the transmission network. The intent is to provide criteria for the determination of Class 1E power system design features, criteria for sharing Class 1E power systems in multiunit stations, and the requirements for their testing and surveillance.<br />\n \t\t\t\t """ #metaKeywords: null #metaDescription: null #shortDescription: "IEEE Standard Criteria for Class 1E Power Systems for Nuclear Power Generating Stations" -notes: "Superseded" } ] #currentLocale: "en_US" #currentTranslation: null #fallbackLocale: "en_US" #variantSelectionMethod: "match" #productTaxons: Doctrine\ORM\PersistentCollection {#128415 …} #channels: Doctrine\ORM\PersistentCollection {#128408 …} #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7308 …} #reviews: Doctrine\ORM\PersistentCollection {#128412 …} #averageRating: 0.0 #images: Doctrine\ORM\PersistentCollection {#128410 …} -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7422 …} -subscriptionCollections: Doctrine\ORM\PersistentCollection {#128422 …} -apiLastModifiedAt: DateTime @1754517600 {#128381 : 2025-08-07 00:00:00.0 Europe/Paris (+02:00) } -lastUpdatedAt: DateTime @1578006000 {#128423 : 2020-01-03 00:00:00.0 Europe/Paris (+01:00) } -author: "" -publishedAt: DateTime @340585200 {#128430 : 1980-10-17 00:00:00.0 Europe/Paris (+01:00) } -releasedAt: null -confirmedAt: null -canceledAt: null -edition: null -coreDocument: "308" -bookCollection: "" -pageCount: 28 -documents: Doctrine\ORM\PersistentCollection {#128421 …} -favorites: Doctrine\ORM\PersistentCollection {#128419 …} } +appearance: "state-suspended" +labels: [ "Superseded" ] -stateAttributeCode: "state" -localeContext: Sylius\Component\Locale\Context\CompositeLocaleContext {#1833 …} } |
|||
| ProductMostRecent | App\Twig\Components\ProductMostRecent | 206.0 MiB | 0.66 ms | |
|---|---|---|---|---|
| Input props | [ "product" => App\Entity\Product\Product {#128388 #id: 8461 #code: "IEEE00000505" #attributes: Doctrine\ORM\PersistentCollection {#128406 …} #variants: Doctrine\ORM\PersistentCollection {#128404 …} #options: Doctrine\ORM\PersistentCollection {#128399 …} #associations: Doctrine\ORM\PersistentCollection {#128402 …} #createdAt: DateTime @1751037435 {#128395 : 2025-06-27 17:17:15.0 Europe/Paris (+02:00) } #updatedAt: DateTime @1754606304 {#128429 : 2025-08-08 00:38:24.0 Europe/Paris (+02:00) } #enabled: true #translations: Doctrine\ORM\PersistentCollection {#128417 …} #translationsCache: [ "en_US" => App\Entity\Product\ProductTranslation {#128506 #locale: "en_US" #translatable: App\Entity\Product\Product {#128388} #id: 28853 #name: "IEEE 308:1980" #slug: "ieee-308-1980-ieee00000505-240113" #description: """ New IEEE Standard - Superseded.<br />\n Superseded by 308-1991. Class 1E portions of AC and DC power systems and instrumentation and control power systems in single-unit and multiunit nuclear power generating stations are covered. Not included are the preferred power supply; unit generator(s) and their buses; generator breaker; step-up, auxiliary, and start-up transformers; connections to the station switchyard; switchyard; transmission lines; and the transmission network. The intent is to provide criteria for the determination of Class 1E power system design features, criteria for sharing Class 1E power systems in multiunit stations, and the requirements for their testing and surveillance.<br />\n \t\t\t\t """ #metaKeywords: null #metaDescription: null #shortDescription: "IEEE Standard Criteria for Class 1E Power Systems for Nuclear Power Generating Stations" -notes: "Superseded" } ] #currentLocale: "en_US" #currentTranslation: null #fallbackLocale: "en_US" #variantSelectionMethod: "match" #productTaxons: Doctrine\ORM\PersistentCollection {#128415 …} #channels: Doctrine\ORM\PersistentCollection {#128408 …} #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7308 …} #reviews: Doctrine\ORM\PersistentCollection {#128412 …} #averageRating: 0.0 #images: Doctrine\ORM\PersistentCollection {#128410 …} -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7422 …} -subscriptionCollections: Doctrine\ORM\PersistentCollection {#128422 …} -apiLastModifiedAt: DateTime @1754517600 {#128381 : 2025-08-07 00:00:00.0 Europe/Paris (+02:00) } -lastUpdatedAt: DateTime @1578006000 {#128423 : 2020-01-03 00:00:00.0 Europe/Paris (+01:00) } -author: "" -publishedAt: DateTime @340585200 {#128430 : 1980-10-17 00:00:00.0 Europe/Paris (+01:00) } -releasedAt: null -confirmedAt: null -canceledAt: null -edition: null -coreDocument: "308" -bookCollection: "" -pageCount: 28 -documents: Doctrine\ORM\PersistentCollection {#128421 …} -favorites: Doctrine\ORM\PersistentCollection {#128419 …} } ] |
|||
| Attributes | [] |
|||
| Component | App\Twig\Components\ProductMostRecent {#128588 +product: App\Entity\Product\Product {#128388 #id: 8461 #code: "IEEE00000505" #attributes: Doctrine\ORM\PersistentCollection {#128406 …} #variants: Doctrine\ORM\PersistentCollection {#128404 …} #options: Doctrine\ORM\PersistentCollection {#128399 …} #associations: Doctrine\ORM\PersistentCollection {#128402 …} #createdAt: DateTime @1751037435 {#128395 : 2025-06-27 17:17:15.0 Europe/Paris (+02:00) } #updatedAt: DateTime @1754606304 {#128429 : 2025-08-08 00:38:24.0 Europe/Paris (+02:00) } #enabled: true #translations: Doctrine\ORM\PersistentCollection {#128417 …} #translationsCache: [ "en_US" => App\Entity\Product\ProductTranslation {#128506 #locale: "en_US" #translatable: App\Entity\Product\Product {#128388} #id: 28853 #name: "IEEE 308:1980" #slug: "ieee-308-1980-ieee00000505-240113" #description: """ New IEEE Standard - Superseded.<br />\n Superseded by 308-1991. Class 1E portions of AC and DC power systems and instrumentation and control power systems in single-unit and multiunit nuclear power generating stations are covered. Not included are the preferred power supply; unit generator(s) and their buses; generator breaker; step-up, auxiliary, and start-up transformers; connections to the station switchyard; switchyard; transmission lines; and the transmission network. The intent is to provide criteria for the determination of Class 1E power system design features, criteria for sharing Class 1E power systems in multiunit stations, and the requirements for their testing and surveillance.<br />\n \t\t\t\t """ #metaKeywords: null #metaDescription: null #shortDescription: "IEEE Standard Criteria for Class 1E Power Systems for Nuclear Power Generating Stations" -notes: "Superseded" } ] #currentLocale: "en_US" #currentTranslation: null #fallbackLocale: "en_US" #variantSelectionMethod: "match" #productTaxons: Doctrine\ORM\PersistentCollection {#128415 …} #channels: Doctrine\ORM\PersistentCollection {#128408 …} #mainTaxon: Proxies\__CG__\App\Entity\Taxonomy\Taxon {#7308 …} #reviews: Doctrine\ORM\PersistentCollection {#128412 …} #averageRating: 0.0 #images: Doctrine\ORM\PersistentCollection {#128410 …} -supplier: Proxies\__CG__\App\Entity\Supplier\Supplier {#7422 …} -subscriptionCollections: Doctrine\ORM\PersistentCollection {#128422 …} -apiLastModifiedAt: DateTime @1754517600 {#128381 : 2025-08-07 00:00:00.0 Europe/Paris (+02:00) } -lastUpdatedAt: DateTime @1578006000 {#128423 : 2020-01-03 00:00:00.0 Europe/Paris (+01:00) } -author: "" -publishedAt: DateTime @340585200 {#128430 : 1980-10-17 00:00:00.0 Europe/Paris (+01:00) } -releasedAt: null -confirmedAt: null -canceledAt: null -edition: null -coreDocument: "308" -bookCollection: "" -pageCount: 28 -documents: Doctrine\ORM\PersistentCollection {#128421 …} -favorites: Doctrine\ORM\PersistentCollection {#128419 …} } +label: "Historical" +icon: "historical" -mostRecentAttributeCode: "most_recent" -localeContext: Sylius\Component\Locale\Context\CompositeLocaleContext {#1833 …} } |
|||